ELE19-00567
| Final | 2/14/2019 | 2/14/2019 | 2/14/2019 2:27:27 PM | P | PASS |
|
|
Final for service Phone #: ###-#### Inspection requested via web by Kendra Lanham Ok final. Panel labeled, guy kit installed, jumper for hot/cold verified. 2 grd rods.
|
ELE16-00683
| Final | 2/12/2019 | 2/14/2019 | 2/14/2019 2:09:41 PM | P | PASS |
|
|
###-#### Aaron. Re-scheduled from tue 12th. Ok final. All recepts that I could get too were TR, and spark rings were not needed. ARC fault protection is in place.
|
ELE18-03987
| Electrical Rough-In | 2/13/2019 | 2/14/2019 | 2/14/2019 2:08:14 PM | A | PASS |
|
|
Max Phone #: ###-#### Discussed moving of equipt that supplies air to S side of wall. Equipt was supposed to be beside electrical, but was to big to be installedin original space. It does not interfere with electrical installation.
|
ELE19-00485
| Electrical Rough-In | 2/13/2019 | 2/14/2019 | 2/14/2019 12:24:52 PM | A | PASS |
|
|
need ok to cover pool room Phone #: ###-#### Inspection requested via web by Dan Rohl Some of the needed corrections were completed. Another inspection will be needed to confirm bond to 1 corner of pools metal frame, and a perimeter bond on the floor 18"-24" from inside waters edge. When hardy board is installed call for floor cover.
|
ELE18-03769
| Final | 2/14/2019 | 2/14/2019 | 2/14/2019 11:38:39 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Eric Brown Corrections made. Ok final.
|
ELE19-00567
| Final | 2/13/2019 | 2/14/2019 | 2/14/2019 11:17:59 AM | A | CANC |
|
|
I had scheduled a final inspection for contractor. Contractor didi schedule his own.
|
ELE18-02313
| Electrical Rough-In | 2/14/2019 | 2/14/2019 | 2/14/2019 11:06:50 AM | A | PASS |
|
|
We need a ceiling cover and wall cover inspection please. Thank you. Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover hard lid in bathroom areas NE corner, and short wall on W side to right before hallway entrance.
|
ELE19-00195
| Electrical Rough-In | 2/13/2019 | 2/14/2019 | 2/14/2019 10:18:27 AM | A | PASS |
|
|
Please call/Text Brian Mullally - Homeowner 30 min Prior to Inspection Phone #: ###-#### Inspection requested via web by Brian Mullally Ok cover inlaw quarters.
|
ELE19-00562
| Electrical Rough-In | 2/13/2019 | 2/14/2019 | 2/14/2019 9:56:51 AM | A | PASS |
|
|
small remodel ready for inspection. Someone will be there Thursday morning Phone #: ###-#### Inspection requested via web by Kelly Felin Ok cover basement bedroom and closet. Upon final, light in closet will need to be changed. 410.16(C)(3)
|
MIS19-00036
| Set Bond Amount | 2/11/2019 | 2/14/2019 | 2/14/2019 7:59:20 AM | A | DONE |
|
|
Elec without permit Permit pulled ELE19-00545
|