Inspections for the day of: Thursday, January 31, 2019.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBrian Scoles
TitleMEC INSPECTOR
Phone #914-4915
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC18-05550 Final1/31/20191/31/20191/31/2019 4:17:15 PMPPASS
Tim Phone #: ###-####- a/c only co ok
MEC19-00392 Final1/28/20191/31/20191/31/2019 3:39:17 PMPPASS
Please call John to ensure install is complete. Thank you! ###-#### Phone #: ###-#### Inspection requested via web by Rick Borg- electric air handler with electric heat assist heat pump ok
MEC19-00453 Pressure Test1/31/20191/31/20191/31/2019 3:07:08 PMPPASS
Phone #: ###-#### Inspection requested via web by Marisa Hone- 20lb gas pass from meter to furnace location- tagged gas line at meter location
MEC19-00439 Final1/30/20191/31/20191/31/2019 2:31:09 PMPPASS
need pressure test on flu vent want inspection late as possible call Jeff ###-#### Phone #: ###-#### Inspection requested via web by Kim Lithander- furnace a/c coil co ok- 5lb flue test pass
MEC19-00446 Final1/31/20191/31/20191/31/2019 1:38:34 PMPPASS
Call ahead // Barb Phone #: ###-####- moved 2 supply lines into new room addition- final ok
MEC18-05917 Conference1/30/20191/31/20191/31/2019 11:30:16 AMADONE
please call dru 1 hr in advance so all parties can be in attendance for insulation questions. Phone #: ###-#### Inspection requested via web by Nicholas Paige- conference to discuss IECC insulation requirements- all supply, return air and outside air will need to be insulated per IECC 2015 C403.9-
MEC19-00413 Final1/30/20191/31/20191/31/2019 10:39:13 AMAPASS
Access to mechanical room in back of building. Lock box 4848 Phone #: ###-#### Inspection requested via web by Michael Stimpson- furnace a/c coil ok
MEC19-00399 Final1/30/20191/31/20191/31/2019 10:17:43 AMAPASS
Phone #: ###-#### Inspection requested via web by Mary LaFayette- furnace in crawl co ok
MEC19-00382 Final1/30/20191/31/20191/31/2019 9:44:37 AMAFAIL
PLEASE CALL STERLING WHEN 30 MINS IN ROUTE Phone #: ###-#### Inspection requested via web by Rick Montgomery- furnace a/c coil co ok- bubble wrap insulation needs 3/4" air gap per installation instructions to maintain R-6 value whats installed on meets R-4.2- talked with steve about this by phone
MEC18-04798 Final1/30/20191/31/20191/31/2019 9:14:39 AMAFAIL
Client will be at location at 9am. Please call prior to arrival at ###-####
Thank you Inspection requested via web by Andrea Grigsby- furnace a/c coil co ok- flue from furnace needs grade has sag
MEC17-05004 Mec-Aging Inspection1/31/20191/31/20191/31/2019 8:42:37 AM FAIL
needs inspection called in
MEC17-05015 Mec-Aging Inspection1/31/20191/31/20191/31/2019 8:42:16 AM FAIL
conttractor needs to schedule final inspection
MEC17-05018 Mec-Aging Inspection1/31/20191/31/20191/31/2019 8:41:42 AM FAIL
contractor needs to schedule final inspection
MEC19-00451 Final1/31/20191/31/20191/31/2019 8:21:43 AMPCANC
Please call John to ensure install is complete. Thank you! ###-#### Phone #: ###-#### >> Inspection requested via web by Rick Borg Inspection cancelled from web by: Rick Borg