Inspections for the day of: Tuesday, February 12, 2019.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-04835 Electrical Rough-In2/11/20192/12/20192/12/2019 2:07:56 PMPPASS
We are laying a special floor down on the yoga room and would like to drop ceiling tiles in there before. It will be a partial inspection, if thats ok. I will be there till 4 PM and will try to get you as much area I can so you can look while you are there. Thank you Phone #: ###-#### Inspection requested via web by Shawn Case Ok cover ceiling in yoga studio.
ELE18-03769 Final2/12/20192/12/20192/12/2019 1:20:59 PMPFAIL
Thank you Phone #: ###-#### Inspection requested via web by Eric Brown All electrical work associated with home is good. A/C disconnects for mini split system needs corrections made by heating company. In disc to right, neutral wires need identified as hot conductors. NM cable in left disc cannot be used in outdoor damp or wet locations. Bushing also need for wires exiting wall into disc. Western Heating and Air were the installers.
ELE19-00510 Electrical Rough-In2/12/20192/12/20192/12/2019 12:21:20 PMPPART
Phone #: ###-#### Inspection requested via web by Matthew White Ok cover kitchen. 1 outlet each were added to each side of cooktop. 1 outlet added to backside of peninsular facing into dining.
ELE19-00508 Electrical Rough-In2/12/20192/12/20192/12/2019 11:24:20 AMPPASS
listing inspection for solar panels Phone #: ###-#### Inspection requested via web by Ryan King Ok cover. Verified UL listing of components.
ELE14-02862 Final2/12/20192/12/20192/12/2019 11:11:53 AMPPASS
Talked to Terry with Stephens Electric on 2/12/19. Drove to site and verified that house was demolished and a new home is now on property.
ELE15-00807 ELE-Aging Inspection2/12/20192/12/20192/12/2019 9:54:39 AM DONE
Left card at front door location stating that floor heat in mstr bath needed inspected after contractor install for previous homeowners.
ELE17-03800 Final2/11/20192/12/20192/12/2019 9:39:15 AMAPASS
Phone #: ###-#### Inspection requested via web by Don Conley Ok final. During RI stage the electrical contractor brought it to the attention of the builder and homeowner to trim tree on alley side of house. IDP's service drop was re-run over the top, and laying on, a large tree branch.
ELE15-00884 ELE-Aging Inspection2/12/20192/12/20192/12/2019 9:02:01 AM FAIL
Correction not made. Bond lug inside pole base is not utilized. Needs bonded as per previous inspection by Eric Storey.
ELE15-00849 ELE-Aging Inspection2/12/20192/12/20192/12/2019 8:48:56 AM DONE
Talked to Lewis and Jessica on 2/12/19. Jessica is trying to contact proper personnel to gain access to water feature. Original contact at location no longer works there.
ELE16-00683 Final2/11/20192/12/20192/12/2019 8:25:55 AMACANC
Steve-Eric you may not need to go herebecause you finaled this but it did not close the case can you please doc final. if you need to go out there please call Steve Phone #: ###-#### Talked to homeowner. Re-scheduled for the 14th