Inspections for the day of: Thursday, March 19, 2020.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE20-00999 Permanent Service3/19/20203/19/20203/19/2020 3:00:33 PMPPASS
###-#### 2 grd rods, intersystem installed. p/s o/h rec ok
ELE20-00999 Final3/19/20203/19/20203/19/2020 1:57:12 PMPCANC
Replaced damaged service mast Phone #: ###-#### Inspection requested via web by Matthew White I added a perm service.
ELE20-00939 Conference3/19/20203/19/20203/19/2020 1:39:54 PMPDONE
a 30-minute or more call ahead will be appreciated. this will be in conjunction with the final scheduled at the same location. ###-#### Phone #: ###-#### Inspection requested via web by Kerri Hamilton DC system, discussed labeleing
ELE20-00942 Final3/19/20203/19/20203/19/2020 12:56:24 PMPCANC
bill Phone #: ###-#### I added a conference.
ELE20-00942 Conference3/19/20203/19/20203/19/2020 12:56:01 PMPDONE
Discussed layout in garage and space above. GFI protection, required circuits, TR and WR.
ELE18-04477 Final3/19/20203/19/20203/19/2020 12:53:54 PMPCANC
We would like a 30-minute or more call ahead. We have a separate electrical permit for the solar that we will be asking for a consult at the same time. My contact number is ###-#### and my name is Graham Phone #: ###-#### Inspection requested via web by Kerri Hamilton Talked to Graham, he is going to check into the commissioning report. Once report is turned into the city then I will be notified when it is approved for final.
ELE19-01262 Final3/18/20203/19/20203/19/2020 11:52:40 AMPPASS
owner did tile floor heat in both bathrooms without inspection. he did provide some pictures of install and product Ul listing docs. I''ve spoke with Daryl and Riverside Electric will be taking full responsibility for the owners actions regarding bathroom tile floor heat.
sorry for there action,
please call with any questions,
Mike Phone #: ###-#### Inspection requested via web by michael hunt Ok final. Floor heat in 2 locations tested properly
ELE20-00991 Permanent Service3/18/20203/19/20203/19/2020 11:51:47 AMPPASS
Please call Mitch 30 minutes prior ###-####. Phone #: ###-#### Inspection requested via web by Mitch Whited p/s o/h rec ok
ELE20-00411 Electrical Rough-In3/19/20203/19/20203/19/2020 10:57:16 AMPPASS
floor heat Phone #: ###-#### Inspection requested via web by Kevin Perez Ok cover floor heat mstr.
ELE20-00975 Electrical Rough-In3/18/20203/19/20203/19/2020 10:32:20 AMPPASS
Just need trench inspected for now, approval for backfill. Trench is in back yard, between house and new garage foundation. Please let me know when you are ready to head that way, I can meet you there to ask a couple of questions about the project. Thanks Phone #: ###-#### Inspection requested via web by Troy Cobb Ok cover conduit house to garage.
ELE19-04552 Final3/18/20203/19/20203/19/2020 10:17:25 AMAPASS
Working in detached garage, best access in alley Phone #: ###-#### Inspection requested via web by Kellan Curtis Ok final bath above garage
ELE19-04647 Final3/18/20203/19/20203/19/2020 10:16:55 AMAPASS
please call when 20 min out. thank you Phone #: ###-#### Inspection requested via web by Taras Shulga Ok final garage.
ELE20-00909 Permanent Service3/19/20203/19/20203/19/2020 9:44:29 AMAPASS
p/s u/g n ok
ELE20-00909 Electrical Rough-In3/18/20203/19/20203/19/2020 9:44:11 AMAPASS
Phone #: ###-#### Inspection requested via web by ERIC CENTERS Ok cover.
ELE20-00835 Final3/18/20203/19/20203/19/2020 9:20:11 AMAPASS
FINAL--SERVICE ONLY--PERMANENT SERVICE ALREADY COMPLETE Phone #: ###-#### Inspection requested via web by Don Conley Ok final. Panel labeled
ELE20-00411 Electrical Rough-In3/18/20203/19/20203/19/2020 8:58:56 AMANR
Upstairs bathroom floor heat inspection.
Call for access Phone #: ###-#### Inspection requested via web by Kevin Perez