MEC18-03566
| Final | 9/24/2018 | 9/28/2018 | 9/28/2018 3:57:05 PM | P | PASS |
|
|
I am sending you pictures of flue test this AM. Please do rest of inspection after 2 PM and call at least 30 minutes prior to inspection. Gwen Kelley ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette- 5lb flue pass- correction made- final ok
|
MEC18-04620
| Final | 9/24/2018 | 9/28/2018 | 9/28/2018 3:40:26 PM | P | PASS |
|
|
Field super Chad Robertson Phone #: ###-#### Inspection requested via web by Lisa Whitney- furnace a/c coil co ok
|
MEC18-04533
| Final | 9/25/2018 | 9/28/2018 | 9/28/2018 3:21:38 PM | P | PASS |
|
|
Field supervisor, Don Rapp, to meet you about 3:30. His number is ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette- mini split final ok
|
MEC18-04658
| Rough-in | 9/27/2018 | 9/28/2018 | 9/28/2018 3:11:08 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Angie Pereira
|
MEC18-04658
| Final | 9/28/2018 | 9/28/2018 | 9/28/2018 3:10:59 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Angie Pereira- R/I ok- final ok
|
MEC18-04696
| Final | 9/28/2018 | 9/28/2018 | 9/28/2018 2:48:16 PM | P | PASS |
|
|
Would like PM and call on way at ###-#### Phone #: ###-#### Inspection requested via web by Xanti Berria- furnace a/c coil co ok- 20lb gas pass- 5lb flue pass
|
MEC18-04696
| Pressure Test | 9/28/2018 | 9/28/2018 | 9/28/2018 2:47:46 PM | P | PASS |
|
|
Would like PM and call on way at ###-#### Phone #: ###-#### Inspection requested via web by Xanti Berria- 5lb flue test pass- 20lb gas test pass whole system
|
MEC18-02537
| Final | 9/28/2018 | 9/28/2018 | 9/28/2018 2:18:04 PM | P | PASS |
|
|
All Repairs have been made Phone #: ###-#### Inspection requested via web by Benny Arreola- final ok
|
MEC18-02438
| Final | 9/28/2018 | 9/28/2018 | 9/28/2018 2:17:47 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kim Evans- final ok
|
MEC18-02524
| Final | 9/28/2018 | 9/28/2018 | 9/28/2018 2:17:32 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kim Evans- final ok
|
MEC18-02260
| Final | 9/28/2018 | 9/28/2018 | 9/28/2018 2:17:16 PM | P | NR |
|
|
Requested by Sam, site manager. Phone #: ###-#### Inspection requested via web by Sam Brown
|
MEC18-04701
| Rough-in | 9/28/2018 | 9/28/2018 | 9/28/2018 1:38:51 PM | P | FAIL |
|
|
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak- fireplace thimble is installed upside down doesnt meet clearance- crawl not complete- need to fix all rips and tears in arma flex- b vent doesnt have 1" clearance to sheetrock and insulation shield needs to go all the way to roof pitch- dryer vent duct needs seal to termination box- exhaust fan flex in master toilet needs to be ran above gas line- fresh air damper needs sealed- reinspection fee issued for ongoing issues on R/I of new construction- left correction notice front window
|
MEC18-04701
| Pressure Test | 9/28/2018 | 9/28/2018 | 9/28/2018 1:24:50 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- gauge wont zero out
|
MEC18-02739
| Final | 9/28/2018 | 9/28/2018 | 9/28/2018 12:56:47 PM | P | PASS |
|
|
final ok
|
MEC18-04006
| Rough-in | 9/27/2018 | 9/28/2018 | 9/28/2018 11:29:50 AM | A | NR |
|
|
Partial inspection. Make sure to call Aleks on way at ###-#### Phone #: ###-#### Inspection requested via web by Xanti Berria- will reschedule- still installing
|
MEC18-03610
| Final | 9/28/2018 | 9/28/2018 | 9/28/2018 11:09:06 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- final ok- resubmitted manual J approved with right equipment
|
MEC18-01171
| Final | 9/27/2018 | 9/28/2018 | 9/28/2018 10:49:48 AM | A | PASS |
|
|
Customer should be home to let you in. Inspection requested via web by jeff jedlick- final ok
|
MEC18-03133
| Final | 9/27/2018 | 9/28/2018 | 9/28/2018 10:34:52 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dan Otero- fireplace final ok
|
MEC18-03378
| Final | 9/27/2018 | 9/28/2018 | 9/28/2018 9:54:27 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Aaron Alandt- need to seal dryer vent duct to termination box in laundry room- need to seal outside air duct at furnace- door to furnace closet needs self closing hinges
|
MEC18-04615
| Final | 9/27/2018 | 9/28/2018 | 9/28/2018 9:36:45 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Aaron Alandt- furnace a/c coil co ok
|
MEC18-02739
| Final | 9/26/2018 | 9/28/2018 | 9/28/2018 9:22:32 AM | A | FAIL |
|
|
If the arrival time needs adjusted/changed, please call Mark Adams ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Carlene Dickens- need uv protection on arma flex outside mini split a/c- need to seal linset and condensate pentrations outside- rest is good
|
MEC18-00852
| Final | 9/27/2018 | 9/28/2018 | 9/28/2018 9:04:43 AM | A | PART |
|
|
HENRY IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- copper condensate piping ok- missing flex connection wrong size ordered- need unions on gas line on roof couple locations- need to hook up piping to unit heater- needs to add drains for mini split in storage area- need condensate drains put on all RTUs
|
MEC18-02311
| Final | 9/28/2018 | 9/28/2018 | 9/28/2018 8:12:51 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Marisa Hone- final ok
|
MEC17-03358
| Mec-Aging Inspection | 9/28/2018 | 9/28/2018 | 9/28/2018 8:08:33 AM | | CANC |
|
|
no calls for inspection by contractor
|
MEC16-04040
| Mec-Aging Inspection | 9/28/2018 | 9/28/2018 | 9/28/2018 8:08:06 AM | | CANC |
|
|
|
MEC16-04040
| DOC - Permit Expired | 9/28/2018 | 9/28/2018 | 9/28/2018 8:08:00 AM | A | PASS |
|
|
|
MEC18-03629
| Conference | 9/27/2018 | 9/28/2018 | 9/27/2018 12:45:54 PM | A | CANC |
|
|
Please place pressure pass sticker on gas pipe. cannot get meter set Phone #: ###-#### >> Inspection requested via web by Randy Hart Inspection cancelled from web by: Randy Hart
|