ELE18-04622
| Conference | 9/13/2019 | 9/13/2019 | 9/16/2019 5:13:48 AM | P | DONE |
|
|
is this still valid?? Tony #415 Conference was given. Homeowner wired and finished his own house.
|
ELE19-02151
| Final | 9/13/2019 | 9/13/2019 | 9/13/2019 1:48:07 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by John VanZandt Talked to John about wall heater tripping brkr. Excess grd wire was cut off inside unit, it was touching side of thermostat. Problem fixed.
|
ELE19-03465
| Conference | 9/13/2019 | 9/13/2019 | 9/13/2019 1:21:57 PM | P | DONE |
|
|
teddy Phone #: ###-####-0100 Discussed hot tub installation. Wire size, disc, bonding of metal parts.
|
ELE19-03086
| Final | 9/13/2019 | 9/13/2019 | 9/13/2019 1:09:59 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Justin Yount Ok final.
|
ELE19-03234
| Electrical Rough-In | 9/12/2019 | 9/13/2019 | 9/13/2019 12:14:16 PM | P | PASS |
|
|
Please call Dan prior to arrival. A grid inspection is needed. Phone #: ###-#### Inspection requested via web by Lynn Proctor Ok cover. Grid being replaced with hard lid. A couple of boxes needed mudrings to extend boxes
|
ELE18-01605
| Final | 9/12/2019 | 9/13/2019 | 9/13/2019 12:13:13 PM | P | CANC |
|
|
Roof inspection Phone #: ###-#### Inspection requested via web by Stephanie Huston Talked to electrician he needed to cancel
|
ELE18-01606
| Final | 9/12/2019 | 9/13/2019 | 9/13/2019 12:12:37 PM | P | CANC |
|
|
Roof inspection Phone #: ###-#### Inspection requested via web by Stephanie Huston Taked to electrician said he needed to cancel
|
ELE19-03411
| Rough-In Permanent Service | 9/12/2019 | 9/13/2019 | 9/13/2019 11:18:06 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jason Scott Ok cover. p/s u/g n ok
|
ELE19-02224
| Electrical Rough-In | 9/12/2019 | 9/13/2019 | 9/13/2019 10:45:40 AM | A | PASS |
|
|
Rough-in inspection of roof top walls level 3 ; 4. Call Lonny when on site, ###-####. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum Ok cover parapet S center and SE corner.
|
ELE19-00344
| Final | 9/12/2019 | 9/13/2019 | 9/13/2019 10:07:04 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brad Christensen Ok final.
|
ELE19-02066
| Final | 9/12/2019 | 9/13/2019 | 9/13/2019 10:06:36 AM | A | PASS |
|
|
Lock Box 0001. If you have any questions please call Andrew ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok final. Corrections made.
|
ELE19-03246
| Electrical Rough-In | 9/12/2019 | 9/13/2019 | 9/13/2019 9:22:47 AM | A | PASS |
|
|
We need a cover inspection for this dwelling. Thank you Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover whole house.
|
ELE19-03399
| Electrical Rough-In | 9/12/2019 | 9/13/2019 | 9/13/2019 8:57:00 AM | A | PASS |
|
|
We will be onsite. Panel left off roof for verifying listings. Phone #: ###-#### Inspection requested via web by Jesse Simpson Ok cover. Items UL listed and panels verified.
|
ELE19-03145
| Electrical Rough-In | 9/12/2019 | 9/13/2019 | 9/13/2019 8:56:26 AM | A | PASS |
|
|
Ground works through stairwell stem wall. Phone #: ###-#### Inspection requested via web by Kevin Burke Ok cover conduit S side of building.
|