Inspections for the day of: Friday, December 6, 2019.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE17-03287 ELE-Aging Inspection12/6/201912/6/201912/9/2019 12:08:31 PM DONE
2nd meter installed on structure. Fire rating allows 2nd meter on single structure. No final inspection has been done inside unit itself. Please call with progress on work being done.
ELE15-02574 ELE-Aging Inspection12/6/201912/6/201912/9/2019 11:57:40 AM DONE
Turned over to Daryl DeGrange as per his request.
ELE19-03698 Electrical Rough-In12/6/201912/6/201912/6/2019 3:06:25 PMPPASS
Phone #: ###-#### Inspection requested via web by Laurie Hoelscher Ok cover. Items UL listed. Mentioned to installer that a permanenet placard needs installed on exterior to show location of power supply
ELE19-02224 Electrical Rough-In12/4/201912/6/201912/6/2019 2:03:37 PMPPASS
Requesting inspection for 4th floor Penthouse wall rough-in and 5th floor Rooftop wall rough-in. Call Lonny when on site, Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum Ok cover MLB rooftop and Hospital penthouse.
ELE19-04692 Conference12/6/201912/6/201912/6/2019 1:14:44 PMPDONE
Kyle Phone #: ###-#### Discussed wiring in up bath. Homeowner has a grasp on what he's doing,
ELE17-02412 Conference12/5/201912/6/201912/6/2019 12:41:18 PMADONE
I wanted to get the project and permit back on track. The last time it was inspected was at the electrical rough in. The bathroom is finished but the hall way is not and I wanted to discuss the best way to manage the permit and continue the work. Thanks. Phone #: ###-#### Inspection requested via web by David Snyderman Discussed timeline of work being done. Work is still in progress. If needs another extension I said I would allow it.
ELE19-04024 Final12/5/201912/6/201912/6/2019 12:00:05 PMAPASS
The door will be unlocked. It is vacant. If you have any questions please feel free to contact Luke ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok final.
ELE19-03392 Final12/5/201912/6/201912/6/2019 11:18:51 AMAPASS
The access code is 7606, thx Phone #: ###-#### Inspection requested via web by Stephen Kren Ok final.
ELE19-04088 Final12/5/201912/6/201912/6/2019 10:59:55 AMACANC
Reshceduled for 12/6. Need to verify outlet at end of peninsula.
ELE19-04607 Final12/6/201912/6/201912/6/2019 10:32:08 AMPCANC
Please contact Troy with any question or concerns. Thank You! Phone #: ###-#### >> Inspection requested via web by Bob Glenn Inspection cancelled from web by: Bob Glenn
ELE19-04607 Permanent Service12/5/201912/6/201912/6/2019 10:30:13 AMAPASS
Idaho power is disconnecting power @ 9:00 am and we will have everything put back together by 11:00 am. I spoke with Tom Saunders earlier in the week and suggested we take care of the grounding first to show that is taken care of, if at all possible we would like to get you out there to inspect around 10:30 am so we can get Idaho Power back out to swing power before Noon. We will also schedule the final for PM the same day. If you have any questions please contact Troy Ballard @ ###-####. Tom Saunders said you can give him a call if you need any clarifications on our conversation. Thank You! Phone #: ###-#### Inspection requested via web by Bob Glenn p/s u/g rec ok
ELE19-03888 Final12/5/201912/6/201912/6/2019 10:05:09 AMAPASS
Phone #: ###-#### Inspection requested via web by Todd Hall Ok final.
ELE19-03889 Final12/5/201912/6/201912/6/2019 10:04:50 AMAPASS
Phone #: ###-#### Inspection requested via web by Todd Hall Ok final.
ELE19-04607 Final12/3/201912/6/201912/5/2019 10:30:26 AMACANC
Request 11:00 AM inspection. This is a service change. Power disconnecting at 8:00 AM. Will reconnect after inspection. Please call Troy with any questions. ###-#### Phone #: ###-#### >> Inspection requested via web by Bob Glenn Inspection cancelled from web by: Bob Glenn