Inspections for the day of: Friday, January 4, 2019.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBrian Scoles
TitleMEC INSPECTOR
Phone #914-4915
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC18-06006 Final1/4/20191/4/20191/4/2019 4:12:19 PMPPASS
installer ###-####- flue test and final- 2 furnaces 2 a/c coil co ok- 5lb flue test pass both furnaces
MEC18-06133 Final1/3/20191/4/20191/4/2019 3:51:03 PMPPASS
Phone #: ###-#### Inspection requested via web by Marisa Hone- furnace a/c coil co ok
MEC18-05646 Rough-in1/3/20191/4/20191/4/2019 3:25:08 PMPPASS
Phone #: ###-#### Inspection requested via web by Dan Otero- fireplace R/I ok
MEC19-00049 Final1/4/20191/4/20191/4/2019 2:54:02 PMPNH
Inspection requested via web by Margie Rowe- no one home- rang doorbell and knocked waited 5 mins no answer
MEC18-05489 Final1/3/20191/4/20191/4/2019 2:23:13 PMPPASS
Please call Yolanda prior to inspection. ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette- furnace a/c coil co ok
MEC18-05070 Final1/4/20191/4/20191/4/2019 1:53:05 PMPPASS
gas leak was fixed- furnace a/c coil co ok
MEC19-00031 Final1/3/20191/4/20191/4/2019 1:43:14 PMPPASS
INSTALLER JAROD ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- furnace a/c coil co ok
MEC18-02348 Final1/4/20191/4/20191/4/2019 1:21:54 PMPPASS
no manual j needed for ducted mini split- mini split ok
MEC19-00016 Final1/2/20191/4/20191/4/2019 11:16:29 AMAPASS
Final inspection and flue test. We will call inspector 30 minutes prior to doing flue test. Phone #: ###-#### Inspection requested via web by Julie McMillan- furnace co ok- 5lb flue test pass
MEC18-05284 Rough-in1/3/20191/4/20191/4/2019 10:30:36 AMAPASS
Cover for Christian Faith Center, please call Mike ###-#### Phone #: ###-#### Inspection requested via web by Heather Gransbery- R/I ok- flex registers insulation ok- ok for ceiling tiles all areas- need to move electric heater in fire riser room to 8" off floor per fan installation instructions- need to look at regulators on roof at final and water heater fluing and verify RTU 1 2 3 & 4 have smoke detectors installed
MEC18-05928 Final12/31/20181/4/20191/4/2019 9:27:29 AMAFAIL
Please have inspector call the owner Paul ; Darla Cary when in route to home.
###-#### Phone #: ###-#### Inspection requested via web by Carolyn Rudd- b vent in attic needs insulation shield- all b vent needs 1" clearance to combustibles in furnace closet need to adjust- furnace a/c coil co ok
MEC18-05725 Final1/3/20191/4/20191/4/2019 9:09:30 AMACANC
Phone #: ###-#### >> Inspection requested via web by Marisa Hone Inspection cancelled from web by: Marisa Hone
MEC18-04329 Final1/2/20191/4/20191/4/2019 8:52:06 AMAFAIL
Please call client prior to arrival at ###-####.
Thank you Phone #: ###-#### Inspection requested via web by Andrea Grigsby- bubble wrap insulation needs 3/4" air gap to maintain R-6 on supply and return ducts
MEC18-01532 Mec-Aging Inspection1/4/20191/4/20191/4/2019 8:06:19 AM PASS
plumbing permit was issued
MEC18-01532 Final1/4/20191/4/20191/4/2019 8:05:57 AMAPASS
furnace a/c coil co ok-
MEC18-00026 Mec-Aging Inspection1/4/20191/4/20191/4/2019 8:05:21 AM FAIL
contractor needs to schedule inspection with homeowner