Inspections for the day of: Tuesday, April 30, 2019.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-01605 Electrical Rough-In4/29/20194/30/20194/30/2019 3:08:40 PMPPASS
Building A
Area A 1st and 2nd Floor Units Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
ELE19-00428 Final4/30/20194/30/20194/30/2019 2:08:30 PMPPASS
Rocky Phone #: ###-#### Ok final. Contractor was on-site. Needed GFI in garage, it was installed.
ELE19-01160 Electrical Rough-In4/30/20194/30/20194/30/2019 1:49:14 PMPPASS
Phone #: ###-#### Inspection requested via web by Calvin Bohrer Ok cover kitch, down bath and misc cutins throughout.
ELE19-01486 Electrical Rough-In4/30/20194/30/20194/30/2019 12:50:56 PMPPASS
trench inspection Phone #: ###-#### Inspection requested via web by Winters LLC Ok cover trench from house to garage to exterior panel.
ELE19-01557 Conference4/30/20194/30/20194/30/2019 11:49:08 AMPDONE
electrical consult. electrician onsite phone # ###-#### Phone #: ###-#### Inspection requested via web by Matthew White Discussed outlet layout for ADU.
ELE19-01332 Electrical Rough-In4/30/20194/30/20194/30/2019 11:11:09 AMPPASS
Wall rough in floral Phone #: ###-#### Inspection requested via web by Shane Lott Ok cover single outlet in new floral location.
ELE19-01564 Electrical Rough-In4/29/20194/30/20194/30/2019 11:10:25 AMAPASS
if possible please call half hour before inspection Phone #: ###-#### Inspection requested via web by Taras Shulga Ok cover bath and recept and switch in kitch.















ELE17-01952 Final4/30/20194/30/20194/30/2019 10:15:14 AMPNH
Inspection requested via web by jamie berg
ELE17-01799 Final4/30/20194/30/20194/30/2019 9:53:51 AMPPASS
Job completed as per Daryl DeGrange on 4/24/19
ELE19-00944 Permanent Service4/29/20194/30/20194/30/2019 9:39:22 AMAPASS
call cory with questions Phone #: ###-#### Inspection requested via web by A.M.E. Office p/s o/h n ok
ELE19-00944 Electrical Rough-In4/29/20194/30/20194/30/2019 9:39:05 AMAPASS
call cory with questions Phone #: ###-#### Inspection requested via web by A.M.E. Office Ok cover garage.
ELE14-01014 ELE-Aging Inspection4/30/20194/30/20194/30/2019 9:18:39 AM DONE
Talked to David. He thinks that this was taken care of, but he is going to contact homeowners and check to make sure.
ELE18-04028 Final4/29/20194/30/20194/30/2019 9:13:05 AMAPASS
Mitch Phone #: ###-#### Ok final. Panel labeled, intersystem installed.
MIS19-00111 ELE-Conference4/29/20194/30/20194/30/2019 8:46:05 AMADONE
Daryl Spivey Phone #: ###-#### KC Enterprise pulled elec permit on 4/29/19
ELE17-01997 Final4/29/20194/30/20194/30/2019 8:29:08 AMAPASS
John ###-#### Re-scheudled for 4/30/19 at 8 am. Ok final.
ELE19-01515 Final4/29/20194/30/20194/29/2019 1:07:55 PMAPASS
Ok final. 2 grd rods. House changed to poly, no bond.