ELE17-03792
| ELE-Aging Inspection | 11/12/2019 | 11/12/2019 | 11/20/2019 5:25:14 AM | | PASS |
|
|
Talked to contractor, this was install of conduit and disc only. No wiring involved. I drove to address on 11/19/19, there was no solar equiptment installed. It was for possibe solar in the future.
|
ELE17-02846
| ELE-Aging Inspection | 11/12/2019 | 11/12/2019 | 11/13/2019 2:08:09 PM | | DONE |
|
|
Notified contractor. He is looking into it.
|
ELE19-03693
| Electrical Rough-In | 11/12/2019 | 11/12/2019 | 11/12/2019 2:58:15 PM | P | PASS |
|
|
Above Ceiling. Phone #: ###-#### Inspection requested via web by Brad Hoots Ok cover E side ceilings.
|
ELE19-02224
| Electrical Rough-In | 11/8/2019 | 11/12/2019 | 11/12/2019 2:05:40 PM | P | PASS |
|
|
Wall inspection 2nd floor area ''D'' PACU rooms 2E151, 2E157-2E161, 2E164-2E169, ; 2E172. Call Lonny when on site ###-####, thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum Ok cover areas listed except bathroom at top of stairs.
|
ELE19-04345
| Rough-In Permanent Service | 11/12/2019 | 11/12/2019 | 11/12/2019 1:37:04 PM | P | PASS |
|
|
lock box code 5090 Phone #: ###-#### Inspection requested via web by Ryan Wake Ok cover. p/s o/h rec ok
|
ELE19-04346
| Temporary Service | 11/11/2019 | 11/12/2019 | 11/12/2019 1:10:39 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Heath Thomas t/s u/g n ok
|
ELE19-04370
| Electrical Rough-In | 11/12/2019 | 11/12/2019 | 11/12/2019 12:37:19 PM | P | PASS |
|
|
Soffits does cover. Thank you Phone #: ###-#### Inspection requested via web by Eric Brown Ok cover soffits.
|
ELE19-04251
| Electrical Rough-In | 11/12/2019 | 11/12/2019 | 11/12/2019 12:34:09 PM | P | PASS |
|
|
Call Preston with questions Phone #: ###-#### Inspection requested via web by Rob Maes Ok cover. All items UL listed.
|
ELE19-04373
| Final | 11/12/2019 | 11/12/2019 | 11/12/2019 12:04:58 PM | P | PASS |
|
|
Ok final. 2 pole 20 for pump under house. GFI and light were installed for servicing.
|
ELE19-04373
| Electrical Rough-In | 11/12/2019 | 11/12/2019 | 11/12/2019 12:04:12 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Gene Wright Ok cover trench for well pump.
|
ELE19-03673
| Electrical Rough-In | 11/11/2019 | 11/12/2019 | 11/12/2019 12:03:05 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Sarah Schuller Ok cover. All items UL listed.
|
ELE19-03879
| Electrical Rough-In | 11/11/2019 | 11/12/2019 | 11/12/2019 11:17:15 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Sarah Schuller Ok cover. Items UL listed.
|
ELE19-03143
| Final | 11/11/2019 | 11/12/2019 | 11/12/2019 11:01:59 AM | P | PASS |
|
|
If locked garage code is 2012 Inspection requested via web by ERIC CENTERS Ok final
|
ELE19-04349
| Rough-In Permanent Service | 11/11/2019 | 11/12/2019 | 11/12/2019 11:00:40 AM | A | PASS |
|
|
Inspection requested via web by ERIC CENTERS Ok cover. p/s u/g n ok
|
ELE19-03675
| Final | 11/8/2019 | 11/12/2019 | 11/12/2019 10:30:07 AM | A | PASS |
|
|
Please call Gabe @ ###-#### to ensure access. Call Brodie @ ###-#### with any questions. Phone #: ###-#### Inspection requested via web by William Salts Ok final. Recepts were moved.
|
ELE19-03200
| Final | 11/11/2019 | 11/12/2019 | 11/12/2019 10:29:30 AM | A | PASS |
|
|
Job Permit Pack will be left onsite taped to inverter. Phone #: ###-#### Inspection requested via web by Jesse Simpson Ok final. Labels present.
|
ELE19-04366
| Rough-In Permanent Service | 11/12/2019 | 11/12/2019 | 11/12/2019 9:49:11 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson Ok cover. p/s u/g n ok
|
ELE19-04362
| Electrical Rough-In | 11/11/2019 | 11/12/2019 | 11/12/2019 9:48:51 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by John VanZandt Ok cover kitchen and up bath.
|
ELE19-04330
| Final | 11/8/2019 | 11/12/2019 | 11/12/2019 9:33:37 AM | A | CANC |
|
|
Please call Dave the owner for access ###-#### Phone #: ###-#### Inspection requested via web by BRAD BAKER Talked to homeowner. He needed to re-shedule for 11/13 PM.
|
ELE19-04314
| Electrical Rough-In | 11/11/2019 | 11/12/2019 | 11/12/2019 9:15:01 AM | A | PASS |
|
|
Roughed in Conduit for solar. Located in garage and goes to roof. Phone #: ###-#### Inspection requested via web by Jesse Simpson Ok cover conduit to right of panel in garage to rooftop on E side of house.
|
ELE19-03518
| Final | 11/11/2019 | 11/12/2019 | 11/12/2019 9:01:59 AM | A | PASS |
|
|
Homeowners will be home. If you have any questions please feel free to contact Luke ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok final.
|
ELE19-04247
| Final | 11/8/2019 | 11/12/2019 | 11/12/2019 7:59:26 AM | A | PASS |
|
|
Ok final. Panels labeled.
|
ELE19-04093
| Final | 11/11/2019 | 11/12/2019 | 11/12/2019 5:15:35 AM | A | PASS |
|
|
I need to request inspector Mark Moncarr Inspection requested via web by BRS Permitting Ok final. This is a supply side connection. It falls under the 6 disconnect rule as there is no main breaker. All labeling present.
|