ELE19-01257
| Rough-In Permanent Service | 4/9/2019 | 4/9/2019 | 4/9/2019 2:33:05 PM | P | PASS |
|
|
Should be completed by 2pm. Please call when in route as I may leave for materials Phone #: ###-#### Inspection requested via web by Sean Patton New service 2grd rods. p/s o/h rec ok
|
ELE15-00849
| Final | 4/8/2019 | 4/9/2019 | 4/9/2019 1:52:28 PM | P | PASS |
|
|
Please go to the office they will have a key for you to get to the water feature equipment. There is also an open permit for this under permit number ELE15-00849 I believe that they are duplicates Thank you Phone #: ###-#### Inspection requested via web by Louis Keller Ok final. Thx for coordinating this inspection.
|
ELE19-01251
| Electrical Rough-In | 4/9/2019 | 4/9/2019 | 4/9/2019 1:10:35 PM | P | PASS |
|
|
For access please call Matt 1/2 hr prior to inspection. ###-#### Phone #: ###-#### Inspection requested via web by Terry Scott Ok cover living. 1 open wall, everything else still covered. 5 cans in ceiling.
|
ELE19-00038
| Final | 4/8/2019 | 4/9/2019 | 4/9/2019 12:26:00 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Garrett Collins
|
ELE18-04316
| Final | 4/9/2019 | 4/9/2019 | 4/9/2019 12:20:14 PM | P | PASS |
|
|
Amy Phone #: ###-#### Ok final.
|
ELE19-01262
| Electrical Rough-In | 4/9/2019 | 4/9/2019 | 4/9/2019 11:46:19 AM | P | PASS |
|
|
OK TO COVER, SUB PANEL ONLY. PERM. SERVICE AFTER SIDINGS IS COMPLETE. LOCK BOX CODE IS 8013 THANK YOU Phone #: ###-#### Inspection requested via web by michael hunt Ok cover whole house. Sub in basement.
|
ELE19-00326
| Final | 4/8/2019 | 4/9/2019 | 4/9/2019 11:02:24 AM | A | PASS |
|
|
garage code 0424 Phone #: ###-#### Inspection requested via web by Darryn Coburn Ok final.
|
ELE19-00401
| Temporary Service | 4/8/2019 | 4/9/2019 | 4/9/2019 11:02:09 AM | A | CANC |
|
|
garage code 0424 Phone #: ###-#### Inspection requested via web by Darryn Coburn Should have been a final for home.
|
ELE19-00401
| Final | 4/9/2019 | 4/9/2019 | 4/9/2019 11:01:49 AM | P | PASS |
|
|
Ok final. Was called in as final for temp service. Cancelled that inspection and added final for home.
|
ELE19-00378
| Final | 4/8/2019 | 4/9/2019 | 4/9/2019 10:37:33 AM | A | PASS |
|
|
GARAGE CODE 4224 Phone #: ###-#### Inspection requested via web by Bob Glenn Ok final.
|
ELE19-00803
| Final | 4/8/2019 | 4/9/2019 | 4/9/2019 9:16:48 AM | A | PASS |
|
|
Thank You! Phone #: ###-#### Inspection requested via web by Paul Young Ok final. 2 lights in up closet changed to LED trims, GFI changed to TR in bath, and wires protected in up storage. Walls not sheetrocked, wires are below 8'.
|
ELE18-03358
| Final | 4/8/2019 | 4/9/2019 | 4/9/2019 9:05:35 AM | A | PASS |
|
|
Please call ahead for final. Phone #: ###-#### Inspection requested via web by Brad Girard Ok final.
|