ELE18-01606
| Electrical Rough-In | 3/18/2019 | 3/19/2019 | 3/19/2019 3:08:23 PM | P | PASS |
|
|
Building B, D units 4th floor rough in inspection Phone #: ###-#### Inspection requested via web by Stephanie Huston Area specified on inspection was not done due to re-framing. Inspection was done on 2nd floor corridor instead. Ok cover walls only.
|
ELE19-00082
| Final | 3/19/2019 | 3/19/2019 | 3/19/2019 1:51:09 PM | P | PASS |
|
|
lock box code 4321 Phone #: ###-#### Inspection requested via web by Richard Gratiot Ok final.
|
ELE19-00765
| Final | 3/18/2019 | 3/19/2019 | 3/19/2019 1:50:08 PM | P | PASS |
|
|
This was a 2.0 project -- a 4 panel add on to a pre-existing system. Apologies, I made a mistake and did not schedule a rough-in. Hopefully we can move forward with a final. Give me a call about an hour before and I am happy to meet you on site if needed. Phone #: ###-#### Inspection requested via web by Rob Maes Ok final 4 panels added to existing system.
|
ELE18-02408
| Electrical Rough-In | 3/19/2019 | 3/19/2019 | 3/19/2019 1:01:19 PM | P | NR |
|
|
Judd Phone #: ###-####
|
ELE19-00745
| Final | 3/19/2019 | 3/19/2019 | 3/19/2019 12:41:05 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Mike Leonard RI inspection for UL listings was never performed. I will need to see equiptment used, to verify UL. Will need to bring 1 ea of components at next inspection request.
|
ELE19-00947
| Electrical Rough-In | 3/19/2019 | 3/19/2019 | 3/19/2019 12:13:31 PM | P | PASS |
|
|
Underground Inspection, Jeff Flechsing is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce Ok cover conduits on N side of school.
|
ELE19-00344
| Electrical Rough-In | 3/18/2019 | 3/19/2019 | 3/19/2019 12:11:49 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brad Christensen RI only ok to cover.
|
ELE19-00715
| Final | 3/18/2019 | 3/19/2019 | 3/19/2019 12:09:58 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Winters LLC Ok final.
|
ELE19-00394
| Final | 3/18/2019 | 3/19/2019 | 3/19/2019 11:49:44 AM | A | PASS |
|
|
Please call Brad with any questions Phone #: ###-#### Inspection requested via web by BRAD BAKER Ok final.
|
ELE19-00937
| Electrical Rough-In | 3/18/2019 | 3/19/2019 | 3/19/2019 9:43:25 AM | A | PASS |
|
|
Inspection requested via web by Dan Hobdey Ok coveer kitch, living area. Built in seating to L and R of fireplace.
|
ELE18-04332
| Final | 3/18/2019 | 3/19/2019 | 3/19/2019 9:22:20 AM | A | PASS |
|
|
garage code 2018 Phone #: ###-#### Inspection requested via web by Darryn Coburn Ok final.
|
ELE16-02940
| ELE-Aging Inspection | 3/19/2019 | 3/19/2019 | 3/19/2019 8:39:45 AM | | DONE |
|
|
Talked to Andy on 3/19 at 8:830am. He is going to try to coordinate and schedule a final.
|