Inspections for the day of: Thursday, April 18, 2019.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBrian Scoles
TitleMEC INSPECTOR
Phone #914-4915
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC19-01319 Final4/12/20194/18/20194/18/2019 4:10:00 PMPFAIL
Please call Janet or Michael in route to inspection ###-#### Phone #: ###-#### Inspection requested via web by Justin Osterhout- pvc furnace flue needs 6" clearance to single water heater flue- furnace a/c coil co ok
MEC19-00429 Final4/18/20194/18/20194/18/2019 3:26:02 PMPPASS
Phone #: ###-#### Inspection requested via web by Floyd Floyd Peek- final ok
MEC19-00975 Final4/18/20194/18/20194/18/2019 3:05:52 PMPPASS
I well send you pictures. Phone #: ###-#### Inspection requested via web by Eric Sonner- final ok
MEC19-01564 Rough-in4/17/20194/18/20194/18/2019 2:40:09 PMPPASS
Inspection requested via web by Don Dowers- R/I ok
MEC19-01378 Rough-in4/17/20194/18/20194/18/2019 2:03:20 PMPFAIL
mec and firepl Phone #: ###-#### Inspection requested via web by Oleg Chervak- need approved manual onsite for inspection
MEC19-01566 Rough-in4/18/20194/18/20194/18/2019 1:45:05 PMPFAIL
8" hood vent. Phone #: ###-#### Inspection requested via web by Eric Sonner- all range hood over 400cfm need make up air installed- talked with general contractor onsite about options
MEC19-01536 Rough-in4/17/20194/18/20194/18/2019 11:43:27 AMAPASS
Phone #: ###-#### Inspection requested via web by Andrea Creek- R/I ok
MEC19-01536 Pressure Test4/17/20194/18/20194/18/2019 11:43:12 AMAPASS
Phone #: ###-#### Inspection requested via web by Andrea Creek- 60lb gas pass tagged meter location- 20lb gas pass- 5lb flue x 2 pass
MEC19-01377 Rough-in4/18/20194/18/20194/18/2019 11:23:12 AMPCANC
ROUGH IN. GREG IS YOUR CONTACT Phone #: ###-#### Inspection requested via web by Kim Adams- did this inspection in am today with Greg
MEC18-05917 Rough-in4/18/20194/18/20194/18/2019 11:20:30 AMPPART
Phone #: ###-#### Inspection requested via web by Nicholas Paige- grease duct light test on 45 degree in ceiling 24x18 ok, 3 joints 24x18 with 20x10 and 20x10 tap ok, and 2 joints 20x10 with 90 degree ok- will see remaining weld after hood installed and welded- ok for first layer fire wrap from roof to 2nd 45 degree offset- access doors need installed
MEC19-01377 Rough-in4/18/20194/18/20194/18/2019 10:43:09 AMAPART
greg ###-####- Seal on all ducts supply and return, registers and flex ok per my initials on contractors prints
MEC19-01542 Rough-in4/17/20194/18/20194/18/2019 9:53:35 AMAPASS
Phone #: ###-#### Inspection requested via web by Ashley Shoecraft- fireplace R/I on flue ok- will check fireplace clearances at final
MEC19-01524 Final4/17/20194/18/20194/18/2019 9:24:28 AMAPASS
please call when you are on the way Phone #: ###-#### Inspection requested via web by Marisa Hone- furnace a/c coil co ok
MEC18-05203 Final4/17/20194/18/20194/18/2019 8:49:10 AMAFAIL
Please call homeowner when you are on your way Phone #: ###-#### Inspection requested via web by Andrea Grigsby- needs right size fuses in disconnect at a/c location