ELE18-02246
| Final | 2/12/2019 | 2/12/2019 | 2/12/2019 2:32:35 PM | P | PASS |
|
|
job complete...AFC label applied...ok to final
|
ELE18-04715
| Conference | 2/12/2019 | 2/12/2019 | 2/12/2019 2:20:01 PM | P | PASS |
|
|
I’m requesting a conference for the Common areas. Also a final for the 4th floor rooms due to them only having 2 light fixtures changed out and a recess can LED retro per room. The existing outlets and switches remain.
Thanks
Dan Cox Phone #: ###-#### Inspection requested via web by Dan Cox... discussed with onsite journeyman requirements for lighting retro and scope of work discussed future inspections
|
ELE18-04715
| Final | 2/12/2019 | 2/12/2019 | 2/12/2019 2:17:34 PM | P | PART |
|
|
I’m requesting a conference for the Common areas. Also a final for the 4th floor rooms due to them only having 2 light fixtures changed out and a recess can LED retro per room. The existing outlets and switches remain.
Thanks
Dan Cox Phone #: ###-#### Inspection requested via web by Dan Cox... 4th floor lighting retro and removal/install of outlets finished...ok to occupy floor
|
ELE18-04715
| Electrical Rough-In | 2/12/2019 | 2/12/2019 | 2/12/2019 2:15:29 PM | P | PASS |
|
|
I’m requesting a conference for the Common areas. Also a final for the 4th floor rooms due to them only having 2 light fixtures changed out and a recess can LED retro per room. The existing outlets and switches remain.
Thanks
Dan Cox Phone #: ###-#### Inspection requested via web by Dan Cox... UL listing verified on fixtures being changed out in each rm on all floors... rooms-LED can trim, vanity light and 2 ceiling lights hallway/corridors-wallsconce with LED lamp and new LED lamps in existing flourescent light outlets either complete removal or new tamper resistant ones replaced in hallways
|
ELE19-00417
| Final | 2/12/2019 | 2/12/2019 | 2/12/2019 1:16:37 PM | P | PASS |
|
|
Please call homeowner Barbara before heading over. Thanks Phone #: ###-#### Inspection requested via web by Steven Ragan... ok to final
|
ELE19-00394
| Electrical Rough-In | 2/12/2019 | 2/12/2019 | 2/12/2019 12:37:40 PM | P | PASS |
|
|
garage lid...ok to cover
|
ELE19-00075
| Electrical Rough-In | 2/12/2019 | 2/12/2019 | 2/12/2019 11:45:53 AM | P | PASS |
|
|
ceiling inspection for Jeff Hagen. Phone #: ###-#### Inspection requested via web by Jim Noll.. grid ok...verify projector outlets at final working on pre existing low voltage on grid-removal or raising
|
ELE19-00157
| Final | 2/11/2019 | 2/12/2019 | 2/12/2019 11:12:55 AM | A | PASS |
|
|
Pls contact Brad (Foreman) @ ###-#### or Preston (Electrician) @ ###-#### one hr prior or if you have any questions. Thank you. Inspection requested via web by Rob Maes... labelling, disconnect, and OCPD ok
|
ELE19-00534
| Final | 2/12/2019 | 2/12/2019 | 2/12/2019 11:08:39 AM | P | PASS |
|
|
Please call owner Jo Luke before heading over. She''s hoping the inspection can be done towards the end of the day. Phone #: ###-#### Inspection requested via web by Steven Ragan... job complete...OCPD and GFCI outlet...ok to final
|
ELE19-00534
| Electrical Rough-In | 2/12/2019 | 2/12/2019 | 2/12/2019 11:07:59 AM | P | PASS |
|
|
Please call owner Jo Luke before heading over. She''s hoping the inspection can be done towards the end of the day. Phone #: ###-#### Inspection requested via web by Steven Ragan... circuit moved to other side of house romex thru attic...converted to emt and thhn to new disconnect with GFCI outlet...ok
|
ELE19-00532
| Rough-In Permanent Service | 2/12/2019 | 2/12/2019 | 2/12/2019 10:50:23 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Robert Murray Inspection cancelled from web by: Robert Murray
|
MIS19-00034
| ELE-Conference | 2/8/2019 | 2/12/2019 | 2/12/2019 9:59:12 AM | A | PASS |
|
|
verify permits being pulled...building, plumbing , mechanical, and electrical all needed...must have building by Tuesday... as of 2/12/19 mech perm has been pulled-mec19-00595 building permit is under review-bld19-00422 no electrical/plumbing permit pulled yet
|
ELE15-00539
| ELE-Aging Inspection | 2/12/2019 | 2/12/2019 | 2/12/2019 9:45:06 AM | | PASS |
|
|
final scheduled
|
ELE15-00539
| Final | 2/12/2019 | 2/12/2019 | 2/12/2019 9:44:49 AM | A | PASS |
|
|
ok to final...service on pole ok
|
ELE18-04820
| Final | 2/11/2019 | 2/12/2019 | 2/12/2019 9:18:25 AM | A | PASS |
|
|
Food truck will be in the same location call with any questions thanks! Phone #: ###-#### Inspection requested via web by Trevor Soesbe... ok to final 2 circuits GFCI protected with GFCI breakers all industrial raised covers and blanked circuits where needed
|
ELE19-00495
| Rough-In Permanent Service | 2/11/2019 | 2/12/2019 | 2/12/2019 8:41:01 AM | A | PASS |
|
|
Please contact when done Phone #: ###-#### Inspection requested via web by Thomas wilson.... p/s u/g new ok
|