ELE20-00999
| Permanent Service | 3/19/2020 | 3/19/2020 | 3/19/2020 3:00:33 PM | P | PASS |
|
|
###-#### 2 grd rods, intersystem installed. p/s o/h rec ok
|
ELE20-00999
| Final | 3/19/2020 | 3/19/2020 | 3/19/2020 1:57:12 PM | P | CANC |
|
|
Replaced damaged service mast Phone #: ###-#### Inspection requested via web by Matthew White I added a perm service.
|
ELE20-00939
| Conference | 3/19/2020 | 3/19/2020 | 3/19/2020 1:39:54 PM | P | DONE |
|
|
a 30-minute or more call ahead will be appreciated. this will be in conjunction with the final scheduled at the same location. ###-#### Phone #: ###-#### Inspection requested via web by Kerri Hamilton DC system, discussed labeleing
|
ELE20-00942
| Final | 3/19/2020 | 3/19/2020 | 3/19/2020 12:56:24 PM | P | CANC |
|
|
bill Phone #: ###-#### I added a conference.
|
ELE20-00942
| Conference | 3/19/2020 | 3/19/2020 | 3/19/2020 12:56:01 PM | P | DONE |
|
|
Discussed layout in garage and space above. GFI protection, required circuits, TR and WR.
|
ELE18-04477
| Final | 3/19/2020 | 3/19/2020 | 3/19/2020 12:53:54 PM | P | CANC |
|
|
We would like a 30-minute or more call ahead. We have a separate electrical permit for the solar that we will be asking for a consult at the same time. My contact number is ###-#### and my name is Graham Phone #: ###-#### Inspection requested via web by Kerri Hamilton Talked to Graham, he is going to check into the commissioning report. Once report is turned into the city then I will be notified when it is approved for final.
|
ELE19-01262
| Final | 3/18/2020 | 3/19/2020 | 3/19/2020 11:52:40 AM | P | PASS |
|
|
owner did tile floor heat in both bathrooms without inspection. he did provide some pictures of install and product Ul listing docs. I''ve spoke with Daryl and Riverside Electric will be taking full responsibility for the owners actions regarding bathroom tile floor heat. sorry for there action, please call with any questions, Mike Phone #: ###-#### Inspection requested via web by michael hunt Ok final. Floor heat in 2 locations tested properly
|
ELE20-00991
| Permanent Service | 3/18/2020 | 3/19/2020 | 3/19/2020 11:51:47 AM | P | PASS |
|
|
Please call Mitch 30 minutes prior ###-####. Phone #: ###-#### Inspection requested via web by Mitch Whited p/s o/h rec ok
|
ELE20-00411
| Electrical Rough-In | 3/19/2020 | 3/19/2020 | 3/19/2020 10:57:16 AM | P | PASS |
|
|
floor heat Phone #: ###-#### Inspection requested via web by Kevin Perez Ok cover floor heat mstr.
|
ELE20-00975
| Electrical Rough-In | 3/18/2020 | 3/19/2020 | 3/19/2020 10:32:20 AM | P | PASS |
|
|
Just need trench inspected for now, approval for backfill. Trench is in back yard, between house and new garage foundation. Please let me know when you are ready to head that way, I can meet you there to ask a couple of questions about the project. Thanks Phone #: ###-#### Inspection requested via web by Troy Cobb Ok cover conduit house to garage.
|
ELE19-04552
| Final | 3/18/2020 | 3/19/2020 | 3/19/2020 10:17:25 AM | A | PASS |
|
|
Working in detached garage, best access in alley Phone #: ###-#### Inspection requested via web by Kellan Curtis Ok final bath above garage
|
ELE19-04647
| Final | 3/18/2020 | 3/19/2020 | 3/19/2020 10:16:55 AM | A | PASS |
|
|
please call when 20 min out. thank you Phone #: ###-#### Inspection requested via web by Taras Shulga Ok final garage.
|
ELE20-00909
| Permanent Service | 3/19/2020 | 3/19/2020 | 3/19/2020 9:44:29 AM | A | PASS |
|
|
p/s u/g n ok
|
ELE20-00909
| Electrical Rough-In | 3/18/2020 | 3/19/2020 | 3/19/2020 9:44:11 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by ERIC CENTERS Ok cover.
|
ELE20-00835
| Final | 3/18/2020 | 3/19/2020 | 3/19/2020 9:20:11 AM | A | PASS |
|
|
FINAL--SERVICE ONLY--PERMANENT SERVICE ALREADY COMPLETE Phone #: ###-#### Inspection requested via web by Don Conley Ok final. Panel labeled
|
ELE20-00411
| Electrical Rough-In | 3/18/2020 | 3/19/2020 | 3/19/2020 8:58:56 AM | A | NR |
|
|
Upstairs bathroom floor heat inspection. Call for access Phone #: ###-#### Inspection requested via web by Kevin Perez
|