Inspections for the day of: Friday, November 30, 2018.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-04592 Conference11/30/201811/30/201811/30/2018 3:37:46 PMPPASS
Call 20 mins ahead- Ray Phone #: ###-####
verified as homeowner
knowledgeable in wiring of hot tub
discussed disconnect location, wiring method, and further inspections...rough in and underground
ELE18-04223 Electrical Rough-In11/30/201811/30/201811/30/2018 2:51:05 PMPPASS
ceiling Phone #: ###-#### Inspection requested via web by Bryan McLaughlin...grid ok
ELE18-04153 Electrical Rough-In11/30/201811/30/201811/30/2018 2:20:07 PMPPASS
Walls inspection for Riser Room Phone #: ###-#### Inspection requested via web by Dean Gernaat...
ok to cover
ELE18-04510 Electrical Rough-In11/30/201811/30/201811/30/2018 2:00:37 PMPPASS
Ken Williams is contact at ###-####. thank you. Phone #: ###-#### Inspection requested via web by Debby Pierce...
open walls no power ok to cover
outlets fished down walls and switches being moved for new wall closures
open walls with new electrical ok to cover
ELE18-04510 Conference11/30/201811/30/201811/30/2018 1:58:25 PMPPASS
Ken Williams is contact at ###-####. thank you. Phone #: ###-#### Inspection requested via web by Debby Pierce...
walked job to verify what needs inspected at time or future...electrical demo and open walls where fished circuits...one location ceiling grid reconstructed will be scheduled for rough inspection
ELE18-03349 Final11/27/201811/30/201811/30/2018 1:23:41 PMPPASS
Jeff Phone #: ###-####-please call 30 minutes prior to meet...ok to final
ELE18-03340 Final11/30/201811/30/201811/30/2018 1:23:11 PMAPASS
Phone #: ###-#### Inspection requested via web by Todd Hall...ok to final
ELE18-03582 Final11/30/201811/30/201811/30/2018 12:47:52 PMPFAIL
Please call Lynn prior to arrival this afternoon. Thank you! Phone #: ###-#### Inspection requested via web by Lynn Proctor...
1..OCPD shall be sized to manufacturers rating..nameplate max 20A
2..plate missing on switches
3..can in master closet to close to shelving
4..romex for island outlet shall be protected from physical damage..shelf/drawer side of island
ELE18-04551 Final11/30/201811/30/201811/30/2018 12:02:12 PMPPASS
Listing inspection for solar equipment.

Please call ahead before you head to site so that I can make sure someone is there to meet you.

Ryan King at 2088508965
or
Michael Chadek at 208.965.7649 Phone #: ###-#### Inspection requested via web by Ryan King...
OCPD, labelling, and disconnect ok
ELE18-04551 Electrical Rough-In11/29/201811/30/201811/30/2018 12:01:39 PMAPASS
Listing inspection for solar equipment.

Please call ahead before you head to site so that I can make sure someone is there to meet you.

Ryan King at 2088508965
or
Michael Chadek at 208.965.7649 Phone #: ###-#### Inspection requested via web by Ryan King...
UL listing verified...removal from roof...ok
ELE18-01007 Conference11/29/201811/30/201811/30/2018 11:20:33 AMAPASS
Please call ahead for access - Russ Phone #: ###-####...
pamphlet given
went over wiring of residence
knowledgeable in work
ELE18-01007 Electrical Rough-In11/30/201811/30/201811/30/2018 11:19:43 AMAPASS
Please call ahead for access - Russ Phone #: ###-####...
ok to cover
ELE18-04151 Electrical Rough-In11/29/201811/30/201811/30/2018 10:33:01 AMAPASS
looking to get an ok to flood ceiling tiles
looking for a ceiling inspection of existing fixtures
tied off fixtures
thank you and have a good friday Phone #: ###-#### Inspection requested via web by leon ramirez...
ok to cover
ELE18-04422 Electrical Rough-In11/29/201811/30/201811/30/2018 9:59:19 AMANH
Contact: Jason Noble Phone #: ###-#### Inspection requested via web by Deb Gooden..
no access
discussed with contractor fees need adjusted for work done...rough in of upstairs
ELE18-02295 Electrical Rough-In11/29/201811/30/201811/30/2018 9:17:58 AMAPASS
Ceiling cover in two classrooms. Phone #: ###-#### Inspection requested via web by Debby Pierce...

ceiling grid for 2 classrooms ok to cover
ELE18-04581 Electrical Rough-In11/29/201811/30/201811/30/2018 8:37:18 AMAPASS
Please call Brian @ ###-#### before arrival so he can give you directions of how to gain access. Thank you Phone #: ###-#### Inspection requested via web by Winters LLC...

wall cover for new breakroom wall ok
strain reliefs need added to outlet drops by final
ELE18-04518 Final11/29/201811/30/201811/30/2018 8:15:30 AMAPASS
please let me know when done Phone #: ###-#### Inspection requested via web by Thomas wilson...
ok to final
ELE18-04538 Final11/29/201811/30/201811/30/2018 8:15:02 AMAPASS
Phone #: ###-#### Inspection requested via web by Thomas wilson...
ok to final
ELE18-03687 Final11/28/201811/30/201811/28/2018 11:54:06 AMACANC
Phone #: ###-#### >> Inspection requested via web by Laurie Hoelscher Inspection cancelled from web by: Laurie Hoelscher