MEC19-04070
| Rough-in | 9/26/2019 | 9/26/2019 | 9/26/2019 2:31:06 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Konrad Swartz- R/I ok
|
MEC19-04069
| Rough-in | 9/26/2019 | 9/26/2019 | 9/26/2019 2:30:09 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Konrad Swartz- R/I ok
|
MEC19-04068
| Rough-in | 9/26/2019 | 9/26/2019 | 9/26/2019 2:29:04 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Konrad Swartz- R/I ok
|
MEC19-04067
| Rough-in | 9/26/2019 | 9/26/2019 | 9/26/2019 2:28:03 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Konrad Swartz- R/I ok
|
MEC19-04091
| Rough-in | 9/26/2019 | 9/26/2019 | 9/26/2019 1:52:17 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Terek Worley 1- missing transfer register in bedroom 2 and 4 2- 2nd drain needs ran 3- need range ducting installed ?? 4- need nail plate bedroom 3 at ceiling on 3/4" pvc drain 5- b vent for water heater at roof needs 1" clearance to combustibles 6- need to insulate register can R/A where 6" outside air duct was removed 7- need to insulate outside air filter box in attic
left correction n otice front window
|
MEC19-04091
| Pressure Test | 9/26/2019 | 9/26/2019 | 9/26/2019 1:48:49 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Terek Worley- 20lb gas pass- tagged meter location
|
MEC19-04115
| Rough-in | 9/26/2019 | 9/26/2019 | 9/26/2019 1:48:25 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Terek Worley- 1- need to insulate outside air filter box in attic 2- supply register in master bedroom just hanging in ceiling 3- 6" fresh/outside air can not come from register can needs tied into R/A plenum at furnace 4- need 4" b vent 90 at furnace location in attic
left notice front entry window
|
MEC19-04115
| Pressure Test | 9/26/2019 | 9/26/2019 | 9/26/2019 1:45:57 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Terek Worley- 20lb gas pass
|
MEC19-04245
| Final | 9/26/2019 | 9/26/2019 | 9/26/2019 1:36:46 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette- furnace a/c coil co ok
|
MEC19-03277
| Final | 9/25/2019 | 9/26/2019 | 9/26/2019 11:35:05 AM | A | PASS |
|
|
This is a Flue Pressure and Final Inspect. Please meet our installer at home at 11:30 . Contact for Right Now is Mary ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette- furnace a/c coil co ok- 5lb flue test pass
|
MEC19-04134
| Pressure Test | 9/26/2019 | 9/26/2019 | 9/26/2019 11:23:46 AM | P | CANC |
|
|
Please call Dave when on the way! ###-#### Thank you! Phone #: ###-#### >> Inspection requested via web by Rick Borg Inspection cancelled from web by: Rick Borg
|
MEC19-04134
| Final | 9/26/2019 | 9/26/2019 | 9/26/2019 11:23:44 AM | P | CANC |
|
|
Please call Dave to ensure install is complete. Thank you! ###-#### Phone #: ###-#### >> Inspection requested via web by Rick Borg Inspection cancelled from web by: Rick Borg
|
MEC19-04246
| Conference | 9/26/2019 | 9/26/2019 | 9/26/2019 11:14:18 AM | P | DONE |
|
|
Phone #: 2088718789 >> Inspection requested via mobile web by Albert- exterior wall framing ok- discussed height of hood and stainless steel panels on wall
|
MEC19-03839
| Final | 9/19/2019 | 9/26/2019 | 9/26/2019 10:42:42 AM | A | PASS |
|
|
Call Lindsey in route to inspection ###-####-- she is available after 9-930 Phone #: ###-#### Inspection requested via web by Justin Osterhout- furnace a/c coil co ok
|
MEC19-03775
| Final | 9/25/2019 | 9/26/2019 | 9/26/2019 10:13:40 AM | A | PASS |
|
|
Final Inspection - Contact Buck ###-#### Phone #: ###-#### Inspection requested via web by jamie berg- final ok
|
MEC19-01412
| Final | 9/25/2019 | 9/26/2019 | 9/26/2019 9:52:09 AM | A | PASS |
|
|
please call prior to arriving for access Phone #: ###-#### Inspection requested via web by Nicholas Paige- final ok
|
MEC19-03121
| Final | 9/25/2019 | 9/26/2019 | 9/26/2019 9:39:41 AM | A | PASS |
|
|
Please contact the Office or Shivani Sami directly at ###-#### for access to apt # 3001-201. Thank you! Phone #: ###-#### Inspection requested via web by David or K Cole- furnace coil co ok
|
MEC18-05886
| Pressure Test | 9/25/2019 | 9/26/2019 | 9/26/2019 9:21:51 AM | A | PASS |
|
|
Brad Phone #: ###-####- 20lb gas pass- need 3/4" pvc drain ran to washer location from furnace with condensate pump by final- air balance to- R/I ok
|
MEC19-04254
| Pressure Test | 9/24/2019 | 9/26/2019 | 9/26/2019 9:04:31 AM | A | PASS |
|
|
PLEASE CONTACT OWNER PAUL PRIOR TO ARRIVAL Phone #: ###-#### Inspection requested via web by Jamee Shoecraft- 20lb gas pass
|
MEC19-04254
| Final | 9/26/2019 | 9/26/2019 | 9/26/2019 9:04:04 AM | A | PASS |
|
|
PLEASE CONTACT OWNER PAUL PRIOR TO ARRIVAL Phone #: ###-#### Inspection requested via web by Jamee Shoecraft
|
MEC19-04233
| Final | 9/24/2019 | 9/26/2019 | 9/26/2019 8:40:14 AM | A | FAIL |
|
|
Please call Steve prior to arrival. ###-#### Phone #: ###-#### Inspection requested via web by Andrea Grigsby- condensate needs routed to approved location- talked with Josh about this
|
MEC19-03450
| Final | 9/24/2019 | 9/26/2019 | 9/24/2019 3:39:31 PM | P | CANC |
|
|
Please contact homeowner, David, at number provided with ETA when you are on your way, just to ensure he is home. Thanks! If you have any trouble, call Alyssa at ###-####. Phone #: ###-#### >> Inspection requested via web by Alyssa Cromwell Inspection cancelled from web by: Alyssa Cromwell
|
MEC19-03277
| Final | 9/24/2019 | 9/26/2019 | 9/24/2019 3:30:31 PM | A | CANC |
|
|
This is a Flue Pressure and Final Inspect. Please meet our installer at home at 11:30. Contact for Right Now is Mary ###-#### Phone #: ###-#### >> Inspection requested via web by Mary LaFayette Inspection cancelled from web by: Mary LaFayette
|