MEC18-05687
| Final | 12/3/2018 | 12/4/2018 | 12/4/2018 4:15:27 PM | P | PASS |
|
|
Please call and give lead time so Susan can meet you. Phone #: ###-#### Inspection requested via web by Amber Orr- furnace a/c coil co ok
|
MEC18-05750
| Final | 11/29/2018 | 12/4/2018 | 12/4/2018 3:48:28 PM | P | PART |
|
|
Please give homeowner 30 minute notice before arrival. Her name is Amorn, her number is ###-####. Phone #: ###-#### Inspection requested via web by Rick Montgomery- need to provide co dector in hallway
|
MEC18-05770
| Final | 12/4/2018 | 12/4/2018 | 12/4/2018 3:14:45 PM | P | PASS |
|
|
|
MEC18-05770
| Pressure Test | 11/30/2018 | 12/4/2018 | 12/4/2018 3:14:09 PM | P | PASS |
|
|
Please call Jake when you are on your way at ###-#### Phone #: ###-#### Inspection requested via web by Angie Pereira- 20lb gas pass from meter to range location- co ok
|
MEC18-05235
| Final | 12/4/2018 | 12/4/2018 | 12/4/2018 3:13:02 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Marisa Hone- radiant heater gas piping final ok
|
MEC18-05141
| Final | 12/4/2018 | 12/4/2018 | 12/4/2018 2:29:40 PM | P | PASS |
|
|
final ok
|
MEC18-05765
| Final | 12/4/2018 | 12/4/2018 | 12/4/2018 2:29:20 PM | P | PASS |
|
|
Randy Phone #: ###-####- cooler final ok
|
MEC18-05163
| Final | 12/4/2018 | 12/4/2018 | 12/4/2018 2:29:02 PM | P | PASS |
|
|
Duct is insulated and sealed. Should be good. Phone #: ###-#### Inspection requested via web by Drew Tverdy- final ok- airbalance ok-
|
MEC18-05759
| Final | 12/4/2018 | 12/4/2018 | 12/4/2018 1:48:29 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette- furnace co ok
|
MEC18-05569
| Final | 12/4/2018 | 12/4/2018 | 12/4/2018 1:12:45 PM | P | PASS |
|
|
Homeowner asked if it was possible to come by between noon and 1:00. if possible. Phone #: ###-#### Inspection requested via web by Kim Evans- electric furnace coil heat pump ok
|
MEC18-05766
| Final | 11/30/2018 | 12/4/2018 | 12/4/2018 12:11:42 PM | P | PASS |
|
|
INSTALLER BRANDAN ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- furnace in crawl co ok- 5lb flue test pass
|
MEC18-05284
| Pressure Test | 12/3/2018 | 12/4/2018 | 12/4/2018 11:28:12 AM | A | FAIL |
|
|
Gas pressure 60lbs for Faith Christian, please call Mike Dominguez ###-####. Phone #: ###-#### Inspection requested via web by Heather Gransbery- gauge at 28psi
|
MEC18-04318
| Final | 12/4/2018 | 12/4/2018 | 12/4/2018 10:47:49 AM | A | PASS |
|
|
final ok- card signed
|
MEC18-05517
| Final | 12/3/2018 | 12/4/2018 | 12/4/2018 10:25:05 AM | A | PASS |
|
|
This is a Flue Pressure and Final Inspect. Please meet our installer at home at 10:00 AM. Contact for Right Now is Mary ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette- furnace co ok- 5lb flue test pass
|
MEC18-04798
| Final | 11/29/2018 | 12/4/2018 | 12/4/2018 10:00:36 AM | A | NH |
|
|
Please call client at ###-#### prior to arrival Thank you Phone #: ###-#### Inspection requested via web by Andrea Grigsby- called number listed twice no answer- went by no one their- no access
|
MEC18-05636
| Final | 11/27/2018 | 12/4/2018 | 12/4/2018 9:36:20 AM | P | PASS |
|
|
installer Jarod ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- furnace a/c coil co ok
|
MEC18-05754
| Final | 11/30/2018 | 12/4/2018 | 12/4/2018 9:11:25 AM | A | PASS |
|
|
Please call Doug at ###-#### when in route as he has to leave work to meet you there. Phone #: ###-#### Inspection requested via web by Sabrina DeHority- electric furnace a/c coil co ok
|
MEC18-04970
| Rough-in | 12/3/2018 | 12/4/2018 | 12/4/2018 8:40:09 AM | A | PASS |
|
|
Request for Cover inspection. Please contact job lead, Chris ###-#### with any questions or concerns. Inspection requested via web by Heather Gransbery- insulation ok- flex to registers ok- ok for ceiling tiles- need verification that conference room fan coil unit that was replaced with cassette unit is approved by engineer please provide documentation
|
MEC17-05511
| Mec-Aging Inspection | 12/4/2018 | 12/4/2018 | 12/4/2018 8:08:52 AM | | FAIL |
|
|
contractor needs to schedule inspection if work was done
|