ELE20-01751
| Final | 6/9/2020 | 6/10/2020 | 6/10/2020 4:34:47 PM | P | PASS |
|
|
added a sub panel next to the main panel. added a two pole 60 amp breaker to feed furnace in attic. Furnace in attic has 60 amp disconnect built in furnace. added a circuit for split system at side of house in view of panel. Owner asked to be called 30 min before inspection at ###-####. name is Spencer. Thank you. Phone #: ###-#### Inspection requested via web by Taras Shulga Ok final. Contractor did load calc, figured 156a of loads on 200a all in one service.
|
ELE20-00655
| Final | 6/10/2020 | 6/10/2020 | 6/10/2020 1:39:10 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Shaun Kirkman Ok final
|
ELE18-00250
| Final | 6/9/2020 | 6/10/2020 | 6/10/2020 12:49:42 PM | P | PASS |
|
|
Gregory *screened* Phone #: ###-#### Ok final.
|
ELE20-01802
| Rough-In Permanent Service | 6/10/2020 | 6/10/2020 | 6/10/2020 12:14:04 PM | P | PASS |
|
|
please call ahead Phone #: ###-#### Inspection requested via web by Kyle Dillon p/s o/h n ok
|
ELE20-00300
| Electrical Rough-In | 6/10/2020 | 6/10/2020 | 6/10/2020 11:35:48 AM | P | PASS |
|
|
Radient floor heat in master bath. Up Phone #: ###-#### Inspection requested via web by David Mackey Ok cover floor heat mstr off kitchen
|
ELE19-03017
| Final | 6/10/2020 | 6/10/2020 | 6/10/2020 11:13:14 AM | P | PART |
|
|
final area B Phone #: ###-#### Inspection requested via web by Debby Pierce Area B classrooms
|
ELE20-01527
| Electrical Rough-In | 6/9/2020 | 6/10/2020 | 6/10/2020 11:12:49 AM | A | PASS |
|
|
Underground Inspection, Kenny Williams is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce Ok cover conduits on W side of gate entrance
|
ELE20-01040
| Electrical Rough-In | 6/9/2020 | 6/10/2020 | 6/10/2020 10:27:48 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok cover borders 2 rooms SE corner
|
ELE20-01946
| Permanent Service | 6/9/2020 | 6/10/2020 | 6/10/2020 9:58:41 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by ERIC CENTERS p/s u/g n ok
|
ELE20-01946
| Electrical Rough-In | 6/9/2020 | 6/10/2020 | 6/10/2020 9:58:23 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by ERIC CENTERS Ok cover
|
ELE19-03407
| Final | 6/9/2020 | 6/10/2020 | 6/10/2020 9:14:08 AM | A | PASS |
|
|
Key lock at front door, LOL will unlock to access key. Phone #: ###-#### Inspection requested via web by Ryan Wilson Max fuse 20, 20a brkr installed.
|
ELE20-01871
| Electrical Rough-In | 6/9/2020 | 6/10/2020 | 6/10/2020 9:09:04 AM | A | PASS |
|
|
Bonding, underground cover, and equipotential Phone #: ###-#### Inspection requested via web by Kevin Koomler EQ plane will be atleast 4" below finished grade when done.
|
ELE16-01189
| ELE-Aging Inspection | 6/10/2020 | 6/10/2020 | 6/10/2020 5:53:52 AM | | PASS |
|
|
Seperate permitt was pulled for this address by Sublime Elec. Corrections were made, and they also roughed in bonus room that should be up for a final here soon
|
ELE16-01189
| Final | 6/10/2020 | 6/10/2020 | 6/10/2020 5:52:31 AM | A | PASS |
|
|
Sublime Elec pulled permit and finished areas of house that needed corrections. Corrections were made. They also roughed in bonus room. Final should be coming soon
|