ELE13-02889
| ELE-Aging Inspection | 12/6/2018 | 12/6/2018 | 12/6/2018 2:23:29 PM | | PASS |
|
|
still under construction
|
ELE18-04638
| Final | 12/6/2018 | 12/6/2018 | 12/6/2018 2:22:56 PM | P | NR |
|
|
Please perform in the late afternoon and call Brodie at ###-#### when on the way. Phone #: ###-#### Inspection requested via web by William Salts.... not ready for final needed perm service inspection schedule final once power in restored
|
ELE18-04638
| Permanent Service | 12/6/2018 | 12/6/2018 | 12/6/2018 2:21:40 PM | P | PASS |
|
|
Please perform in the late afternoon and call Brodie at ###-#### when on the way. Phone #: ###-#### Inspection requested via web by William Salts.... p/s o/h reconnect ok
|
ELE18-04651
| Final | 12/6/2018 | 12/6/2018 | 12/6/2018 1:27:42 PM | P | CANC |
|
|
When you turn off of Mtn View Onto Delmonte drive straight ahead into dead end driveway. It’s the red brick garage on the right.
Please lock padlock on side of garage door after inspection complete Phone #: ###-#### Inspection requested via web by Jake Cutler...
needed permanent service inspection will schedule final once power is on
|
ELE18-04651
| Permanent Service | 12/6/2018 | 12/6/2018 | 12/6/2018 1:26:42 PM | P | PASS |
|
|
When you turn off of Mtn View Onto Delmonte drive straight ahead into dead end driveway. It’s the red brick garage on the right.
Please lock padlock on side of garage door after inspection complete Phone #: ###-#### Inspection requested via web by Jake Cutler... this is a permanent service only...house and garage rewire will be done on seperate permit
p/s o/h new ok
|
ELE18-04652
| Conference | 12/6/2018 | 12/6/2018 | 12/6/2018 1:04:53 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Tyler Stewart... discussed wiring of fireplace, needed outlets for walls, and LV and HV wiring seperation pamphlet given...homeowner competent...done work previously
|
ELE18-04540
| Final | 12/5/2018 | 12/6/2018 | 12/6/2018 11:34:32 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by BRS Permitting... 1)..Boise City ordinance of rough inspection shall be done before a final inspection can be scheduled 2)..this is not contractors first installation in city of Boise and has been informed multiple times of this requirement. The contractor shall remove all material off roof and have on ground for rough-in inspection as per requirement. 3..double fee shall be applied to permit
|
ELE18-04592
| Electrical Rough-In | 12/5/2018 | 12/6/2018 | 12/6/2018 10:49:01 AM | A | PASS |
|
|
Ray Phone #: ###-####... rough in for hot tub SCH80 PVC exterior from meter/main #6 thhn to disconnect PVC pipe in ground to depth 50A circuit...ok to cover and hook up
|
ELE18-04494
| Electrical Rough-In | 12/5/2018 | 12/6/2018 | 12/6/2018 10:11:52 AM | A | PASS |
|
|
Front ceiling Phone #: ###-#### Inspection requested via web by Kevin Burke... ok to cover
|
ELE18-04647
| Final | 12/5/2018 | 12/6/2018 | 12/6/2018 9:37:59 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by steve ragan... non metered street light junction box with ground rod and inline splice #6 thhn piped to transformer ok to final
|
ELE18-04647
| Permanent Service | 12/6/2018 | 12/6/2018 | 12/6/2018 9:36:31 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by steve ragan... p/s u/g non metered street light...ok to power
|
ELE18-02295
| Electrical Rough-In | 12/5/2018 | 12/6/2018 | 12/6/2018 8:54:33 AM | A | PASS |
|
|
Cover inspection for remaining t-grid, hallway and P.E office Phone #: ###-#### Inspection requested via web by Debby Pierce... grid complete...ok to cover
|