MEC18-05261
| Rough-in | 11/1/2018 | 11/2/2018 | 11/2/2018 3:11:31 PM | P | PART |
|
|
INSTALLER RYAN ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- R/I ok- will pass this inspetion when gas pressure test is completed- not sure where penetration will be in wall or floor
|
MEC18-05260
| Final | 11/2/2018 | 11/2/2018 | 11/2/2018 2:41:34 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette- furnace co ok
|
MEC18-05268
| Pressure Test | 11/1/2018 | 11/2/2018 | 11/2/2018 1:49:00 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jason Adams- 20lb gas pass from meter underground to new garage- ok for backfill- install shut off valve at garage location by final
|
MEC18-05274
| Final | 11/1/2018 | 11/2/2018 | 11/2/2018 1:40:06 PM | P | CANC |
|
|
Please call technician Chris Matos at ###-#### before arrival. Thank you Phone #: ###-#### >> Inspection requested via web by Andrea Grigsby Inspection cancelled from web by: Andrea Grigsby
|
MEC18-04023
| Rough-in | 11/2/2018 | 11/2/2018 | 11/2/2018 12:29:58 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- 3rd floor areas A & B from column L west ok for ceiling tiles register and flex all good- area C 1st floor SW entrance hard lid west wall lobby/desk area ok for sheet rock
|
MEC18-03406
| Final | 11/1/2018 | 11/2/2018 | 11/2/2018 11:23:50 AM | A | PART |
|
|
Final Inspection - Contact Rich ###-#### Phone #: ###-#### Inspection requested via web by Beka Hereau- temp occupancy ok- need uv protection on lineset on roof- need clarification on missing R/A 2nd floor not there is engineer ok without it- rest is good
|
MEC18-05212
| Final | 11/1/2018 | 11/2/2018 | 11/2/2018 11:12:28 AM | A | PASS |
|
|
Mechanical Final inspection needed if you have questions contact Zack he can be reached at ###-####. There is a door code 3110 Phone #: ###-#### Inspection requested via web by Karl Hestekin- R/I ok
|
MEC18-05163
| Rough-in | 11/2/2018 | 11/2/2018 | 11/2/2018 10:40:09 AM | A | PASS |
|
|
Light test and dish hood rough in. Will be ready by 9:30. Inspection requested via web by Drew Tverdy- light test on class 1 hood ok- class 2 hood seal ok-
|
MEC18-02516
| Final | 11/1/2018 | 11/2/2018 | 11/2/2018 9:42:42 AM | A | PASS |
|
|
Don-please call 30 minutes prior to meet Phone #: ###-####- 20lb gas pass-tagged meter- unit heater install co ok
|
MEC18-05255
| Final | 11/1/2018 | 11/2/2018 | 11/2/2018 8:57:43 AM | A | FAIL |
|
|
if possible can you please be closer to 9 am when someone is home that would be great Phone #: ###-#### Inspection requested via web by Marisa Hone- need to witness flue test- rubber connector on flue can not be used not approved unless it is sent from furnace manufacture0 condesate drain needs to run to approved location washer box is taped off
|
MEC18-05272
| Pressure Test | 11/1/2018 | 11/2/2018 | 11/2/2018 8:38:54 AM | A | PASS |
|
|
Pressure test inspection to unit heater in the back, call Tobi with any questions ###-#### Phone #: ###-#### Inspection requested via web by TOBI WLSON- 60lb gas pass
|
MEC18-00533
| Mec-Aging Inspection | 11/2/2018 | 11/2/2018 | 11/2/2018 8:04:23 AM | | FAIL |
|
|
needs correction made and called in for final by contractor
|
MEC18-00535
| Mec-Aging Inspection | 11/2/2018 | 11/2/2018 | 11/2/2018 8:03:46 AM | | FAIL |
|
|
needs rescheduled by contractor with homeowner
|
MEC18-04293
| Final | 10/31/2018 | 11/2/2018 | 11/2/2018 7:50:46 AM | A | CANC |
|
|
Please inspect in the AM. No garage code yet, the key is in the outlet by the front door. Phone #: ###-#### >> Inspection requested via web by Arielle Hendricks Inspection cancelled from web by: Arielle Hendricks
|