Inspections for the day of: Thursday, August 29, 2019.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-03223 Rough-In Permanent Service8/29/20198/29/20198/29/2019 2:03:53 PMPPASS
Phone #: ###-#### Inspection requested via web by Kevin Heideman Ok cover. p/s u/g n ok
ELE19-03249 Rough-In Permanent Service8/29/20198/29/20198/29/2019 1:52:36 PMPPASS
Moving meter to new wall Idaho power won''t be able to disconnect and reconnect till tomorrow. Should have meter/panel up 12 noon. Thank you Phone #: ###-#### Inspection requested via web by David Kubik p/s o/h rec ok
ELE19-01613 Electrical Rough-In8/29/20198/29/20198/29/2019 1:13:54 PMPPASS
This request is for a step light inspection. thank you! Phone #: ###-#### Inspection requested via web by Darryn Coburn Ok cover outside entry step lights.
ELE19-03250 Electrical Rough-In8/29/20198/29/20198/29/2019 1:12:35 PMPPASS
Phone #: ###-#### Inspection requested via web by Ryan Wilson Ok cover RI. No service.
ELE19-00977 Final8/29/20198/29/20198/29/2019 12:33:27 PMPNR
Please call ahead 30 mins so we can meet you Phone #: ###-#### Inspection requested via web by John VanZandt
ELE19-03254 Electrical Rough-In8/29/20198/29/20198/29/2019 12:33:10 PMPPASS
Phone #: ###-#### Inspection requested via web by Don Conley Ok cover small ceiling inside rear of house. Burnt wires replaced. 2 Jboxes used with new 12/2 between. They are blanked.
ELE18-01606 Final8/29/20198/29/20198/29/2019 11:01:11 AMPPART
B Building
2nd and 4th Floor Corridors Phone #: ###-#### Inspection requested via web by Stephanie Huston Partial for corridor lighting.
ELE18-01605 Final8/29/20198/29/20198/29/2019 11:00:49 AMPPART
A Building
2nd and 3rd Floor Corridors Phone #: ###-#### Inspection requested via web by Stephanie Huston Partial on corriidor lighting.
ELE19-02224 Electrical Rough-In8/28/20198/29/20198/29/2019 11:00:23 AMAPASS
Need inspection of lightning protection system being installed at ground level. Call Lonny when on site. Thanks, Lonny Phone #: ###-#### Inspection requested via web by Lonny Baum Ok cover 4/0 lightning protection. 27 locations around building that are cad welded to building steel. a long with 27 grd rods that will also be of cad weld connection. Plans call for grd rods roughly every 60ft.
ELE17-02938 Final8/28/20198/29/20198/29/2019 9:58:30 AMAPASS
Phone #: ###-#### Inspection requested via web by Lyalll Wohlschlager Ok final. Equipt on top of elevator. There are lights in shaft.
ELE19-03076 Electrical Rough-In8/28/20198/29/20198/29/2019 9:57:49 AMAPASS
Jay Walters Phone #: ###-#### Inspection requested via web by BRS Permitting Ok cover. Items UL listed.
ELE19-02923 Final8/28/20198/29/20198/29/2019 9:13:22 AMAPASS
Inspect new meter pack - demo''d old panels and installed new panels - 1 in bathroom was relocated. General wiring. Phone #: ###-#### Inspection requested via web by Kendra Lanham Ok final. GFI added in both kitchens for 2nd circuit. Recepts replaced are on GFI brkrs. Panels labeled
ELE19-03216 Temporary Service8/28/20198/29/20198/29/2019 8:51:03 AMAPASS
Temp pole is in the back of the lot Phone #: ###-#### Inspection requested via web by Charles Davis t/s u/g n ok
ELE19-03240 Permanent Service8/29/20198/29/20198/29/2019 8:20:39 AMPPASS
This is 2nd job I've added a permanent service. For future inspections, if service isnt requested, it wont get inspected. p/s u/g n ok
ELE19-03240 Electrical Rough-In8/28/20198/29/20198/29/2019 8:18:38 AMAPASS
Phone #: ###-#### Inspection requested via web by Ryan Schaffer Ok cover
ELE17-03084 ELE-Aging Inspection8/29/20198/29/20198/29/2019 6:11:19 AM DONE
Please schedule an inspection if work is completed, or call with progress on construction.