ELE18-01605
| Electrical Rough-In | 4/29/2019 | 4/30/2019 | 4/30/2019 3:08:40 PM | P | PASS |
|
|
Building A Area A 1st and 2nd Floor Units Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
|
ELE19-00428
| Final | 4/30/2019 | 4/30/2019 | 4/30/2019 2:08:30 PM | P | PASS |
|
|
Rocky Phone #: ###-#### Ok final. Contractor was on-site. Needed GFI in garage, it was installed.
|
ELE19-01160
| Electrical Rough-In | 4/30/2019 | 4/30/2019 | 4/30/2019 1:49:14 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Calvin Bohrer Ok cover kitch, down bath and misc cutins throughout.
|
ELE19-01486
| Electrical Rough-In | 4/30/2019 | 4/30/2019 | 4/30/2019 12:50:56 PM | P | PASS |
|
|
trench inspection Phone #: ###-#### Inspection requested via web by Winters LLC Ok cover trench from house to garage to exterior panel.
|
ELE19-01557
| Conference | 4/30/2019 | 4/30/2019 | 4/30/2019 11:49:08 AM | P | DONE |
|
|
electrical consult. electrician onsite phone # ###-#### Phone #: ###-#### Inspection requested via web by Matthew White Discussed outlet layout for ADU.
|
ELE19-01332
| Electrical Rough-In | 4/30/2019 | 4/30/2019 | 4/30/2019 11:11:09 AM | P | PASS |
|
|
Wall rough in floral Phone #: ###-#### Inspection requested via web by Shane Lott Ok cover single outlet in new floral location.
|
ELE19-01564
| Electrical Rough-In | 4/29/2019 | 4/30/2019 | 4/30/2019 11:10:25 AM | A | PASS |
|
|
if possible please call half hour before inspection Phone #: ###-#### Inspection requested via web by Taras Shulga Ok cover bath and recept and switch in kitch.
|
ELE17-01952
| Final | 4/30/2019 | 4/30/2019 | 4/30/2019 10:15:14 AM | P | NH |
|
|
Inspection requested via web by jamie berg
|
ELE17-01799
| Final | 4/30/2019 | 4/30/2019 | 4/30/2019 9:53:51 AM | P | PASS |
|
|
Job completed as per Daryl DeGrange on 4/24/19
|
ELE19-00944
| Permanent Service | 4/29/2019 | 4/30/2019 | 4/30/2019 9:39:22 AM | A | PASS |
|
|
call cory with questions Phone #: ###-#### Inspection requested via web by A.M.E. Office p/s o/h n ok
|
ELE19-00944
| Electrical Rough-In | 4/29/2019 | 4/30/2019 | 4/30/2019 9:39:05 AM | A | PASS |
|
|
call cory with questions Phone #: ###-#### Inspection requested via web by A.M.E. Office Ok cover garage.
|
ELE14-01014
| ELE-Aging Inspection | 4/30/2019 | 4/30/2019 | 4/30/2019 9:18:39 AM | | DONE |
|
|
Talked to David. He thinks that this was taken care of, but he is going to contact homeowners and check to make sure.
|
ELE18-04028
| Final | 4/29/2019 | 4/30/2019 | 4/30/2019 9:13:05 AM | A | PASS |
|
|
Mitch Phone #: ###-#### Ok final. Panel labeled, intersystem installed.
|
MIS19-00111
| ELE-Conference | 4/29/2019 | 4/30/2019 | 4/30/2019 8:46:05 AM | A | DONE |
|
|
Daryl Spivey Phone #: ###-#### KC Enterprise pulled elec permit on 4/29/19
|
ELE17-01997
| Final | 4/29/2019 | 4/30/2019 | 4/30/2019 8:29:08 AM | A | PASS |
|
|
John ###-#### Re-scheudled for 4/30/19 at 8 am. Ok final.
|
ELE19-01515
| Final | 4/29/2019 | 4/30/2019 | 4/29/2019 1:07:55 PM | A | PASS |
|
|
Ok final. 2 grd rods. House changed to poly, no bond.
|