ELE18-03769
| Rough-In Permanent Service | 10/5/2018 | 10/5/2018 | 10/5/2018 2:03:02 PM | P | PASS |
|
|
Thank you and have a great day. Phone #: ###-#### Inspection requested via web by Eric Brown p/s u/g n ok
|
ELE18-03715
| Electrical Rough-In | 10/4/2018 | 10/5/2018 | 10/5/2018 1:55:27 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Justin Yount ok cover.
|
ELE18-02034
| Final | 10/4/2018 | 10/5/2018 | 10/5/2018 1:29:58 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by michael hunt Ok final mstr.
|
ELE18-03715
| Permanent Service | 10/5/2018 | 10/5/2018 | 10/5/2018 1:28:10 PM | P | PASS |
|
|
Existing 100a service moved to N side of garage to avoid clearance issues. Same overhead conduit used. p/s o/h n ok
|
ELE18-02122
| Final | 10/5/2018 | 10/5/2018 | 10/5/2018 1:08:33 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jerry Moore Talked to contrator by phone. I did a scheduled final inspection for the pool house on 9/11/18. There were 2 permits on job. Ok final.
|
ELE18-01558
| Final | 10/5/2018 | 10/5/2018 | 10/5/2018 12:39:41 PM | P | NR |
|
|
3rd floor final Phone #: ###-#### Inspection requested via web by steve cooper Will do partial final on floors 3-4 monday the 8th.
|
ELE18-03688
| Electrical Rough-In | 10/5/2018 | 10/5/2018 | 10/5/2018 12:16:11 PM | P | PASS |
|
|
underground // mucho Phone #: ###-#### Ok cover 3in pvc from front of property to back for well.
|
ELE18-03829
| Temporary Service | 10/5/2018 | 10/5/2018 | 10/5/2018 12:15:30 PM | P | PASS |
|
|
Back corner of lot. Phone #: ###-#### Inspection requested via web by Cevyn Recla t/s o/h n ok
|
ELE18-02544
| Final | 10/2/2018 | 10/5/2018 | 10/5/2018 10:45:02 AM | A | PASS |
|
|
call 15 mins ahead-Charles Phone #: ###-#### Ok final.
|
ELE18-03817
| Electrical Rough-In | 10/4/2018 | 10/5/2018 | 10/5/2018 10:11:02 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by michael hunt Ok cover bath off kitchen
|
ELE18-02789
| Electrical Rough-In | 10/4/2018 | 10/5/2018 | 10/5/2018 9:04:36 AM | A | PASS |
|
|
Bathroom floor heat Phone #: ###-#### Inspection requested via web by steve sellers Ok cover floor heat main level.
|
ELE18-03800
| Final | 10/4/2018 | 10/5/2018 | 10/5/2018 8:41:08 AM | A | PASS |
|
|
Re-scheduled from 10/4/18. Had trouble finding location. Talked to electrician, will inspect tomorrow AM. Ok final. Location is on the corner of 10th and Washington at construction entrance.
|
ELE18-03813
| Electrical Rough-In | 10/4/2018 | 10/5/2018 | 10/5/2018 8:32:34 AM | A | PASS |
|
|
Rough-in inspection 2 new walls Contact Lance if space is not unlocked 208 703 2035 Phone #: ###-#### Inspection requested via web by David Feller Ok cover 2 walls, 1 N side, 1 W side.
|
ELE14-00564
| ELE-Aging Inspection | 10/5/2018 | 10/5/2018 | 10/5/2018 7:48:48 AM | | DONE |
|
|
Schedule a final inspection.
|
ELE18-01939
| Final | 10/4/2018 | 10/5/2018 | 10/4/2018 1:00:33 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Steve VanWinkle Ok final. Looked at signs during electrical final. UL listings visible and disc. Signs on all 4 sides of building.
|