ELE19-02498
| Rough-In Permanent Service | 7/8/2019 | 7/8/2019 | 7/8/2019 2:01:22 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Robert Schroder p/s u/g n ok
|
ELE19-02066
| Electrical Rough-In | 7/8/2019 | 7/8/2019 | 7/8/2019 1:23:32 PM | P | PASS |
|
|
Lock box code is 0001 Call Andrew with any questions at ###-#### Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok cover up and down.
|
ELE19-01864
| Electrical Rough-In | 7/5/2019 | 7/8/2019 | 7/8/2019 12:25:25 PM | P | PASS |
|
|
Tile Heat Inspection Phone #: ###-#### Inspection requested via web by Greg Idsinga Ok cover flr heat upstairs.
|
ELE17-00882
| ELE-Aging Inspection | 7/8/2019 | 7/8/2019 | 7/8/2019 10:21:36 AM | | DONE |
|
|
Please schedule a final inspection.
|
ELE19-00779
| Final | 7/5/2019 | 7/8/2019 | 7/8/2019 9:57:22 AM | A | PASS |
|
|
Josh Phone #: ###-#### Ok final. Corrections made.
|
ELE18-02363
| Final | 7/3/2019 | 7/8/2019 | 7/8/2019 9:35:06 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Petros Paflias
|
ELE19-02492
| Conference | 7/5/2019 | 7/8/2019 | 7/8/2019 8:48:23 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Nick Smith Discussed new power to garage, and the required circuits a long with protection.
|
ELE18-04546
| Electrical Rough-In | 7/8/2019 | 7/8/2019 | 7/8/2019 8:44:24 AM | A | PASS |
|
|
master bathroom floor heat Phone #: ###-#### Inspection requested via web by Eric Brown Ok cover mstr flr heat.
|
ELE19-02496
| Electrical Rough-In | 7/8/2019 | 7/8/2019 | 7/8/2019 7:52:17 AM | P | CANC |
|
|
Access is around back through gate on either side. Lynn Williams may or may not be home but is aware. Phone #: ###-#### >> Inspection requested via web by David McClellan Inspection cancelled from web by: David McClellan
|