ELE20-00050
| Temporary Service | 1/6/2020 | 1/6/2020 | 1/6/2020 2:53:48 PM | P | PASS |
|
|
Temp power is located on the west side of the project Phone #: ###-#### Inspection requested via web by Brad Girard...t/s u/g new ok
|
ELE19-04657
| Electrical Rough-In | 1/6/2020 | 1/6/2020 | 1/6/2020 2:15:19 PM | P | PASS |
|
|
Corbin Metcalf ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg... out building rough-in ok to cover...panel needs addressed-main breaker or panel with no more than 6 swipes of hand
|
ELE20-00026
| Electrical Rough-In | 1/6/2020 | 1/6/2020 | 1/6/2020 1:40:50 PM | P | CANC |
|
|
rough-in, permanent service // Woody Phone #: ###-####...changed to rough-in permanent service
|
ELE20-00026
| Rough-In Permanent Service | 1/6/2020 | 1/6/2020 | 1/6/2020 1:40:18 PM | P | PASS |
|
|
rough-in, permanent service // Woody Phone #: ###-####... rough-in ok to cover verify space htr size at time of final..2 per circuit 20A...living/dining 30A circuit p/s u/g new ok
|
ELE19-04850
| Final | 1/6/2020 | 1/6/2020 | 1/6/2020 11:59:11 AM | P | NR |
|
|
Jay Phone #: ###-####... power required to be on at residence before final can be given
|
ELE17-02337
| ELE-Aging Inspection | 1/6/2020 | 1/6/2020 | 1/6/2020 9:47:06 AM | | FAIL |
|
|
no access no one home contractor making no attempt to schedule required inspection and address needed corrections
|
ELE20-00012
| Electrical Rough-In | 1/3/2020 | 1/6/2020 | 1/6/2020 9:01:31 AM | A | PASS |
|
|
Call when in route if possible. Phone #: ###-#### Inspection requested via web by Steve McCloy...new kitchen area..walls only ok to cover
|