ELE19-01913
| Electrical Rough-In | 5/23/2019 | 5/23/2019 | 5/23/2019 3:23:21 PM | P | PASS |
|
|
Please call Ryan 30 mins prior as he is not on site Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok cover half wall and conference room walls.
|
ELE19-01910
| Temporary Service | 5/23/2019 | 5/23/2019 | 5/23/2019 2:33:10 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wilson t/s u/g n ok
|
ELE19-01911
| Temporary Service | 5/23/2019 | 5/23/2019 | 5/23/2019 2:32:53 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wilson t/s u/g n ok
|
ELE19-01912
| Temporary Service | 5/23/2019 | 5/23/2019 | 5/23/2019 2:32:39 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wilson t/s u/g n ok
|
ELE19-01899
| Final | 5/23/2019 | 5/23/2019 | 5/23/2019 2:02:58 PM | P | PASS |
|
|
Please call John to ensure access 30 minutes prior to inspection at ###-#### to meet you on site! Thx. Steve, BPL Phone #: ###-#### Inspection requested via web by Steven Meredith Ok final. LED lights added front, middle and end of store.
|
ELE18-02903
| Final | 5/23/2019 | 5/23/2019 | 5/23/2019 1:32:05 PM | P | PASS |
|
|
Call for access- Laura Phone #: ###-#### Ok final.
|
ELE18-01605
| Electrical Rough-In | 5/23/2019 | 5/23/2019 | 5/23/2019 1:04:08 PM | P | PASS |
|
|
A Building Area A and B corridors and common areas, 2nd Floor Includes Trash, janitor, cages, Lobby Common dinning, lounge, and bath room. Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
|
ELE19-01440
| Electrical Rough-In | 5/23/2019 | 5/23/2019 | 5/23/2019 1:03:41 PM | P | PASS |
|
|
Underground back parking lot Phone #: ###-#### Inspection requested via web by Jason Wicks Ok cover grd work on S side of building.
|
ELE19-01900
| Rough-In Permanent Service | 5/23/2019 | 5/23/2019 | 5/23/2019 11:58:07 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dan Rohl p/s u/g n ok
|
ELE19-01888
| Temporary Service | 5/23/2019 | 5/23/2019 | 5/23/2019 11:55:57 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk t/s u/g n ok
|
ELE19-01776
| Electrical Rough-In | 5/20/2019 | 5/23/2019 | 5/23/2019 11:51:28 AM | P | PASS |
|
|
Call the foreman, Brad Hallman, one hour prior to arrival to coordinate. Phone #: ###-#### Inspection requested via web by Rob Maes All items UL listed.
|
ELE19-01858
| Electrical Rough-In | 5/22/2019 | 5/23/2019 | 5/23/2019 11:22:16 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok cover IT rm, brkroom, and office.
|
ELE19-01871
| Final | 5/22/2019 | 5/23/2019 | 5/23/2019 10:45:45 AM | A | PASS |
|
|
Please call Kathy 30 minutes before arriving ###-#### and someone will meet you there Spoke with homeowner and informed we got an NH he stated he has been waiting for over an hour and the wife was there b4 that .... Thank you Phone #: ###-#### Inspection requested via web by Eric Schroeder Ok final.
|
ELE19-01171
| Final | 5/22/2019 | 5/23/2019 | 5/23/2019 10:26:07 AM | A | CANC |
|
|
Re-scheduled for 5/23/19. Talked to Daryl, he was going to see if Boise City Ulility and Maint needs permit for work done. Also all disc were locked. Need access. Talked to Mike with Utility Maint. He is going to try to make it up there on Fri, if not it will be next Tue.
|
ELE19-01491
| Electrical Rough-In | 5/22/2019 | 5/23/2019 | 5/23/2019 10:18:44 AM | A | PASS |
|
|
Lock box code 8068. If you have any questions please feel free to contact Andrew ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok cover.
|
ELE19-01491
| Permanent Service | 5/23/2019 | 5/23/2019 | 5/23/2019 10:18:26 AM | P | PASS |
|
|
p/s u/g rec ok
|
ELE19-01882
| Conference | 5/22/2019 | 5/23/2019 | 5/23/2019 9:42:57 AM | A | DONE |
|
|
Ivan Phone #: ###-#### Discussed code requirements and outlet layout.
|
ELE19-01128
| Permanent Service | 5/22/2019 | 5/23/2019 | 5/23/2019 9:27:05 AM | A | PASS |
|
|
Inspection Request for Grounding of Service Panel Only, before concrete is poured. Not a full service inspection. Thank You. Phone #: ###-#### Inspection requested via web by Paula Gratiot Ok cover ufer. Main panel and disc for sub panel have GEC tied to rebar in wall. Wall will be concrete.
|
ELE19-00690
| Final | 5/22/2019 | 5/23/2019 | 5/23/2019 8:39:51 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bob Glenn Ok final.
|
ELE18-03697
| Conference | 5/21/2019 | 5/23/2019 | 5/22/2019 6:08:59 AM | P | DONE |
|
|
Scheduling this per inspector''s request re: cancellation of this inspection. The problems were subsequently addressed in the now finalized ELE18-03772 permit. Thank you. Phone #: ###-#### Inspection requested via web by Josh Pennington This is to close out homeowner permit. An electrical contractor pulled permit and took job over. Job is finaled out.
|