ELE20-00577
| Electrical Rough-In | 2/18/2020 | 2/18/2020 | 2/18/2020 2:14:59 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins..underground ok to cover...new feeds for new counter location
|
ELE19-04265
| Electrical Rough-In | 2/18/2020 | 2/18/2020 | 2/18/2020 1:41:06 PM | P | PASS |
|
|
Call for access- before 4pm please- Shane Phone #: ###-####...ok to cover
|
ELE20-00433
| Final | 2/17/2020 | 2/18/2020 | 2/18/2020 1:05:51 PM | P | PASS |
|
|
checked wirng in house an found to be in pretty good shape has QO M/B panel power on an seems to be in good working condition Phone #: ###-#### Inspection requested via web by dennis mcneely...occupied residence...job complete...electrician taking on resposibility of interior electrical...outside service ok to final
|
ELE20-00561
| Electrical Rough-In | 2/17/2020 | 2/18/2020 | 2/18/2020 12:27:19 PM | P | PASS |
|
|
Please inspect floor outlet box in lobby concrete.
Thank you! Phone #: ###-#### Inspection requested via web by Darryn Coburn... 2 new floor outlets ok to cover...left side of enterance...3 outlets added with cut in boxes East walls...future inspection for waffle station required
|
ELE20-00011
| Final | 2/17/2020 | 2/18/2020 | 2/18/2020 11:57:25 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Rodney Monroe... 1) GFCI not holding in kitchen 2) island outlets have no power 3) unable to verify A/C...covered for painting of house
|
ELE20-00010
| Final | 2/17/2020 | 2/18/2020 | 2/18/2020 11:51:10 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rodney Monroe...ok to final
|
ELE19-04657
| Final | 2/17/2020 | 2/18/2020 | 2/18/2020 11:25:06 AM | A | FAIL |
|
|
Corbin Metcalf ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg... 1) exterior outlet needs heavy duty inuse cover..406.9(A)
2) panel in shed needs main breaker installed...discussed at rough in...abillity to have more then 6 swipes of hand...225.33 3) exterior lights need rated for damp location...keylesses not rated
|
ELE17-03756
| Permanent Service | 2/12/2020 | 2/18/2020 | 2/18/2020 11:23:19 AM | A | FAIL |
|
|
Justin Metcalf ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg...no access
|
ELE20-00314
| Rough-In Permanent Service | 2/18/2020 | 2/18/2020 | 2/18/2020 10:25:37 AM | A | PASS |
|
|
Please let me know if you have any questions. Phone #: ###-#### Inspection requested via web by Dan Jennings...rough ok to cover...p/s u/g new ok
|
ELE20-00538
| Final | 2/18/2020 | 2/18/2020 | 2/18/2020 9:37:30 AM | P | PASS |
|
|
Replacing Meter Base, Please Call Louis Keller At ###-#### Prior To Going To Site. Thank You! Phone #: ###-#### Inspection requested via web by Louis Keller...ok to final...emergency - meter base replaced...expansion joint added and intersystem bond bridge added
|
ELE20-00538
| Permanent Service | 2/14/2020 | 2/18/2020 | 2/18/2020 9:36:00 AM | P | PASS |
|
|
Replacing Meter Base, Please Call Louis Keller At ###-#### Prior To Going To Site. Thank You! Phone #: ###-#### Inspection requested via web by Louis Keller... p/s reconnect ok
|
ELE19-03762
| Final | 2/14/2020 | 2/18/2020 | 2/18/2020 9:18:11 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Lauren Norris...labelling, disconnect, and OCPD ok
|
MIS20-00051
| ELE-Conference | 2/14/2020 | 2/18/2020 | 2/18/2020 9:01:53 AM | A | PASS |
|
|
correction notice posted...5 days given to start process..future inspection scheduled
|
ELE20-00067
| Final | 2/13/2020 | 2/18/2020 | 2/18/2020 8:48:28 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Scott Campbell...partial for temp occupency of gym..ok remaining janitors closet and locker rooms left for final
|
ELE19-04626
| Electrical Rough-In | 2/18/2020 | 2/18/2020 | 2/18/2020 8:31:43 AM | A | PASS |
|
|
floor heat in master bath Phone #: ###-#### Inspection requested via web by Bonnie Page... ok to cover
|
ELE17-02916
| ELE-Aging Inspection | 2/18/2020 | 2/18/2020 | 2/18/2020 7:52:09 AM | | FAIL |
|
|
notice posted 11/19/19 all disregarding
|