ELE18-03561
| Final | 11/13/2018 | 11/14/2018 | 11/14/2018 3:16:48 PM | P | FAIL |
|
|
Ben Phone #: ###-####.. 1..panel shall be legibly identified as to its clear and specific purpose or use..408.4 2..closet lights too close to closet shelf or rod..410.16 3..riser shall be strapped within 3ft of meter 4..sealtite shall be strapped within 8" of disconnect
|
ELE17-00783
| Electrical Rough-In | 11/14/2018 | 11/14/2018 | 11/14/2018 2:29:06 PM | P | CANC |
|
|
Chris Phone #: ###-####...homeowner unable to meet in afternoon and was late scheduling for morning. Was unable to make inspection in AM so homeowner said will reschedule for friday when has day off
|
ELE18-04381
| Permanent Service | 11/14/2018 | 11/14/2018 | 11/14/2018 2:15:57 PM | P | PASS |
|
|
office number -###-#### Mike is the Electrician on site Phone #: ###-#### Inspection requested via web by Matthew White.. verify at final eddison circuits on 2-pole breakers and clearance of 3ft is infront of panel p/s u/g reconnect ok
|
ELE17-03257
| Final | 11/14/2018 | 11/14/2018 | 11/14/2018 2:04:08 PM | P | FAIL |
|
|
Rocky- Phone #: ###-####... Bad GFI breaker on exterior oitlets
|
ELE18-04336
| Electrical Rough-In | 11/13/2018 | 11/14/2018 | 11/14/2018 1:42:31 PM | P | PASS |
|
|
Taylor Barton Contact Phone #: ###-#### Inspection requested via web by BRS Permitting.. UL listed equipment line side tap...panel in backyard...will need access for final
|
ELE18-04131
| Electrical Rough-In | 11/14/2018 | 11/14/2018 | 11/14/2018 1:20:55 PM | P | PASS |
|
|
Please do a cover inspection for the Kitchen areas! Thx. Steve, Phone #: ###-#### Inspection requested via web by Steven Meredith.. phase 2 of remodel...kitchen ok to cover
|
ELE18-04372
| Permanent Service | 11/14/2018 | 11/14/2018 | 11/14/2018 12:50:28 PM | A | CANC |
|
|
meet homeowner gary grey at 8AM to go over service...rescheduled wrong day
|
ELE18-04372
| Permanent Service | 11/13/2018 | 11/14/2018 | 11/14/2018 12:49:50 PM | A | CANC |
|
|
new fuse box on South side of bulding // Gary Gray Phone #: ###-####.... rescheduled for 11/15/18 AM
|
ELE18-04371
| Electrical Rough-In | 11/13/2018 | 11/14/2018 | 11/14/2018 9:59:15 AM | A | PASS |
|
|
new outlets added on new wall Phone #: ###-#### Inspection requested via web by Barbara Szurgot...office new wall...1 outlet, new walls reworked...ok to cover
|
ELE18-02698
| Electrical Rough-In | 11/13/2018 | 11/14/2018 | 11/14/2018 9:36:32 AM | A | FAIL |
|
|
Paul (Pavel) Phone #: ###-####... 1..junctionboxes shall be completely closed 2..wires shall be stapled within 8" of box and 4.5ft there after 3..all wires shall be ran and stapled as needed for future island circuits
|
ELE18-04379
| Temporary Service | 11/13/2018 | 11/14/2018 | 11/14/2018 8:52:38 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey...t/s u/g new ok
|
ELE18-04378
| Temporary Service | 11/13/2018 | 11/14/2018 | 11/14/2018 8:52:14 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey...t/s u/g new ok
|
ELE18-02759
| Electrical Rough-In | 11/13/2018 | 11/14/2018 | 11/14/2018 8:51:49 AM | A | PASS |
|
|
This is a cover inspection for the new office space. Also inspecting the service and transformer install. We are at this site starting at 6am. Phone #: ###-#### Inspection requested via web by Aaron Whiteley... walls of new office ok to cover service off existing panel with added transformer..ok power on
|