ELE16-03274
| ELE-Aging Inspection | 6/25/2019 | 6/25/2019 | 6/26/2019 12:27:37 PM | | DONE |
|
|
Left message with contractor and mentioned homeowner needing to pull permit to finish work himself. Homeowner permit will need to be pulled before I can final this one out.
|
ELE19-01858
| Final | 6/24/2019 | 6/25/2019 | 6/25/2019 2:22:46 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok final.
|
ELE19-02310
| Electrical Rough-In | 6/25/2019 | 6/25/2019 | 6/25/2019 2:02:57 PM | P | PASS |
|
|
Call Kaleb for access ###-#### Phone #: ###-#### Inspection requested via web by jamie berg Ok cover 1 room upstairs.
|
ELE19-02132
| Rough-In Permanent Service | 6/24/2019 | 6/25/2019 | 6/25/2019 1:43:26 PM | P | PASS |
|
|
It will be open. If you have any questions please feel free to contact Tony ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan p/s u/g n ok
|
ELE19-02313
| Permanent Service | 6/25/2019 | 6/25/2019 | 6/25/2019 1:43:06 PM | P | PASS |
|
|
p/s o/h n ok
|
ELE19-02313
| Final | 6/25/2019 | 6/25/2019 | 6/25/2019 12:41:59 PM | P | CANC |
|
|
Service only. Home owner has own permit for residential wiring. Phone #: ###-#### Inspection requested via web by Garrett Collins Should have been a p/s
|
ELE19-02315
| Permanent Service | 6/25/2019 | 6/25/2019 | 6/25/2019 12:25:35 PM | P | PASS |
|
|
David Addington. Service upgrade Phone #: ###-#### Inspection requested via web by Same Electric Existing overhead drrop to new service installation on existing pole. There is a existing pool, but the first accessible spot to overhead drop is over 22.5 feet. Festoon lighting is strung directly over pool in a few areas and fairly low. Mentioned to electrician that it needed to be taken down before final. p/s o/h rec ok
|
ELE18-01606
| Electrical Rough-In | 6/25/2019 | 6/25/2019 | 6/25/2019 12:06:53 PM | P | PASS |
|
|
B Building 2nd and 3rd Floor D Area Corridor Drops Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed.
|
ELE18-01605
| Electrical Rough-In | 6/25/2019 | 6/25/2019 | 6/25/2019 12:06:35 PM | P | PASS |
|
|
A Building 2nd and 3rd Floor A area corridor drops Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover areas listed
|
ELE19-00240
| Final | 6/24/2019 | 6/25/2019 | 6/25/2019 12:06:10 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by John VanZandt Ok final.
|
ELE19-02245
| Electrical Rough-In | 6/24/2019 | 6/25/2019 | 6/25/2019 10:02:36 AM | A | PASS |
|
|
Inspect walls for cover. Phone #: ###-#### Inspection requested via web by Jeremy Cloud Ok cover N and S walls of support room on S side of building.
|
ELE18-02078
| Final | 6/24/2019 | 6/25/2019 | 6/25/2019 9:31:12 AM | A | PASS |
|
|
Jill Phone #: ###-#### Ok final. All recepts are TR. Wires in open ceiling are protected. J-box covers installed. A platform has been built as panel is in stairwell. There was really no place for panel to be moved to without an excessive cost.
|
ELE19-02154
| Rough-In Permanent Service | 6/24/2019 | 6/25/2019 | 6/25/2019 9:18:09 AM | A | CANC |
|
|
Service change to be done at later time. Just want to energize new meter. Please call Doug if you have any questions. ###-#### Phone #: ###-#### Inspection requested via web by Barbara Szurgot Spoke with Doug. He is going to wait until IDP disconnects so he can move new meter base in existing location. No energize.
|
ELE18-03920
| Final | 6/24/2019 | 6/25/2019 | 6/25/2019 8:57:25 AM | A | PASS |
|
|
Need final on upstairs Inspection requested via web by dennis mcneely Ok final upstairs. 2 other permits on house. 1 for main level ELE18-02998, and another for the garage ELE18-01105. Both still in issue status.
|
ELE19-00991
| Electrical Rough-In | 6/24/2019 | 6/25/2019 | 6/24/2019 2:53:20 PM | A | PASS |
|
|
Tile floor heat master bathroom Phone #: ###-#### Inspection requested via web by danny perrine Ok cover flr heat mstr.
|