ELE17-02494
| ELE-Aging Inspection | 10/10/2019 | 10/10/2019 | 10/14/2019 5:52:28 AM | | DONE |
|
|
Please coordinate and schedule a final inspection.
|
ELE19-03888
| Rough-In Permanent Service | 10/9/2019 | 10/10/2019 | 10/10/2019 2:04:03 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall Ok cover. p/s u/g n ok
|
ELE19-03889
| Rough-In Permanent Service | 10/9/2019 | 10/10/2019 | 10/10/2019 2:03:39 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall Ok cover. p/s u/g n ok
|
ELE19-03891
| Rough-In Permanent Service | 10/9/2019 | 10/10/2019 | 10/10/2019 2:02:39 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall Ok cover. p/s u/g n ok
|
ELE19-03890
| Rough-In Permanent Service | 10/9/2019 | 10/10/2019 | 10/10/2019 2:02:13 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall Ok cover. p/s u/g n ok
|
ELE19-03878
| Final | 10/10/2019 | 10/10/2019 | 10/10/2019 12:31:53 PM | P | PASS |
|
|
Alt Energy Jessie ###-#### Ok final. 6 panels added. No equiptment changed out, brkr size stayed the same.
|
ELE19-03878
| Electrical Rough-In | 10/10/2019 | 10/10/2019 | 10/10/2019 12:31:05 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jesse Simpson Ok cover. Items UL listed. Added 6 panels to existing installation.
|
ELE19-03882
| Electrical Rough-In | 10/9/2019 | 10/10/2019 | 10/10/2019 11:30:52 AM | A | PASS |
|
|
Someone will be there. Call Chaz with any questions ###-#### Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok cover 2 cans, fan back porch.
|
ELE19-03362
| Final | 10/9/2019 | 10/10/2019 | 10/10/2019 9:58:51 AM | A | PASS |
|
|
The homeowner has the permit paperwork. If they aren''t home they will leave it outside by the disconnect. Phone #: ###-#### Inspection requested via web by Amy Simms Ok final. Labels, 30a brkr w/30a fuses.
|
ELE19-03831
| Final | 10/9/2019 | 10/10/2019 | 10/10/2019 9:10:35 AM | A | PASS |
|
|
We actually didn''t need to install any new wiring, just had to remove unused Knob and tube. Someone else had installed romex in the past, and left all of the Knob and tube in place. We did the removal, and added a few staples to the romex that was there. Phone #: ###-#### Inspection requested via web by Troy Cobb Ok final. Talked to Troy, there was nothing added or moved. This was just removing old knob and tube that was not removed by previous electrician. Wire was already disconnected.
|