ELE19-03619
| Conference | 10/16/2019 | 10/16/2019 | 10/16/2019 3:05:49 PM | P | DONE |
|
|
Mark Phone #: ###-#### Discussed circuits needed for kitchen, and outlet layout for other rooms.
|
ELE19-03986
| Final | 10/15/2019 | 10/16/2019 | 10/16/2019 2:08:08 PM | P | PASS |
|
|
Will the customer was hoping you could make it after 12pm and possibly call him before if you get a chance? ###-#### Thank you! Phone #: ###-#### Inspection requested via web by Tricia Henderson Ok final. Max fuse 30, 30a brkr installed.
|
ELE18-04477
| Electrical Rough-In | 10/16/2019 | 10/16/2019 | 10/16/2019 1:42:44 PM | P | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Seperate building permit needs pulled, and solar permit. Original bld permit does not have any documentation for a solar installation.
|
ELE19-03969
| Electrical Rough-In | 10/16/2019 | 10/16/2019 | 10/16/2019 12:57:29 PM | P | PASS |
|
|
Call Jim @ ###-#### to get in Phone #: ###-#### Inspection requested via web by Jim Williams Ok cover unit on N side, up and down stairs. Back unit cover utility room, and unit on S side cover 1 small wall with 1 outlet.
|
ELE19-03414
| Final | 10/16/2019 | 10/16/2019 | 10/16/2019 12:36:17 PM | P | PASS |
|
|
Inspection requested via web by Brad Girard Ok final
|
ELE19-02433
| Final | 10/16/2019 | 10/16/2019 | 10/16/2019 12:35:54 PM | P | PASS |
|
|
2470 is the garage code Phone #: ###-#### Inspection requested via web by Kevin Heideman Ok final.
|
ELE18-01605
| Final | 10/16/2019 | 10/16/2019 | 10/16/2019 11:41:57 AM | P | PASS |
|
|
C of O a.m. inspection would be best Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok final. All panels labeled, range hood covers are all on.
|
ELE19-02682
| Final | 10/16/2019 | 10/16/2019 | 10/16/2019 11:40:29 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by kevin blackmon Ok final.
|
ELE19-00784
| Final | 10/16/2019 | 10/16/2019 | 10/16/2019 11:40:12 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by kevin blackmon Ok final.
|
ELE19-03478
| Final | 10/15/2019 | 10/16/2019 | 10/16/2019 11:15:06 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Noah Giver Ok final.
|
ELE19-03974
| Electrical Rough-In | 10/15/2019 | 10/16/2019 | 10/16/2019 11:14:49 AM | A | PASS |
|
|
Robert Phone #: ###-#### Ok cover. Items UL listed, panels match paperwork
|
ELE19-03443
| Electrical Rough-In | 10/15/2019 | 10/16/2019 | 10/16/2019 10:23:23 AM | A | PASS |
|
|
underground inspection Phone #: ###-#### Inspection requested via web by Christy Cheney Ok cover 4-2" conduits on E side of old bank location.
|
ELE19-03880
| Conference | 10/15/2019 | 10/16/2019 | 10/16/2019 9:47:32 AM | A | DONE |
|
|
call for access- Robert Phone #: ###-#### Discussed power for shed. Also the need for tamper recepts, and weather rated if installed outside.
|
ELE19-03952
| Electrical Rough-In | 10/16/2019 | 10/16/2019 | 10/16/2019 9:24:36 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Eric Brown Ok cover kitchen. Oven box was changed out to a 4 square.
|
ELE19-02947
| Electrical Rough-In | 10/15/2019 | 10/16/2019 | 10/16/2019 8:57:40 AM | A | PASS |
|
|
UNDERGROUND INSPECTION AT VETERANS MEMORIAL PARKWAY ENTRANCE. ENTER AT LANDER STREET AND DRIVE PAST BATHROOM ON CONSTRUCTION ENTRANCE. Phone #: ###-#### Inspection requested via web by Mark Gibson Ok cover conduits to front entrance off Veterans Pkway for gate and comm.
|
ELE19-03539
| Electrical Rough-In | 10/15/2019 | 10/16/2019 | 10/16/2019 8:22:40 AM | A | PASS |
|
|
Hello, I will be there (8:15). Thank you, Lonnie Phone #: ###-#### Inspection requested via web by Lonnie Sorichta Ok cover mstr bed/bath and closet
|
ELE17-01409
| ELE-Aging Inspection | 10/16/2019 | 10/16/2019 | 10/16/2019 5:23:18 AM | | DONE |
|
|
A final inspection is needed. Please coordinate.
|