ELE19-04930
| Final | 3/6/2020 | 3/9/2020 | 3/9/2020 2:47:35 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Garrett Collins Ok final kitchen. DW cord plug, lockout on hood
|
ELE20-00806
| Rough-In Permanent Service | 3/9/2020 | 3/9/2020 | 3/9/2020 2:12:52 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson Ok cover. p/s u/g n ok
|
ELE20-00753
| Permanent Service | 3/9/2020 | 3/9/2020 | 3/9/2020 1:56:15 PM | P | PASS |
|
|
This power is for unit 23, not 40. Could not get a hold of contractor. Unit number was as per contractor. GEC fixed. p/s o/h n ok
|
ELE20-00734
| Final | 3/9/2020 | 3/9/2020 | 3/9/2020 1:29:03 PM | P | PASS |
|
|
Final electrical inspection in conjunction with AltEnergy Solar inspection.
Thank you ; have a nice day! Phone #: ###-#### Inspection requested via web by JENNY EMEL Ok final.
|
ELE20-00688
| Final | 3/9/2020 | 3/9/2020 | 3/9/2020 1:28:46 PM | P | PASS |
|
|
Will call at 12 to schedule a time to meet out there. Phone #: ###-#### Inspection requested via web by Jesse Simpson Ok final. Labels present
|
ELE20-00799
| Electrical Rough-In | 3/6/2020 | 3/9/2020 | 3/9/2020 12:52:12 PM | A | PASS |
|
|
Need an inspection for the equipotential bonding. Patrick Rohm is the electrician contac.t Phone #: ###-#### Inspection requested via web by A.M.E. Office Ok cover. 4 corners bonded a long with motor. Large horizontal beams are welded to rebar which is all bonded. 4 LV lights, metal handrail will be bonded upon final.
|
ELE20-00664
| Electrical Rough-In | 3/6/2020 | 3/9/2020 | 3/9/2020 12:47:09 PM | A | PASS |
|
|
Taylor Barton is the onsite contact Phone #: ###-#### Inspection requested via web by BRS Permitting Items UL listed. Panel cover was off, saw connections to 30a 2 pole brkr. #10
|
ELE20-00800
| Final | 3/6/2020 | 3/9/2020 | 3/9/2020 11:44:00 AM | P | CANC |
|
|
Aric ###-#### Phone #: ###-#### >> Inspection requested via web by Arielle Hendricks Inspection cancelled from web by: Arielle Hendricks
|
ELE20-00268
| Electrical Rough-In | 3/6/2020 | 3/9/2020 | 3/9/2020 10:45:40 AM | P | PASS |
|
|
Steve Phone #: ###-#### Ok cover basement. 1 outlet needed to right of basement door. New panel replaced existing panel over stairs. Talked to Steve and homeowner about building a platform that can be folded down to enable servicing for future.
|
ELE20-00718
| Conference | 3/6/2020 | 3/9/2020 | 3/9/2020 10:08:48 AM | A | DONE |
|
|
Ahmad Phone #: ###-#### Discussed outlet layout for downstairs area, and required dedicated circuits.
|
ELE20-00609
| Electrical Rough-In | 3/8/2020 | 3/9/2020 | 3/9/2020 9:51:43 AM | A | PASS |
|
|
rough in Phone #: ###-#### Inspection requested via web by Barbara Szurgot Ok cover whole house.
|
ELE19-03017
| Permanent Service | 3/5/2020 | 3/9/2020 | 3/9/2020 9:19:23 AM | A | PASS |
|
|
service Phone #: ###-#### Inspection requested via web by Debby Pierce Equiptment tested, service was energized over the weekend. AFC present
|
ELE20-00257
| Final | 3/6/2020 | 3/9/2020 | 3/9/2020 9:18:21 AM | A | PASS |
|
|
Plans have been left on site Phone #: ###-#### Inspection requested via web by Kilee Russell Ok final. Line side connection. Labels present
|
ELE19-04930
| Final | 3/6/2020 | 3/9/2020 | 3/6/2020 12:14:09 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Garrett Collins Inspection cancelled from web by: Garrett Collins
|