ELE14-00277
| ELE-Aging Inspection | 9/4/2018 | 9/4/2018 | 9/7/2018 10:23:16 AM | | DONE |
|
|
Please schedule a final inspection.
|
ELE18-03356
| Conference | 9/4/2018 | 9/4/2018 | 9/4/2018 2:59:02 PM | P | DONE |
|
|
Call half hour before Jennifer Phone #: ###-#### Discussed outlet and lighting requirements for 2 baths, hall and kitchen. Also discussed possibility of battery powered smoke detectors. Walls and ceilings will not be opened up for accessibility.
|
ELE17-03241
| Final | 8/30/2018 | 9/4/2018 | 9/4/2018 2:43:49 PM | P | PASS |
|
|
Please call ahead with as much notice as possible home is occupied . ###-#### Phone #: ###-#### Inspection requested via web by TRENT Swaim Ok final.
|
ELE18-03185
| Electrical Rough-In | 9/4/2018 | 9/4/2018 | 9/4/2018 1:19:34 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jose Guerrero Ok cover.
|
ELE18-01450
| Final | 8/31/2018 | 9/4/2018 | 9/4/2018 12:43:22 PM | A | FAIL |
|
|
Need verification of bondimg ispection for pool. Pool is existing. Bonding needed for metal pool cover for cover. Junction box needed for splice powering motor. Talked to contractor, he is going to get fixed and call back in when complete. Home is occupied, and looks like pool has been used. Pool not to be used until items are corrected.
|
ELE18-03160
| Electrical Rough-In | 8/31/2018 | 9/4/2018 | 9/4/2018 11:19:38 AM | A | PASS |
|
|
Lawrence Phone #: ###-#### Ok cover pool border for concrete. Bonding boots present for hand rail and diving board. Light on N end bonded. 4 corners bonded.
|
ELE18-03210
| Electrical Rough-In | 8/31/2018 | 9/4/2018 | 9/4/2018 10:46:01 AM | A | PASS |
|
|
Please call Shane ###-#### to meet you. If you have any questions please feel free to contact Luke ###-####. Thanks!!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok cover addition.
|
ELE18-03358
| Electrical Rough-In | 9/3/2018 | 9/4/2018 | 9/4/2018 10:45:32 AM | A | PASS |
|
|
lock box combo 6069 Phone #: ###-#### Inspection requested via web by Brad Girard Ok cover ADU above garage
|
ELE18-03107
| Electrical Rough-In | 8/31/2018 | 9/4/2018 | 9/4/2018 10:15:32 AM | A | PASS |
|
|
Ken Williams is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce Ok cover N end of basement.
|
ELE18-03298
| Electrical Rough-In | 8/31/2018 | 9/4/2018 | 9/4/2018 9:55:02 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot Ok cover. HV and speaker wire in lid of new patio addition. Depending on type of light, a fire rated surround will be needed around fixture. Either fire hat, or double layer 5/8 sheetrock. Looks like new structure does have access to existing attic space.
|
ELE18-02799
| Final | 8/31/2018 | 9/4/2018 | 9/4/2018 9:52:33 AM | A | PASS |
|
|
Please call on way ###-#### Phone #: ###-#### Inspection requested via web by Same Electric Ok final.
|
ELE13-02725
| ELE-Aging Inspection | 9/4/2018 | 9/4/2018 | 9/4/2018 7:21:50 AM | | DONE |
|
|
Please schedule a final inspection.
|