ELE19-04191
| Electrical Rough-In | 11/4/2019 | 11/5/2019 | 11/5/2019 3:07:28 PM | P | PASS |
|
|
Please call before inspection. Thank You Phone #: ###-#### Inspection requested via web by Matt Oranday Ok cover. Verified UL listing.
|
ELE19-04245
| Electrical Rough-In | 11/4/2019 | 11/5/2019 | 11/5/2019 2:19:11 PM | P | PASS |
|
|
Requesting a electrical rough in. Added (2) Electrical boxes/wiring for exit signage and egress. Switch for interior lighting Phone #: ###-#### Inspection requested via web by Tim Lawrence Ok cover light boxes above 2 newly installed back doors.
|
ELE19-04259
| Electrical Rough-In | 11/5/2019 | 11/5/2019 | 11/5/2019 1:50:05 PM | P | PASS |
|
|
Please call 20min prior Phone #: ###-#### Inspection requested via web by Kevin Burke Ok cover mstr and main bath, N wall mstr, cans added in 3 beds.
|
ELE17-02647
| Final | 11/4/2019 | 11/5/2019 | 11/5/2019 1:15:38 PM | A | CANC |
|
|
After talking to contractor, rescheduled for 11/7
|
ELE19-03782
| Conference | 11/5/2019 | 11/5/2019 | 11/5/2019 1:12:30 PM | P | DONE |
|
|
Joe Phone #: ###-#### Discussed requirements for wiring group home for women.
|
ELE17-02494
| Final | 11/5/2019 | 11/5/2019 | 11/5/2019 12:13:08 PM | A | NH |
|
|
Phone #: ###-#### Inspection requested via web by Ben Garner
|
ELE19-04253
| Rough-In Permanent Service | 11/5/2019 | 11/5/2019 | 11/5/2019 12:12:07 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Robert Schroder Ok cover. p/s u/g n ok
|
ELE19-04246
| Electrical Rough-In | 11/4/2019 | 11/5/2019 | 11/5/2019 12:11:38 PM | P | PASS |
|
|
moved a circuit in patio area Phone #: ###-#### Inspection requested via web by Matthew White Ok cover reroute of wires inside lower patio.
|
ELE17-03676
| Final | 11/5/2019 | 11/5/2019 | 11/5/2019 11:00:04 AM | P | PASS |
|
|
Jon Phone #: ###-#### Ok final. Panel labeled, intersystem installed.
|
ELE19-04249
| Rough-In Permanent Service | 11/4/2019 | 11/5/2019 | 11/5/2019 9:38:54 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Heath Thomas Ok cover. Mentioned to gentleman on site to check with IDP about his underground depth coming from pole to service. p/s u/g n ok
|
ELE19-04076
| Final | 11/4/2019 | 11/5/2019 | 11/5/2019 9:23:27 AM | A | PASS |
|
|
Mierins Rozentals is the on site contact Phone #: ###-#### Inspection requested via web by BRS Permitting Ok final. Labels present. 2 pole 30 on 200a service
|
ELE19-03625
| Final | 11/4/2019 | 11/5/2019 | 11/5/2019 8:52:24 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Sarah Schuller Ok final.
|
ELE17-02710
| ELE-Aging Inspection | 11/5/2019 | 11/5/2019 | 11/5/2019 6:03:45 AM | | DONE |
|
|
Please schedule a final inspection. Refer to notes on 8/6/19
|
ELE19-04246
| Electrical Rough-In | 11/4/2019 | 11/5/2019 | 11/4/2019 5:33:49 PM | A | CANC |
|
|
electrician Duke Hurst not onsite, ###-####. can call office for more details. Phone #: ###-#### >> Inspection requested via web by Matthew White Inspection cancelled from web by: Matthew White
|