MEC19-01680
| Final | 4/26/2019 | 4/29/2019 | 4/29/2019 4:10:06 PM | P | PASS |
|
|
Contact - Mike @ ###-#### Phone #: ###-#### Inspection requested via web by Dianne Maxwell- rtu final ok
|
MEC19-01037
| Final | 4/29/2019 | 4/29/2019 | 4/29/2019 3:32:30 PM | P | PASS |
|
|
final ok- card signed
|
MEC19-01683
| Final | 4/29/2019 | 4/29/2019 | 4/29/2019 3:31:45 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by George Masing- unit heater final ok
|
MEC19-01509
| Rough-in | 4/29/2019 | 4/29/2019 | 4/29/2019 2:51:23 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino- fireplace and hvac R/I ok
|
MEC19-01509
| Pressure Test | 4/29/2019 | 4/29/2019 | 4/29/2019 2:50:38 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino- 20lb gas pass- 5lb flue pass
|
MEC19-01702
| Final | 4/25/2019 | 4/29/2019 | 4/29/2019 2:20:17 PM | P | PASS |
|
|
INSTALLER JAROD ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- a/c coil co ok
|
MEC19-01622
| Final | 4/29/2019 | 4/29/2019 | 4/29/2019 1:41:05 PM | P | PASS |
|
|
furnace a/c coil co ok- 5lb flue test pass
|
MEC19-01622
| Pressure Test | 4/28/2019 | 4/29/2019 | 4/29/2019 1:40:35 PM | P | PASS |
|
|
Please call technicians prior to heading out to ensure flue is on pressure and ready. Customer will not be home until after 1pm. Phone #: ###-#### Inspection requested via web by Andrea Grigsby- 5lb flue test pass
|
MEC19-01377
| Rough-in | 4/26/2019 | 4/29/2019 | 4/29/2019 11:27:01 AM | A | PART |
|
|
meet Greg at 1130 am- ###-####- R/I on insulation on supply, return air and OSA ok in attic ok to cover- still need to see exhaust fan rough in and insulation in crawl space
|
MEC18-05917
| Rough-in | 4/26/2019 | 4/29/2019 | 4/29/2019 11:07:19 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- grease duct welds ok- all welds completed on grease duct system- seal area H1 supply duct only ok to insulate
|
MEC18-05917
| Pressure Test | 4/26/2019 | 4/29/2019 | 4/29/2019 11:05:30 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- 60lb gas pass whole system- still need to see low pressure test when piping installed to cook line and boilers
|
MEC19-01703
| Pressure Test | 4/25/2019 | 4/29/2019 | 4/29/2019 10:13:49 AM | A | PASS |
|
|
Please contact owner prior to arrival. Phone #: ###-#### Inspection requested via web by Jamee Shoecraft- 20lb gas pass- need to issue fireplace permit to final this permit out
|
MEC19-01105
| Final | 4/29/2019 | 4/29/2019 | 4/29/2019 9:57:22 AM | A | PASS |
|
|
Call ed 20 min ahead Thanks Phone #: ###-#### Inspection requested via web by Manuel Canto- final ok
|
MEC19-01683
| Final | 4/26/2019 | 4/29/2019 | 4/29/2019 9:32:55 AM | A | FAIL |
|
|
Brian Phone #: ###-####- single wall flue pipe needs 6" clearance to combustibles and needs insulation shield installed
|
MEC18-06140
| Final | 4/23/2019 | 4/29/2019 | 4/29/2019 9:04:41 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Marisa Hone- need to witness flue test- furnace a/c coil co ok
|
MEC19-00452
| Conference | 4/26/2019 | 4/29/2019 | 4/29/2019 8:39:07 AM | A | PASS |
|
|
8:30 am Duct Blast Phone #: ###-#### Inspection requested via web by Debbie Marino- duct blast test pass
|
MEC19-01558
| Rough-in | 4/26/2019 | 4/29/2019 | 4/29/2019 8:24:45 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Joseph Profitt- fresh air ducting needs completed on front entry- crawl needs completed- R/A registers cans needs spotweld sealed- dryer duct needs sealed to termination box- exhaust fan bath 1 needs duct sealed to plastic at fan location- needs to straighten gas pipe at meter locstion and retest- line set needs ran on rough in stage- left correction notice front window
|
MEC19-01558
| Pressure Test | 4/26/2019 | 4/29/2019 | 4/29/2019 8:22:04 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Joseph Profitt- gas piping at meter location needs straightened and retested- 5lb flue x 2 pass
|
MEC18-03082
| Mec-Aging Inspection | 4/29/2019 | 4/29/2019 | 4/29/2019 7:57:07 AM | | FAIL |
|
|
contractor needs to schedule inspection when works completed- bld permit still open
|