ELE20-02324
| Conference | 7/7/2020 | 7/8/2020 | 7/8/2020 2:10:13 PM | P | DONE |
|
|
We are wiring our new bathroom in our garage. Phone #: ###-#### Inspection requested via web by Nate Spangler Discussed power from house to detached shop. 1 ground rod, Circuit for existing lights, circuit for existing recept, and a few new circuits for new bathroom.
|
ELE20-02027
| Electrical Rough-In | 7/7/2020 | 7/8/2020 | 7/8/2020 1:28:48 PM | P | PASS |
|
|
Jay Walters is the onsite contact - ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting Items UL listed.
|
ELE20-00166
| Final | 7/7/2020 | 7/8/2020 | 7/8/2020 1:01:28 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Danny Pardee Ok final. Labeling and disc on W side of sign
|
ELE20-00259
| Final | 7/8/2020 | 7/8/2020 | 7/8/2020 12:16:34 PM | P | PASS |
|
|
Ashleigh - */Screened*/ Phone #: ###-#### Ok final. LV system that has cord and plugs in to 110v recept
|
ELE20-01756
| Permanent Service | 7/7/2020 | 7/8/2020 | 7/8/2020 11:12:53 AM | P | CANC |
|
|
Steven ###-#### Talked with homeowner about scheduling a conference with an IDP designer about service mast height in alley. From roof to top of weatherhead is about 10ft. I would consider it more of a hazard than anything. Homeowner going to get back with me.
|
ELE19-03145
| Electrical Rough-In | 7/8/2020 | 7/8/2020 | 7/8/2020 11:02:42 AM | A | PASS |
|
|
Light pole bases Phone #: ###-#### Inspection requested via web by Kevin Burke Ok cover 4 light pole bases
|
ELE20-02246
| Electrical Rough-In | 7/7/2020 | 7/8/2020 | 7/8/2020 10:26:45 AM | A | PASS |
|
|
wall cover inspection for house. panel is on the exterior of house. Phone #: ###-#### Inspection requested via web by Taras Shulga Ok cover house, NO service
|
ELE20-00261
| Final | 7/8/2020 | 7/8/2020 | 7/8/2020 10:12:44 AM | P | PASS |
|
|
Ashleigh - */Screened*/ Phone #: ###-#### Ok final. LV panel with plug in 110v power
|
ELE20-02328
| Conference | 7/7/2020 | 7/8/2020 | 7/8/2020 10:09:32 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Ryan Bennett Discussed install of power to 2 sheds in backyard.
|
ELE20-01994
| Electrical Rough-In | 7/7/2020 | 7/8/2020 | 7/8/2020 9:47:29 AM | A | PASS |
|
|
Underground/ gym perimeter Phone #: ###-#### Inspection requested via web by Andy Chambers Ok cover conduit inside perimeter of gym
|
ELE19-04403
| Final | 7/7/2020 | 7/8/2020 | 7/8/2020 9:45:59 AM | A | PASS |
|
|
Please call a few minutes ahead if possible. Phone #: ###-#### Inspection requested via web by Greg Stahl Ok final.
|
ELE19-04745
| Final | 7/7/2020 | 7/8/2020 | 7/7/2020 1:44:22 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Danny Pardee Ok final. Labeling and disc on left side of sign up high on front of building
|
ELE19-03731
| Final | 7/7/2020 | 7/8/2020 | 7/7/2020 1:34:35 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Danny Pardee Ok final. UL listed, disc on left side of sign
|