ELE19-02224
| Permanent Service | 7/23/2020 | 7/27/2020 | 7/27/2020 2:10:53 PM | P | PASS |
|
|
Service inspection to turn on main power to building. Call Lonny when on-site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum Service to be energized so a few spider boxes can be placed throughout for contruction power. All equiptment has been tested and approval stickers placed on equipt by testing agency. p/s u/g n ok
|
ELE20-02230
| Permanent Service | 7/27/2020 | 7/27/2020 | 7/27/2020 1:13:31 PM | P | PASS |
|
|
Need re-inspection for permanent service. Idaho Power shut down power so we can tap new solar into service feeders. Need inspection to restore power. Ready by 12 Phone #: ###-#### Inspection requested via web by Sean Patton Received pic of 2nd grd rod, and line side connection in meter main. p/s o/h rec ok
|
ELE20-02573
| Electrical Rough-In | 7/24/2020 | 7/27/2020 | 7/27/2020 12:28:03 PM | P | PASS |
|
|
Please call Dakota ###-#### with any questions. Phone #: ###-#### Inspection requested via web by keri Carter Ok cover grd work in front planter area. Coordinate with owner and I will check inside lighting when final is called in.
|
ELE20-02584
| Rough-In Permanent Service | 7/24/2020 | 7/27/2020 | 7/27/2020 11:11:13 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Heath Thomas Ok cover garage and space above. p/s o/h n ok
|
ELE20-02113
| Final | 7/21/2020 | 7/27/2020 | 7/27/2020 9:13:23 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by keri Carter Ok final. Verified GFI and power for AC when I did inspection for A-1
|
ELE20-02582
| Electrical Rough-In | 7/24/2020 | 7/27/2020 | 7/27/2020 9:09:20 AM | A | PASS |
|
|
Rough in conduit underground to panel for hot tub Phone #: ###-#### Inspection requested via web by Rem Fox Ok cover 1in and 3/4in conduit. 1in is over 18 deep, 3/4 is for data that is over 12in.
|