ELE20-01214
| Final | 4/7/2020 | 4/7/2020 | 4/7/2020 2:08:34 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk Ok final.
|
ELE20-01176
| Final | 4/7/2020 | 4/7/2020 | 4/7/2020 1:06:11 PM | P | PASS |
|
|
shed// Joe *cleared* Phone #: ###-#### Ok final
|
ELE19-00947
| Final | 4/6/2020 | 4/7/2020 | 4/7/2020 12:13:12 PM | P | PART |
|
|
Partial final Phone #: ###-#### Inspection requested via web by Andy Chambers 2A classrooms.
|
ELE20-01172
| Final | 4/6/2020 | 4/7/2020 | 4/7/2020 11:33:44 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok final.
|
ELE20-00494
| Final | 4/7/2020 | 4/7/2020 | 4/7/2020 11:11:54 AM | P | PASS |
|
|
Front door will be unlocked Phone #: ###-#### Inspection requested via web by Kevin Heideman Ok final.
|
ELE20-01204
| Final | 4/6/2020 | 4/7/2020 | 4/7/2020 11:11:14 AM | A | PASS |
|
|
The school is open after 9 a.m.. Final inspection please. Thank you, Phone #: ###-#### Inspection requested via web by Kyle Lott Ok final. Existing power used to power new card reader.
|
ELE20-00878
| Final | 4/6/2020 | 4/7/2020 | 4/7/2020 10:36:01 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok final. 2 pole 20a OCP for rooftop minisplit.
|
ELE20-01217
| Electrical Rough-In | 4/6/2020 | 4/7/2020 | 4/7/2020 10:01:34 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by William Andrews Ok cover
|
ELE20-01214
| Permanent Service | 4/7/2020 | 4/7/2020 | 4/7/2020 9:36:50 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk p/s u/g n ok
|
ELE20-01219
| Permanent Service | 4/6/2020 | 4/7/2020 | 4/7/2020 8:33:26 AM | A | FAIL |
|
|
Dedicated well circuit needs inspected for a separate service to be installed. There is an existing service at the home. This is a second service location for the well using the same physical street address. Dustin ###-#### Phone #: ###-#### Inspection requested via web by Paula Gratiot 1. Expansion coupling upside down. 2. Need ground rod driven. Lugs on transformer are for lifting purposes for IDP, it is not a lug for a GEC although we have been allowing termination for temp poles.
|
ELE20-01214
| Permanent Service | 4/6/2020 | 4/7/2020 | 4/7/2020 8:19:02 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Alan Lusk Inspection cancelled from web by: Alan Lusk
|
ELE20-01214
| Final | 4/6/2020 | 4/7/2020 | 4/7/2020 8:18:57 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Alan Lusk Inspection cancelled from web by: Alan Lusk
|
ELE19-02224
| Electrical Rough-In | 4/6/2020 | 4/7/2020 | 4/7/2020 5:10:11 AM | A | PASS |
|
|
UFER inspection for the on-site generator. Have pictures and will send. If you have questions please call. ###-####. Thanks, Lonny Phone #: ###-#### Inspection requested via web by Lonny Baum Ok cover 3/0 copper for ufer on generator.
|
ELE20-01222
| Final | 4/6/2020 | 4/7/2020 | 4/7/2020 5:09:31 AM | A | PASS |
|
|
George Stanton Phone #: ###-#### Inspection requested via web by Danielle Henderson Ok final. Looked at job on 4/3. All labels present, 30a 2pole brkr. 200a service.
|
ELE20-00287
| Final | 4/6/2020 | 4/7/2020 | 4/6/2020 1:29:36 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Tyler Ridley Inspection cancelled from web by: Tyler Ridley
|
ELE20-01214
| Permanent Service | 4/6/2020 | 4/7/2020 | 4/6/2020 11:47:55 AM | A | CANC |
|
|
Ste #7 Phone #: ###-#### >> Inspection requested via web by Alan Lusk Inspection cancelled from web by: Alan Lusk
|