ELE19-04403
| Conference | 11/13/2019 | 11/13/2019 | 11/13/2019 2:56:05 PM | P | DONE |
|
|
Requesting conference to discuss panel upgrade, sub-panel installation and plans for wiring and circuits in garage addition. Phone #: ###-#### Inspection requested via web by Greg Stahl Discussed new service requirements, bonding/electrode sys. Discussed required circuits for kitchenette above garrage and bath.
|
ELE18-03143
| Final | 11/8/2019 | 11/13/2019 | 11/13/2019 2:10:40 PM | P | PASS |
|
|
Corbin ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg Ok final.
|
ELE19-04251
| Final | 11/12/2019 | 11/13/2019 | 11/13/2019 2:09:15 PM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Rob Maes Resceduled for 11/14, Waiting for pictures.
|
ELE19-03246
| Final | 11/13/2019 | 11/13/2019 | 11/13/2019 1:36:02 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins
|
ELE19-04330
| Final | 11/12/2019 | 11/13/2019 | 11/13/2019 1:28:43 PM | P | FAIL |
|
|
Talked to homeowner, he needs re-schedule for 11/13 PM. Dave ###-#### Tub does not have the required 22.5 ft vertical clearence above tub. Nor does it have the 10ft horizontal distance from the waters edge.
|
ELE19-04083
| Final | 11/12/2019 | 11/13/2019 | 11/13/2019 12:17:08 PM | P | PASS |
|
|
I will be there.
Thank you, Lonnie Phone #: ###-#### Inspection requested via web by Lonnie Sorichta Ok final.
|
ELE18-03765
| Final | 11/13/2019 | 11/13/2019 | 11/13/2019 12:01:10 PM | P | PASS |
|
|
lock box on side door 1987 Phone #: ###-#### Inspection requested via web by Dan Rohl Ok final.
|
ELE19-04389
| Electrical Rough-In | 11/12/2019 | 11/13/2019 | 11/13/2019 11:53:32 AM | P | PASS |
|
|
underground inspection contact is Justin Phone #: ###-#### Inspection requested via web by Lori Stout Ok cover conduit. After ground cover is in place, conduit will be at code depth.
|
ELE19-03963
| Electrical Rough-In | 11/13/2019 | 11/13/2019 | 11/13/2019 11:17:32 AM | P | PASS |
|
|
Contact: Derrick Kamper Phone #: ###-#### Inspection requested via web by Deb Gooden Ok cover conference and office 3rd floor S side.
|
ELE19-03602
| Electrical Rough-In | 11/6/2019 | 11/13/2019 | 11/13/2019 11:16:59 AM | A | PASS |
|
|
Shane Phone #: ###-#### Ok cover ceiling.
|
ELE19-00108
| Electrical Rough-In | 11/13/2019 | 11/13/2019 | 11/13/2019 9:43:51 AM | A | PASS |
|
|
Second floor hall drop ceiling Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Ok cover soffits 2nd floor. Get your tools on Betty!
|
ELE19-03471
| Electrical Rough-In | 11/12/2019 | 11/13/2019 | 11/13/2019 8:29:17 AM | A | PASS |
|
|
Underground for Idaho power overhead relocation Phone #: ###-#### Inspection requested via web by Lars Johnson Ok cover trench from back corner of property to house.
|
ELE17-02875
| ELE-Aging Inspection | 11/13/2019 | 11/13/2019 | 11/13/2019 6:07:45 AM | | DONE |
|
|
A final inspection is needed. Please coordinate with homeowner.
|