ELE19-00191
| Conference | 1/23/2019 | 1/23/2019 | 1/23/2019 2:19:26 PM | P | PASS |
|
|
Drew Phone #: ###-####... discussed requirements for wiring new space in garage...creating sewing rm with bathroom discussed requirements for service upgrade f homeowner chooses too...grounding requirements, service feed wire size, and verification that existing meterbase is able to have larger main breaker installed-manuf. paperwork unreadable homeowner competent and pamphlet given
|
ELE18-04135
| Final | 1/23/2019 | 1/23/2019 | 1/23/2019 1:02:08 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jonathan Poot...corrections made...ok to final
|
ELE19-00269
| Conference | 1/22/2019 | 1/23/2019 | 1/23/2019 12:44:30 PM | P | PASS |
|
|
Please call me 30 minutes prior to arrival so that I may inform the homeowner and the electrician. Many thanks Karin ###-#### Phone #: ###-#### Inspection requested via web by JENNY EMEL... discussed Boise City requirements for replacing a split bus panel that has burnt up...no main disconnect at meter location...grounding not to current code
|
ELE19-00274
| Conference | 1/22/2019 | 1/23/2019 | 1/23/2019 10:19:12 AM | A | CANC |
|
|
I would like an electrical cover inspection for the kitchen, owners son is always home for access or call me for other special access instructions! Thx. Steve, BPL Phone #: ###-#### Inspection requested via web by Steven Meredith... rough inspection needed not conference
|
ELE19-00274
| Electrical Rough-In | 1/23/2019 | 1/23/2019 | 1/23/2019 10:18:31 AM | A | PASS |
|
|
I would like an electrical cover inspection for the kitchen, owners son is always home for access or call me for other special access instructions! Thx. Steve, BPL Phone #: ###-#### Inspection requested via web by Steven Meredith... rough ok to cover
|
ELE18-04653
| Electrical Rough-In | 1/23/2019 | 1/23/2019 | 1/23/2019 10:11:31 AM | A | FAIL |
|
|
Jason Curley ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting... no one working contact number given had no answer and mailbox full could not leave message rough inspection is mandatory before final can be given
|
ELE18-02759
| Final | 1/23/2019 | 1/23/2019 | 1/23/2019 9:07:02 AM | A | PASS |
|
|
Requesting a final inspection located at the West Boise Water Renewal Facility. The contact is Lynn Waite at the above phone number Phone #: ###-#### Inspection requested via web by Aaron Whiteley...ok to final
|
ELE19-00257
| Permanent Service | 1/22/2019 | 1/23/2019 | 1/23/2019 8:24:13 AM | A | PASS |
|
|
Brent phone ###-####... p/s o/h reconnect ok
|
ELE19-00268
| Temporary Service | 1/22/2019 | 1/23/2019 | 1/22/2019 4:43:21 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn... t/s u/g new ok
|