ELE16-00437
| ELE-Aging Inspection | 2/26/2019 | 2/26/2019 | 3/5/2019 12:46:16 PM | | PASS |
|
|
Corrections were made as Eric Storey stated. This is to close out permit.
|
ELE18-04165
| Final | 2/26/2019 | 2/26/2019 | 2/26/2019 2:22:45 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Shaun Kirkman Ok final.
|
ELE18-04835
| Final | 2/25/2019 | 2/26/2019 | 2/26/2019 1:39:53 PM | P | PASS |
|
|
Painters are finishing today so I will be there in the morning plating the switches and outlets, see you tomorrow! Thanks! Phone #: ###-#### Inspection requested via web by Shawn Case Ok final
|
ELE19-00667
| Electrical Rough-In | 2/25/2019 | 2/26/2019 | 2/26/2019 1:11:53 PM | A | CANC |
|
|
Von. Uffer Ground. Phone #: ###-#### Inspection requested via web by Sean DeLacy Re-scheduled for tommorow 2/27/19.
|
MIS19-00053
| ELE-Conference | 2/26/2019 | 2/26/2019 | 2/26/2019 1:03:42 PM | P | DONE |
|
|
please verify no work is going on Phone #: ###-#### No other work has been done at this time. Job has 2 ele permits pulled. Both have expired.
|
ELE19-00289
| Electrical Rough-In | 2/26/2019 | 2/26/2019 | 2/26/2019 12:49:24 PM | P | PASS |
|
|
Floor rough in Phone #: ###-#### Inspection requested via web by Lee VanSchoiack Ok cover conduit. Will be in 8" of concrete. Conduit for lights in lower level ceiling.
|
ELE19-00453
| Rough-In Permanent Service | 2/26/2019 | 2/26/2019 | 2/26/2019 12:46:57 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by William Andrews Outlet needed to right of bed door inside that is off small garage. p/s u/g n ok
|
ELE19-00690
| Rough-In Permanent Service | 2/25/2019 | 2/26/2019 | 2/26/2019 10:04:03 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bob Glenn p/s u/g n ok
|
ELE19-00342
| Electrical Rough-In | 2/25/2019 | 2/26/2019 | 2/26/2019 8:46:10 AM | A | PASS |
|
|
floor heat. code on door is 4878 Phone #: ###-#### Inspection requested via web by Barbara Szurgot Ok cover flr heat mstr.
|