Inspections for the day of: Thursday, December 6, 2018.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE13-02889 ELE-Aging Inspection12/6/201812/6/201812/6/2018 2:23:29 PM PASS
still under construction
ELE18-04638 Final12/6/201812/6/201812/6/2018 2:22:56 PMPNR
Please perform in the late afternoon and call Brodie at ###-#### when on the way. Phone #: ###-#### Inspection requested via web by William Salts....
not ready for final
needed perm service inspection
schedule final once power in restored
ELE18-04638 Permanent Service12/6/201812/6/201812/6/2018 2:21:40 PMPPASS
Please perform in the late afternoon and call Brodie at ###-#### when on the way. Phone #: ###-#### Inspection requested via web by William Salts....
p/s o/h reconnect ok
ELE18-04651 Final12/6/201812/6/201812/6/2018 1:27:42 PMPCANC
When you turn off of Mtn View Onto Delmonte drive straight ahead into dead end driveway. It’s the red brick garage on the right.

Please lock padlock on side of garage door after inspection complete Phone #: ###-#### Inspection requested via web by Jake Cutler...

needed permanent service inspection
will schedule final once power is on
ELE18-04651 Permanent Service12/6/201812/6/201812/6/2018 1:26:42 PMPPASS
When you turn off of Mtn View Onto Delmonte drive straight ahead into dead end driveway. It’s the red brick garage on the right.

Please lock padlock on side of garage door after inspection complete Phone #: ###-#### Inspection requested via web by Jake Cutler...
this is a permanent service only...house and garage rewire will be done on seperate permit

p/s o/h new ok
ELE18-04652 Conference12/6/201812/6/201812/6/2018 1:04:53 PMPPASS
Phone #: ###-#### Inspection requested via web by Tyler Stewart...
discussed wiring of fireplace, needed outlets for walls, and LV and HV wiring seperation
pamphlet given...homeowner competent...done work previously
ELE18-04540 Final12/5/201812/6/201812/6/2018 11:34:32 AMAFAIL
Phone #: ###-#### Inspection requested via web by BRS Permitting...
1)..Boise City ordinance of rough inspection shall be done before a final inspection can be scheduled
2)..this is not contractors first installation in city of Boise and has been informed multiple times of this requirement. The contractor shall remove all material off roof and have on ground for rough-in inspection as per requirement.
3..double fee shall be applied to permit
ELE18-04592 Electrical Rough-In12/5/201812/6/201812/6/2018 10:49:01 AMAPASS
Ray Phone #: ###-####...
rough in for hot tub
SCH80 PVC exterior from meter/main
#6 thhn to disconnect
PVC pipe in ground to depth
50A circuit...ok to cover and hook up


ELE18-04494 Electrical Rough-In12/5/201812/6/201812/6/2018 10:11:52 AMAPASS
Front ceiling Phone #: ###-#### Inspection requested via web by Kevin Burke...
ok to cover
ELE18-04647 Final12/5/201812/6/201812/6/2018 9:37:59 AMAPASS
Phone #: ###-#### Inspection requested via web by steve ragan...
non metered street light
junction box with ground rod and inline splice
#6 thhn piped to transformer
ok to final
ELE18-04647 Permanent Service12/6/201812/6/201812/6/2018 9:36:31 AMAPASS
Phone #: ###-#### Inspection requested via web by steve ragan...
p/s u/g non metered street light...ok to power
ELE18-02295 Electrical Rough-In12/5/201812/6/201812/6/2018 8:54:33 AMAPASS
Cover inspection for remaining t-grid, hallway and P.E office Phone #: ###-#### Inspection requested via web by Debby Pierce...
grid complete...ok to cover