ELE19-01380
| Final | 4/17/2019 | 4/17/2019 | 4/17/2019 2:33:13 PM | P | FAIL |
|
|
Justin Metcalf ###-#### The AC unit is on the right side, go through the gate. Phone #: ###-#### Inspection requested via web by Samatha Solberg... 1) panel shall be labelled completely and legibilly 2) all openings in panel shall be closed...panel blank or spare breaker 3) a service outlet shall be within 25ft of A/C unit
|
ELE18-02665
| Electrical Rough-In | 4/16/2019 | 4/17/2019 | 4/17/2019 2:21:54 PM | P | PASS |
|
|
contact: Rich Bail.... Final ceiling inspection locker room please Phone #: ###-#### Inspection requested via web by Deb Gooden.. ceiling grid complete
|
ELE19-00835
| Permanent Service | 4/16/2019 | 4/17/2019 | 4/17/2019 12:44:32 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Cory Witters... p/s u/g reconnect ok
|
ELE19-01378
| Final | 4/17/2019 | 4/17/2019 | 4/17/2019 12:21:32 PM | P | CANC |
|
|
I am just pulling permits for the basement that the previous owner finished. He informed me that electrical had been put in as part of the original construction - he just added sheet rock and carpet, etc. Please contact me before arrival so that I can open the garage for you. Phone #: ###-#### Inspection requested via web by DENZIL FROST... discussed with homeowner the requirements for inspection...discussed Boise City's stance on taking resposibility for work unseen or inspected...house was previously inspected by State electrical inspector...homeowner unable to provide proof that rough of electrical in basement had ever been inspected...informed I am unable to approve electrical without tearing off sheetrock...I gave him options to be able to get approved-hire electrical contractor or get ahold of State head electrical inspector and get there approval
|
ELE18-04715
| Final | 4/17/2019 | 4/17/2019 | 4/17/2019 11:04:10 AM | P | NR |
|
|
2nd Floor Final. Ron Aitchison ###-#### Phone #: ###-#### Inspection requested via web by Dan Cox...unit not finished for complete floor
|
ELE19-00844
| Final | 4/16/2019 | 4/17/2019 | 4/17/2019 10:45:50 AM | A | NH |
|
|
Call Breckee Brown for info on scheduling a time to meet on site or have owner be home will scheduled ###-####...called and spoke with Jenifer in permiting for contractor and explained issue and need for access to do inspection...she stated she will address
|
ELE19-01379
| Permanent Service | 4/16/2019 | 4/17/2019 | 4/17/2019 10:30:23 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Kotton Corder... not complete at this time..question on grounding requirement...ID Pwr not supplied meter sockit yet
|
ELE19-01370
| Permanent Service | 4/16/2019 | 4/17/2019 | 4/17/2019 10:05:12 AM | A | PASS |
|
|
new 100 amp panel to suit # 12 Shane is the contact ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates... p/s u/g ok to connect
|
ELE19-01351
| Electrical Rough-In | 4/17/2019 | 4/17/2019 | 4/17/2019 9:30:44 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by steve sellers... rough ok to cover
|
ELE19-01316
| Electrical Rough-In | 4/16/2019 | 4/17/2019 | 4/17/2019 8:56:15 AM | A | PASS |
|
|
Clint-firrst 6 units on the left side Phone #: ###-####... rough ok to cover...north 6 units
|