MEC18-02508
| Final | 8/8/2018 | 8/8/2018 | 8/8/2018 3:53:56 PM | P | PASS |
|
|
|
MEC18-02507
| Final | 8/8/2018 | 8/8/2018 | 8/8/2018 3:53:31 PM | P | PASS |
|
|
|
MEC18-01799
| Final | 8/8/2018 | 8/8/2018 | 8/8/2018 3:23:27 PM | P | PASS |
|
|
final - call dave with any questions Phone #: ###-#### Inspection requested via web by Brandon Sorensen- final ok
|
MEC18-03188
| Rough-in | 8/8/2018 | 8/8/2018 | 8/8/2018 3:06:49 PM | P | PASS |
|
|
Please contact Homeowner in advanced to let know when headed that direction- Teresa @ 208.562.9295
Garage Code: 82840 Phone #: ###-#### Inspection requested via web by Dan Otero- fireplace R/I ok
|
MEC18-03406
| Rough-in | 8/8/2018 | 8/8/2018 | 8/8/2018 2:35:54 PM | P | FAIL |
|
|
Request for cover upstairs and downstairs bathroom Phone #: ###-#### Inspection requested via web by Beka Hereau- need to finish exhaust duct thru roof and seal- need to seal oval to round off fan and seal both first and second floors and attach with screws- need tranfers first floor thats missing and register installed- talked with installer onsite- recall in when ready
|
MEC18-03816
| Final | 8/7/2018 | 8/8/2018 | 8/8/2018 1:56:25 PM | P | PASS |
|
|
Field super: Chad Robertson Phone #: ###-#### Inspection requested via web by Lisa Whitney- RTU final ok
|
MEC18-02578
| Final | 8/8/2018 | 8/8/2018 | 8/8/2018 1:28:29 PM | P | PASS |
|
|
Please contact Jasper with any questions. Thanks! Phone #: ###-#### Inspection requested via web by Ted Dumont
|
MEC18-03629
| Conference | 8/7/2018 | 8/8/2018 | 8/8/2018 11:37:09 AM | A | PASS |
|
|
Blast witness @ 11:30 Phone #: ###-#### Inspection requested via web by Randy Hart- duct blast test pass
|
MEC18-00901
| Conference | 8/7/2018 | 8/8/2018 | 8/8/2018 11:11:02 AM | A | DONE |
|
|
Jordan Phone #: ###-####- discussed range ducting, exhaust fan ducting and supply duct in base and main level
|
MEC18-03733
| Final | 8/7/2018 | 8/8/2018 | 8/8/2018 9:57:51 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ron Arnold- furnace a/c coil ok
|
MEC18-03737
| Pressure Test | 8/7/2018 | 8/8/2018 | 8/8/2018 9:23:37 AM | A | FAIL |
|
|
900 to 930am- 208- ###-####- gauge wont zero out- at no point can 1 shut off valve have gas on one side and air on other- need to install 2 shutoff valves with open tee between them and use as a sediment trap- leave sediment trap out until after pressure test is completed
|
MEC18-02475
| Final | 8/6/2018 | 8/8/2018 | 8/8/2018 8:43:49 AM | A | PASS |
|
|
Duct Blast 8:30 am Phone #: ###-#### Inspection requested via web by Debbie Marino- final ok
|
MEC18-02475
| Conference | 8/6/2018 | 8/8/2018 | 8/8/2018 8:42:39 AM | A | PASS |
|
|
Duct Blast 8:30 am Phone #: ###-#### Inspection requested via web by Debbie Marino- duct blast test pass
|
MEC17-05191
| Mec-Aging Inspection | 8/8/2018 | 8/8/2018 | 8/8/2018 8:12:21 AM | | FAIL |
|
|
need flu test scheduled and correction fixed and inspection called in
|
MEC17-05182
| Mec-Aging Inspection | 8/8/2018 | 8/8/2018 | 8/8/2018 8:11:30 AM | | FAIL |
|
|
needs called in for inspection by homeowner
|