ELE19-00717
| Permanent Service | 3/4/2019 | 3/7/2019 | 3/7/2019 2:45:21 PM | P | PASS |
|
|
ZACH WILL BE ON SITE Phone #: ###-#### Inspection requested via web by Garrett Collins SER in rigid from meter to panel. Bond bushing panel side, grds/neut bonded, water bond verified. p/s o/h rec ok
|
ELE19-00753
| Permanent Service | 3/7/2019 | 3/7/2019 | 3/7/2019 2:05:15 PM | P | PASS |
|
|
Toli Phone #: ###-#### 1 existing ground rod present, a long with existing water bond. p/s o/h rec ok
|
ELE19-00800
| Final | 3/6/2019 | 3/7/2019 | 3/7/2019 1:49:45 PM | A | CANC |
|
|
Robert Phone #: ###-####
|
ELE15-00807
| Final | 3/7/2019 | 3/7/2019 | 3/7/2019 12:24:21 PM | P | PASS |
|
|
Ok final. Bath GFI's and floor heat GFI protection function properly.
|
ELE18-04859
| Final | 3/7/2019 | 3/7/2019 | 3/7/2019 10:53:14 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Stuart Welton Ok final. 240v recept for coffee machine is on GFI brkr.
|
ELE16-01663
| ELE-Aging Inspection | 3/7/2019 | 3/7/2019 | 3/7/2019 10:03:12 AM | | DONE |
|
|
Notified Lewis of another aging inspection.
|
ELE19-00804
| Temporary Service | 3/7/2019 | 3/7/2019 | 3/7/2019 9:43:50 AM | A | PASS |
|
|
Pole is easily accessed via alley. Phone #: ###-#### Inspection requested via web by Shaun Kirkman t/s o/h n ok
|
ELE19-00497
| Final | 3/7/2019 | 3/7/2019 | 3/7/2019 9:17:33 AM | A | PASS |
|
|
Please call prior to arrival for access. Phone #: ###-#### Inspection requested via web by Patrick Paz Ok final small basement area.
|
ELE19-00418
| Electrical Rough-In | 3/7/2019 | 3/7/2019 | 3/7/2019 8:54:20 AM | A | PASS |
|
|
Floor heat inspection in the master bath room. Please give me half an hour notice before inspection to insure access. Thank you Shaun ###-####. Phone #: ###-#### Inspection requested via web by Shaun Kirkman Ok cover flr heat mstr bath. Listed for wet locations.
|