ELE20-01673
| Rough-In Permanent Service | 6/3/2020 | 6/3/2020 | 6/3/2020 2:44:20 PM | P | PASS |
|
|
Rough- in for new single family residence. Phone #: ###-#### Inspection requested via web by David Mackey Ok cover. p/s o/h n ok
|
ELE18-01089
| Final | 6/3/2020 | 6/3/2020 | 6/3/2020 2:05:37 PM | P | PASS |
|
|
Please call me half an hour before inspection to insure access. Thank you Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman Ok final front room extension.
|
ELE20-01880
| Electrical Rough-In | 6/3/2020 | 6/3/2020 | 6/3/2020 1:49:18 PM | P | CANC |
|
|
Electrical rough in of Basement area Phone #: ###-#### Inspection requested via web by ERIC CENTERS As per Mike E.
|
ELE20-00799
| Final | 6/3/2020 | 6/3/2020 | 6/3/2020 1:21:48 PM | P | PASS |
|
|
Patrick (electrician) said they needed inspection for controllers for pool light and cover and handrail bonding to be looked at from last inspection. Thank you Phone #: ###-#### Inspection requested via web by A.M.E. Office Ok final. Metal railings are bonded underneath concrete walkway
|
ELE19-01846
| Conference | 6/3/2020 | 6/3/2020 | 6/3/2020 1:10:16 PM | P | DONE |
|
|
screened // wants to know how to final out permit // Lara Phone #: ###-#### Discussed what all needed to be done for a final.
|
ELE19-03407
| Final | 6/2/2020 | 6/3/2020 | 6/3/2020 12:06:15 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wilson Ok final. 20a max, 20a installed
|
ELE20-01688
| Electrical Rough-In | 6/2/2020 | 6/3/2020 | 6/3/2020 11:55:55 AM | A | PASS |
|
|
Jay Walters will be the onsite contact - ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting All components UL listed
|
ELE20-00829
| Final | 6/2/2020 | 6/3/2020 | 6/3/2020 11:17:09 AM | A | PASS |
|
|
Garage code 2019 or 2020 Phone #: ###-#### Inspection requested via web by Darryn Coburn Ok final
|
ELE20-00901
| Final | 6/2/2020 | 6/3/2020 | 6/3/2020 11:16:33 AM | A | PASS |
|
|
Garage code 2019 or 2020 Phone #: ###-#### Inspection requested via web by Darryn Coburn Ok final
|
ELE20-00900
| Final | 6/2/2020 | 6/3/2020 | 6/3/2020 11:16:02 AM | A | PASS |
|
|
Garage code 2019 or 2020 Phone #: ###-#### Inspection requested via web by Darryn Coburn Ok final
|
ELE19-03017
| Electrical Rough-In | 6/3/2020 | 6/3/2020 | 6/3/2020 10:50:30 AM | P | PASS |
|
|
kitchen ceiling Phone #: ###-#### Inspection requested via web by Debby Pierce Ok cover kitchen ceiling
|
ELE17-03823
| Final | 6/2/2020 | 6/3/2020 | 6/3/2020 10:49:13 AM | A | PASS |
|
|
Talked to electrician, going to reschedule for 6/3 Ok final. All metal handrails were all bonded prior to covering, also verified with contractor.
|
ELE20-01875
| Permanent Service | 6/2/2020 | 6/3/2020 | 6/3/2020 9:55:52 AM | A | PASS |
|
|
Door code 3480 Phone #: ###-#### Inspection requested via web by Dave Brueggemann Talked to contractor, house to be gutted and redone electrically. p/s o/h rec ok
|
ELE20-01846
| Final | 6/2/2020 | 6/3/2020 | 6/3/2020 9:00:20 AM | A | PASS |
|
|
Rescheduled for 6/3 after talking to electrician Ok final. Verified 30a brkr #10 thhn
|
ELE20-01872
| Permanent Service | 6/2/2020 | 6/3/2020 | 6/3/2020 8:31:25 AM | A | PASS |
|
|
Screw riser back to structure due to wind storm and falling branches. Phone #: ###-#### Inspection requested via web by Kevin Burke New mast and wires to weather head. p/s o/h rec ok
|