MEC18-05571
| Final | 12/5/2018 | 12/12/2018 | 12/12/2018 4:11:46 PM | P | PASS |
|
|
tech will be on site for pressure witness Bob ###-#### -- or call homeowner Heidi ###-#### when in route Phone #: ###-#### Inspection requested via web by Justin Osterhout- furnace a/c coil co ok
|
MEC18-05571
| Pressure Test | 12/5/2018 | 12/12/2018 | 12/12/2018 4:09:32 PM | P | CANC |
|
|
tech will be on site for pressure witness Bob ###-#### -- or call homeowner Heidi ###-#### when in route Phone #: ###-#### Inspection requested via web by Justin Osterhout -not needed
|
MEC18-04856
| Final | 12/12/2018 | 12/12/2018 | 12/12/2018 3:52:16 PM | P | PASS |
|
|
MEC AND FIREPL GARage CODE 7373 Phone #: ###-#### Inspection requested via web by Oleg Chervak
|
MEC18-04701
| Final | 12/12/2018 | 12/12/2018 | 12/12/2018 3:52:01 PM | P | PASS |
|
|
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak
|
MEC18-05937
| Rough-in | 12/11/2018 | 12/12/2018 | 12/12/2018 3:28:42 PM | P | PASS |
|
|
Inspect kitchen hood ductwork and relocated supplies Phone #: ###-#### Inspection requested via web by Eric Sonner- R/I ok
|
MEC18-05940
| Rough-in | 12/12/2018 | 12/12/2018 | 12/12/2018 3:05:06 PM | P | CANC |
|
|
Flue test, please call installer 30 minutes in advance at ###-#### and call Ryan with any questions at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Lea Briggs
|
MEC18-05940
| Final | 12/12/2018 | 12/12/2018 | 12/12/2018 3:04:56 PM | P | PASS |
|
|
Flue test, please call installer 30 minutes in advance at ###-#### and call Ryan with any questions at ###-####. Thank you Phone #: ###-#### Inspection requested via web by Lea Briggs- furnace co ok
|
MEC18-05760
| Final | 12/7/2018 | 12/12/2018 | 12/12/2018 2:43:46 PM | P | FAIL |
|
|
Please call prior to arrival at ###-#### Thank you Phone #: ###-#### Inspection requested via web by Andrea Grigsby- needs flue test witnessed- does flue exhaust need a drain?- furnace installed needs a mobile home kit provided by bryant dealer- Ron Garvin will be contacting you to further this along
|
MEC18-05879
| Pressure Test | 12/12/2018 | 12/12/2018 | 12/12/2018 1:44:15 PM | P | PASS |
|
|
20lb gas pass
|
MEC18-05922
| Pressure Test | 12/12/2018 | 12/12/2018 | 12/12/2018 1:29:22 PM | P | PASS |
|
|
20lb gas pass- range csst was rerouted
|
MEC18-05922
| Rough-in | 12/12/2018 | 12/12/2018 | 12/12/2018 1:26:57 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN- insulation shield needs to be 7" or larger to maintain 1" clearance-
|
MEC18-05921
| Rough-in | 12/12/2018 | 12/12/2018 | 12/12/2018 1:22:16 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN- insulation shield is not installed now- needs to be 7" round or bigger to maintain 1" clearance to b vent- need to retest gas line since it was rerouted at range to different location
|
MEC18-05941
| Pressure Test | 12/12/2018 | 12/12/2018 | 12/12/2018 1:15:59 PM | P | PASS |
|
|
Inspection requested via web by Floyd Floyd Peek- 20lb gas pass- ok to backfill
|
MEC18-05941
| Final | 12/12/2018 | 12/12/2018 | 12/12/2018 1:15:41 PM | P | PASS |
|
|
Inspection requested via web by Floyd Floyd Peek
|
MEC18-05885
| Pressure Test | 12/12/2018 | 12/12/2018 | 12/12/2018 1:15:23 PM | P | PASS |
|
|
Inspection requested via web by Floyd Floyd Peek- 20lb gas pass- ok to backfill
|
MEC18-05885
| Final | 12/12/2018 | 12/12/2018 | 12/12/2018 1:15:02 PM | P | PASS |
|
|
Inspection requested via web by Floyd Floyd Peek
|
MEC18-05526
| Rough-in | 12/11/2018 | 12/12/2018 | 12/12/2018 11:22:42 AM | A | FAIL |
|
|
Partial rough in Phone #: ###-#### Inspection requested via web by RM Mechanical- need city approved drawings onsite to do inspection- none could be found- seal on misc duct ok
|
MIS18-00461
| MEC-Conference | 12/11/2018 | 12/12/2018 | 12/12/2018 10:52:32 AM | A | PASS |
|
|
per Matt W-mech work done w/o permits- capital city will pull mech permit for exhaust fan and 3 supply ducts- talked to Max about this with capital city- will call in inspection when ready
|
MEC18-05879
| Rough-in | 12/11/2018 | 12/12/2018 | 12/12/2018 10:28:09 AM | A | PASS |
|
|
re rough Code: 2468 Phone #: ###-#### Inspection requested via web by Randy Hart- R/I ok
|
MEC18-05903
| Pressure Test | 12/11/2018 | 12/12/2018 | 12/12/2018 9:45:45 AM | A | FAIL |
|
|
Please contact the contractor Greg Bauer at ###-#### when your on your way so he can meet you there. Phone #: ###-#### Inspection requested via web by David Dixon- 2lb gas test needs 100 pound gauge max with 60lb test on line- need drip leg after shut off valve before regulator on unit heater-
|
MEC18-05891
| Final | 12/10/2018 | 12/12/2018 | 12/12/2018 8:52:30 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette- furnace co ok
|