Inspections for the day of: Friday, December 6, 2019.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-04649 Permanent Service12/3/201912/6/201912/6/2019 2:31:37 PMPCANC
CONTACT: JASON NOBLE Phone #: ###-#### Inspection requested via web by Deb Gooden...did not schedule shut down with ID Power...will reschedule
ELE19-04229 Final12/4/201912/6/201912/6/2019 2:23:22 PMPPASS
Homeowner should be there Phone #: ###-#### Inspection requested via web by Troy Cobb...ok to final
ELE19-03251 Final12/6/201912/6/201912/6/2019 1:43:26 PMPPASS
Phone #: ###-#### Inspection requested via web by Jake Cutler..ok to final
ELE17-00694 Final12/5/201912/6/201912/6/2019 1:22:07 PMPPASS
Phone #: ###-#### Inspection requested via web by Richard Stone...ok to final
ELE19-04695 Electrical Rough-In12/6/201912/6/201912/6/2019 1:07:20 PMPPASS
Josh Phone #: ###-####...
UL listed equipment verified
will require access to panel for final
ELE19-04269 Electrical Rough-In12/5/201912/6/201912/6/2019 12:44:49 PMPPASS
Please call Brian Prussia with any questions or concerns Phone #: ###-#### Inspection requested via web by BRS Permitting...
UL listed equipment
access to service equipment side of house
ELE19-04648 Final12/5/201912/6/201912/6/2019 12:30:36 PMPPASS
Call Mark ###-#### on your way please. If you have any questions please feel free to contact Tony ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan...work complet, GFCI protection..ok to final
ELE19-04648 Electrical Rough-In12/5/201912/6/201912/6/2019 12:29:48 PMPPASS
Call Mark ###-#### on your way please. If you have any questions please feel free to contact Tony ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan...new subpanel, misc circuits, and outlets added...work fished thru walls and attic ok
ELE19-02776 Final12/5/201912/6/201912/6/2019 12:11:26 PMPPASS
Doug Phone #: ###-####...required interior lighting, exterior lighting and outlet complete..ok to final
ELE19-03911 Final12/6/201912/6/201912/6/2019 11:46:58 AMPPASS
Phone #: ###-#### Inspection requested via web by Jonathan Poot...ok to final
ELE19-04238 Final12/6/201912/6/201912/6/2019 11:16:41 AMPPASS
Ryan Phone #: ###-####...panel complete and rewire of damaged wall..ok to final
ELE19-04657 Electrical Rough-In12/5/201912/6/201912/6/2019 10:38:50 AMAPASS
Justin Metcalf ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg...underground to shed ok to cover
ELE14-00542 Final12/5/201912/6/201912/6/2019 10:12:48 AMAPASS
call for door code // Benjamin Phone #: ###-####...new service equipment...ok to final
ELE19-04139 Final12/5/201912/6/201912/6/2019 9:41:35 AMAFAIL
Please call our onsite contact, Ashley: ###-#### before arrival. (This was scheduled yesterday, but only the building was scheduled, so we have to schedule both for 12/6) Phone #: ###-#### Inspection requested via web by BRS Permitting....
permit failing along with contractors permit ELE19-04055 for service change
1..panel needs complete labelling ...every circuit and circuit modification shall be legibly as to its clear, evident and specific use or purpose..408.4(A)
ELE19-04055 Final12/6/201912/6/201912/6/2019 9:40:02 AMAFAIL
final for service change...
1..panel needs complete labelling ...every circuit and circuit modification shall be legibly as to its clear, evident and specific use or purpose..408.4(A)
ELE19-04254 Final12/6/201912/6/201912/6/2019 9:09:54 AMAPASS
Chad Vanorden is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce...ok to final..job complete
ELE19-04254 Electrical Rough-In12/5/201912/6/201912/6/2019 9:09:22 AMAPASS
Chad Vanorden is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce...rough/demo...removal of electrical safed off and new lighting controls
ELE19-03074 Conference12/5/201912/6/201912/6/2019 8:37:46 AMAPASS
Kitchen island conference. Please call when en route. Thanks, Steve. Phone #: ###-#### Inspection requested via web by Steven M Bandkau Jr...discussed island outlet, A/C disconnect, and exterior light at new slider
ELE19-04560 Electrical Rough-In12/5/201912/6/201912/6/2019 8:10:52 AMACANC
Pls contact Brad (Foreman) @ ###-#### 1 hr prior or if you have any questions. Thank you. Inspection requested via web by Rob Maes...no panels got delivered.....will reschedule