MEC19-02490
| Final | 6/18/2019 | 6/19/2019 | 6/19/2019 3:48:30 PM | P | PASS |
|
|
Final for ac and furnace replacement, please call Brett with any questions, ###-#### Phone #: ###-#### Inspection requested via web by Brett Shannon- furnace a/c coil co ok
|
MEC19-02632
| Final | 6/19/2019 | 6/19/2019 | 6/19/2019 3:31:36 PM | P | PASS |
|
|
Please call Jason (###-####) 30 minutes prior to showing up. Phone #: ###-#### Inspection requested via web by Michele Johnson
|
MEC18-05608
| Final | 6/19/2019 | 6/19/2019 | 6/19/2019 2:58:01 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Aaron Alandt- need duct blast test performed on upstairs furnace- need to seal lineset penetration outside at a/c
|
MEC19-02633
| Final | 6/19/2019 | 6/19/2019 | 6/19/2019 2:38:30 PM | P | PASS |
|
|
Please call Kane (###-####) 30 minutes prior to showing up, Thank you Phone #: ###-#### Inspection requested via web by Michele Johnson- a/c coil co ok
|
MEC19-02567
| Final | 6/18/2019 | 6/19/2019 | 6/19/2019 2:19:03 PM | P | PASS |
|
|
Please call James Moison prior to inspection. ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette- a/c coil co ok
|
MEC18-03649
| Final | 6/19/2019 | 6/19/2019 | 6/19/2019 2:00:25 PM | P | PASS |
|
|
JOHN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- final ok
|
MEC19-01446
| Final | 6/19/2019 | 6/19/2019 | 6/19/2019 1:41:29 PM | P | CANC |
|
|
Call David Lopez ###-#### prior to inspection for assistance Phone #: ###-#### Inspection requested via web by Brandon Sorensen- should have been rough in inspection
|
MEC19-01446
| Rough-in | 6/19/2019 | 6/19/2019 | 6/19/2019 1:41:05 PM | P | PASS |
|
|
Call David Lopez ###-#### prior to inspection for assistance Phone #: ###-#### Inspection requested via web by Brandon Sorensen- seal on all duct ok- ok to insulate remaining duct- need another inspection for final- leave out ceiling tiles certain areas to look at insulation- went over onsite with GC and installer- exhaust on one RTU needs to be 3 feet higher than economizer within 10 feet-
|
MEC19-02514
| Final | 6/18/2019 | 6/19/2019 | 6/19/2019 1:11:40 PM | P | PASS |
|
|
Please call Doug Link prior to inspection. ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette- furnace a/c coil co ok
|
MEC19-02558
| Rough-in | 6/19/2019 | 6/19/2019 | 6/19/2019 12:49:22 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Kristy Watson- corrections not all made- supply duct in crawl still needs 4" clearance off ground at crawl hole location
|
MEC19-00677
| Final | 6/18/2019 | 6/19/2019 | 6/19/2019 12:27:32 PM | P | PASS |
|
|
Duct blast witness @ noon. Thanks Phone #: ###-#### Inspection requested via web by Gary Reeves- final ok- duct blast test pass
|
MEC19-00963
| Final | 6/18/2019 | 6/19/2019 | 6/19/2019 12:26:59 PM | P | CANC |
|
|
Duct blast witness @ noon. Thanks Phone #: ###-#### Inspection requested via web by Gary Reeves- need to reschedule did 2739 carmen witness
|
MEC19-01068
| Conference | 6/19/2019 | 6/19/2019 | 6/19/2019 12:25:54 PM | P | PASS |
|
|
duct blast test pass
|
MEC19-02278
| Final | 6/13/2019 | 6/19/2019 | 6/19/2019 11:54:32 AM | A | PASS |
|
|
This is a Flue Pressure and Final Inspect. Please meet our installer at home at 11:30 AM . Contact for Right Now is Mary ###-####
Phone #: ###-#### Inspection requested via web by Mary LaFayette- furnace gas piping co ok- 5lb flue pass
|
MEC19-02244
| Rough-in | 6/19/2019 | 6/19/2019 | 6/19/2019 8:14:51 AM | A | PART |
|
|
Cover Phone #: ###-#### Inspection requested via web by Brandon Sorensen- condensste drain needs to be ran in approved material thats plenum rated for condeser pan and minisplit head drain- registers flex and insulation ok
|
MEC18-05333
| Mec-Aging Inspection | 6/19/2019 | 6/19/2019 | 6/19/2019 7:48:58 AM | | FAIL |
|
|
contractor needs to schedule inspection if work is complete- permit will expire next aging if no activity and new pemitr will need issued after expired
|