Inspections for the day of: Thursday, October 11, 2018.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-00261 Final10/4/201810/11/201810/11/2018 3:31:46 PMPPASS
Charelene Phone #: ###-####...ok to final
ELE18-02953 Permanent Service10/11/201810/11/201810/11/2018 2:56:21 PMPNR
Phone #: ###-#### Inspection requested via web by cris flores...
dead front needs installed at house panel before perm service can be given
ELE18-02300 Electrical Rough-In10/11/201810/11/201810/11/2018 2:25:41 PMPPASS
Rough in at one interior wall for cover so we can mount panels. Opposite side has already been inspected. Phone #: ###-#### Inspection requested via web by Jason Parke...panel rm wall...panel location
ELE18-03783 Electrical Rough-In10/9/201810/11/201810/11/2018 1:54:23 PMPPASS
Phone #: ###-#### Inspection requested via web by Rob Maes...UL listing verified..60 Amp breaker installed in panel
ELE18-03866 Electrical Rough-In10/10/201810/11/201810/11/2018 1:04:34 PMPPASS
Please call Aaron Hall Phone #: ###-#### Inspection requested via web by Kevin Perez..
underground ok to cover
ELE18-03904 Final10/11/201810/11/201810/11/2018 12:40:14 PMPPASS
Robert Phone #: ###-####...ok to final
ELE18-03882 Rough-In Permanent Service10/10/201810/11/201810/11/2018 11:16:41 AMAPASS
Duplex Phone #: ###-#### Inspection requested via web by David Nelson...
rough in ok to cover
p/s u/g new ok...2 meters
ELE18-03894 Rough-In Permanent Service10/10/201810/11/201810/11/2018 11:16:04 AMAPASS
Duplex Phone #: ###-#### Inspection requested via web by David Nelson...
rough in ok to cover
p/s u/g new ok...2 meters
ELE18-03896 Electrical Rough-In10/10/201810/11/201810/11/2018 10:34:39 AMAPASS
please call one hour before inspection Phone #: ###-#### Inspection requested via web by Taras Shulga...new wall in existing covered patio..back wall 4/5 outlets...ok to cover
ELE18-02856 Final10/10/201810/11/201810/11/2018 10:04:17 AMAPASS
Louis Phone #: ###-####...ok to final
ELE18-03395 Final10/10/201810/11/201810/11/2018 9:28:50 AMAFAIL
Phone #: ###-#### Inspection requested via web by Darryn Coburn...
1..hot/neutral reverse on outlet..middle hair station
2..outlets (x 2) within 6ft of sink shall have GFI protection-pedicure rm
3..junction box or outlet box incomplete-facial rm
4..outlet within 6ft of sink shall have GFI protection-storage/dryer area sink
ELE18-03030 Electrical Rough-In10/10/201810/11/201810/11/2018 8:53:00 AMAPASS
Floor heat inspection for cover. Back slider door is open, and the addition is not connected into existing home. Phone #: ###-#### Inspection requested via web by Barbara Szurgot
tile heat ok to cover
ELE18-03880 Temporary Service10/10/201810/11/201810/11/2018 8:33:31 AMAPASS
Phone #: ###-#### Inspection requested via web by Todd Hall...
t/s u/g new ok