Inspections for the day of: Friday, October 5, 2018.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-03769 Rough-In Permanent Service10/5/201810/5/201810/5/2018 2:03:02 PMPPASS
Thank you and have a great day. Phone #: ###-#### Inspection requested via web by Eric Brown p/s u/g n ok
ELE18-03715 Electrical Rough-In10/4/201810/5/201810/5/2018 1:55:27 PMPPASS
Phone #: ###-#### Inspection requested via web by Justin Yount ok cover.
ELE18-02034 Final10/4/201810/5/201810/5/2018 1:29:58 PMPPASS
Phone #: ###-#### Inspection requested via web by michael hunt Ok final mstr.
ELE18-03715 Permanent Service10/5/201810/5/201810/5/2018 1:28:10 PMPPASS
Existing 100a service moved to N side of garage to avoid clearance issues. Same overhead conduit used. p/s o/h n ok
ELE18-02122 Final10/5/201810/5/201810/5/2018 1:08:33 PMPPASS
Phone #: ###-#### Inspection requested via web by Jerry Moore Talked to contrator by phone. I did a scheduled final inspection for the pool house on 9/11/18. There were 2 permits on job. Ok final.
ELE18-01558 Final10/5/201810/5/201810/5/2018 12:39:41 PMPNR
3rd floor final Phone #: ###-#### Inspection requested via web by steve cooper Will do partial final on floors 3-4 monday the 8th.
ELE18-03688 Electrical Rough-In10/5/201810/5/201810/5/2018 12:16:11 PMPPASS
underground // mucho Phone #: ###-#### Ok cover 3in pvc from front of property to back for well.
ELE18-03829 Temporary Service10/5/201810/5/201810/5/2018 12:15:30 PMPPASS
Back corner of lot. Phone #: ###-#### Inspection requested via web by Cevyn Recla t/s o/h n ok
ELE18-02544 Final10/2/201810/5/201810/5/2018 10:45:02 AMAPASS
call 15 mins ahead-Charles Phone #: ###-#### Ok final.
ELE18-03817 Electrical Rough-In10/4/201810/5/201810/5/2018 10:11:02 AMAPASS
Phone #: ###-#### Inspection requested via web by michael hunt Ok cover bath off kitchen
ELE18-02789 Electrical Rough-In10/4/201810/5/201810/5/2018 9:04:36 AMAPASS
Bathroom floor heat Phone #: ###-#### Inspection requested via web by steve sellers Ok cover floor heat main level.
ELE18-03800 Final10/4/201810/5/201810/5/2018 8:41:08 AMAPASS
Re-scheduled from 10/4/18. Had trouble finding location. Talked to electrician, will inspect tomorrow AM. Ok final. Location is on the corner of 10th and Washington at construction entrance.
ELE18-03813 Electrical Rough-In10/4/201810/5/201810/5/2018 8:32:34 AMAPASS
Rough-in inspection 2 new walls
Contact Lance if space is not unlocked
208 703 2035 Phone #: ###-#### Inspection requested via web by David Feller Ok cover 2 walls, 1 N side, 1 W side.
ELE14-00564 ELE-Aging Inspection10/5/201810/5/201810/5/2018 7:48:48 AM DONE
Schedule a final inspection.
ELE18-01939 Final10/4/201810/5/201810/4/2018 1:00:33 PMAPASS
Phone #: ###-#### Inspection requested via web by Steve VanWinkle Ok final. Looked at signs during electrical final. UL listings visible and disc. Signs on all 4 sides of building.