ELE18-02134
| Permanent Service | 8/9/2018 | 8/9/2018 | 8/9/2018 2:26:55 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jake Cutler A concrete pad is to be poured in front of new service disconnect and meters. 2 grd rods. Metal hand rail was removed from in front of all panel locations. A new grate is to be installed in window well to allow for code compliant access to all panels. Cords being used for temp power to all units panels is SEOOW #6 SO cord. New service drop moving to left of existing service. p/s o/h n ok
|
ELE18-00950
| Final | 8/8/2018 | 8/9/2018 | 8/9/2018 2:03:11 PM | P | PASS |
|
|
Please call Adam ###-#### to meet you. If you have any questions please feel free to contact Luke ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok final.
|
ELE18-02313
| Electrical Rough-In | 8/8/2018 | 8/9/2018 | 8/9/2018 2:02:50 PM | P | PASS |
|
|
We would like a light pole base inspection please. Thank you. Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover 3 lts. E side of front parking lot.
|
ELE18-02895
| Conference | 8/9/2018 | 8/9/2018 | 8/9/2018 10:52:09 AM | P | DONE |
|
|
Phone #: ###-#### Inspection requested via web by David McClellan Discussed hot tob location and overhead power clearances as per code. A structure built above hot tub will not be sufficient. Talked about moving E overhead line to E side of property.
|
ELE18-03011
| Electrical Rough-In | 8/8/2018 | 8/9/2018 | 8/9/2018 10:49:59 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wake Ok cover basement. Talked to Ryan, he is going to change out 2 pancake boxes to PF boxes in room off bath.
|
ELE18-02978
| Rough-In Permanent Service | 8/6/2018 | 8/9/2018 | 8/9/2018 9:39:50 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Emmet Bushman p/s u/g n ok
|
ELE18-03022
| Temporary Service | 8/9/2018 | 8/9/2018 | 8/9/2018 9:39:30 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ben Archibald t/s u/g n ok
|
ELE18-02839
| Final | 8/8/2018 | 8/9/2018 | 8/9/2018 9:39:10 AM | A | PASS |
|
|
Mike Allen, the electrical foreman, will be on site Please call him to let him know when you are on your way. He can be reached at ###-####. Phone #: ###-#### Inspection requested via web by Ashley White Ok final,.
|
ELE18-02839
| Electrical Rough-In | 8/8/2018 | 8/9/2018 | 8/9/2018 9:38:50 AM | A | PASS |
|
|
Mike Allen, the electrical foreman, will be on site Please call him to let him know when you are on your way. He can be reached at ###-####. Phone #: ###-#### Inspection requested via web by Ashley White Ok cover. All items UL listed.
|
ELE12-01889
| ELE-Aging Inspection | 8/9/2018 | 8/9/2018 | 8/9/2018 7:15:01 AM | | DONE |
|
|
Many attempts have been made to contact homeowner. A final inspection is needed.
|