ELE19-02583
| Final | 10/10/2019 | 10/11/2019 | 10/11/2019 3:09:53 PM | P | PASS |
|
|
There will be people they''re working on the property to let you in. any questions please give me a call thank you Phone #: ###-#### Inspection requested via web by David Kubik..ok to final
|
ELE19-03858
| Electrical Rough-In | 10/10/2019 | 10/11/2019 | 10/11/2019 3:09:32 PM | P | PASS |
|
|
underground (underslab) for island stub up and floor box in Collaboration room in clubhouse Phone #: ###-#### Inspection requested via web by Todd Hall
|
ELE19-02085
| Final | 10/11/2019 | 10/11/2019 | 10/11/2019 2:01:58 PM | P | PASS |
|
|
Please call 30 mins prior Phone #: ###-#### Inspection requested via web by Kerri Hamilton... corrections made...ok to final
|
ELE19-03711
| Final | 10/9/2019 | 10/11/2019 | 10/11/2019 1:37:46 PM | P | NH |
|
|
I was hoping you might be able to get to her house after 1pm? I''m assuming she will be at work until that time. Thank you! Phone #: ###-#### Inspection requested via web by Tricia Henderson...no one home...knocked on door and rang doorbell...1:35 PM
|
ELE19-02542
| Electrical Rough-In | 10/11/2019 | 10/11/2019 | 10/11/2019 1:15:48 PM | P | PASS |
|
|
Underground ; office rough in. Phone #: ###-#### Inspection requested via web by Dan Cox.. underground outside East end building and office walls ok to cover
|
ELE19-03938
| Electrical Rough-In | 10/11/2019 | 10/11/2019 | 10/11/2019 11:32:24 AM | P | PASS |
|
|
trench cover inspection. electrician onsite, Ben Culp. can contact office for more details. Phone #: ###-#### Inspection requested via web by Matthew White...ok to cover pipe to shed...fed of disconnect for heat pump...verify circuit ability at final...110 circuit to shed-2 outlets and light
|
ELE19-03921
| Temporary Service | 10/11/2019 | 10/11/2019 | 10/11/2019 11:13:37 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Greg Traudt...t/s u/g new ok
|
ELE19-03920
| Temporary Service | 10/11/2019 | 10/11/2019 | 10/11/2019 11:13:13 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Greg Traudt...t/s u/g new ok
|
ELE19-03538
| Final | 10/8/2019 | 10/11/2019 | 10/11/2019 10:53:10 AM | A | PASS |
|
|
I''m 20-30 minutes away, please call in advance so I can meet you there. Phone #: ###-#### Inspection requested via web by Dan Hilke.... power for new excercise equipment on floor...M/C drop down pole...ok to final
|
ELE19-03930
| Conference | 10/10/2019 | 10/11/2019 | 10/11/2019 10:20:06 AM | A | PASS |
|
|
Scott-can you explain branch circuit extensions and such to Scott so he knows if he needs to add more fixtures? Preety please Phone #: ###-####...discussed wiring of new bathroom configuration and room downstairs...outlets need added for new walls...rm is not classified as bedroom-no AFCI protection is required...over viewed bathroom wiring...pamphlet given
|
ELE19-02085
| Final | 10/10/2019 | 10/11/2019 | 10/11/2019 9:16:50 AM | A | FAIL |
|
|
Please call 30 mins prior Phone #: ###-#### Inspection requested via web by Kerri Hamilton.. 1) hallways/corridors shall have tamper resistant outlets 2) circuit labelling shall be verified...circuit A40 on plate is not correct circuit...electrician will need to be at inspection for verification
|
ELE19-03765
| Electrical Rough-In | 10/10/2019 | 10/11/2019 | 10/11/2019 8:39:48 AM | A | PASS |
|
|
Electrical Rough in on new wall. Added 7 Electrical Outlets and 5 Data stubs.
Tim ###-#### Phone #: ###-#### Inspection requested via web by Tim Lawrence...wall ok to cover
|
ELE19-02689
| Electrical Rough-In | 10/11/2019 | 10/11/2019 | 10/11/2019 8:05:42 AM | A | PASS |
|
|
Trench check from sidewalk to house. Please call ahead 10 minutes ahead. If it could be before 8:30, that''d be great, if not then after 9:15. Thanks! Phone #: ###-#### Inspection requested via web by Brad Downs...ok to cover
|
ELE19-03885
| Permanent Service | 10/11/2019 | 10/11/2019 | 10/11/2019 12:00:00 AM | P | CANC |
|
|
Cancel per Paul will call in at a later date Paul Phone #: ###-#### -please call prior
|